Overview of 40 CFR Part 112 - Georgia Tank & Equipment

Download Report

Transcript Overview of 40 CFR Part 112 - Georgia Tank & Equipment

Petroleum Equipment
Institute
RP 200-13
Recommended Practices for Installation of
Aboveground Storage Systems for Motor
Vehicle Fueling
RP 200-13
Introduction
Scope
Includes aboveground, stationary, shopfabricated tanks. Does not include fieldfabricated storage tanks or storage systems for
liquefied petroleum gases, liquefied natural
gases or compressed natural gases.
RP 200-13
1. Introduction
Emphasizes the Importance
of Using Competent
Installers
RP 200-13
2. Site Planning
Tank Location
Tank Configurations
Property Lines and Bldgs
Tank Spacing Requirements
Bases and Foundations
Retail Service Stations
Commercial Fleet Facilities
Marinas (Change)
Product Deliveries
Traffic Flow
SPCC Plan
Electronic Equipment
Physical Protection
Fire Protection
Utilities
Emergency Planning
Change: Added: See RP1000
RP 200-13
3. Foundations, Support
and Anchorage
General
Soil Analysis
Foundation Design
Excavation
Base Course
Vertical Tank Bases
Horizontal Tank Saddles
Reinforced Concrete Slabs
Anchoring
RP 200-13
4. Dikes
Purpose
Dike Capacity
Dike Construction
Impervious Barrier
Dike Penetraions
Access
Drainage Control
Oil/Water Separator
RP 200-13
5. Vaults and Special
Enclosures
General
Vault Design
Vault Construction
Venting
Leak Detection
Liquid Recovery
Vault Ventilation
Collision Protection
Electrical Installation
Special Enclosures
RP 200-13
6. Tanks
General
Standards (Changes)
Tank Openings
Preinstallation Inspection
Material Handling
Air-and-Soap Test
Changes:
Deleted UL2244 (Tank System)
Added STI F921 (Integral Secondary Containment)
Added STI F941 (Fireguard)
RP 200-13
7. Pumps and Valves
Materials and Design
Pumping Systems
Fire/Emergency Valves
Block Valves
Anti-Siphon Valves
Check Valves
Pressure Relief Valves
RP 200-13
8. Tank Filling, Gauging,
Dispensing and Venting
Materials and Design
Tank Filling
Dispensing Systems
Gauging Systems
Tank Venting
RP 200-13
9. Aboveground Piping and
Fittings
General Requirements
AST Piping Materials
Piping Practices
Piping Layout
Fittings for AST Piping
Testing AST Piping
Piping Corrosion Protection
RP 200-13
10. Underground Piping
and Fittings
General Requirements
Piping Materials
Piping Practices
Layout and Trenches
Backfill and Compaction
Fittings
Corrosion Protection
Fiberglass Piping
Flexible Piping
Containment Sumps
Testing Primary Piping
Testing Secondary Piping
RP 200-13
11. Corrosion Protection
General
Applicability
Coatings
Protection of Buried Components
Galvanic CP
Impressed-Current Sys
Wiring and Electrical
Inspection and Testing
RP 200-13
12. Environmental
Protection
General
Release Detection
Vapor Recovery
RP 200-13
13. Electrical Installation
General Requirements
Classifications
Electrical Equipment
Emergency Shutoff
Wiring
Intrinsically Safe
Grounding and Bonding
Ensuring Uninterrupted Power
RP 200-13
14. Testing and Inspection
General
Test Results
Other Testing
RP 200-13
15. Documentation,
Maintenance and Training
As-Built Drawings
Component Documentation
Scheduled Maintenance
Training
RP 200-13
Appendix A
Size Calculations for Dikes
RP 200-13
Appendix B
Venting
RP 200-13
Appendix C
Code Requirements for
ASTs at Motor Vehicle
Fuel Dispensing Facilities
RP 200-13
Appendix C
Code Requirements
NFPA 30A 2012 (2008)
IFC 2012 (2006)
RP 200-13
Appendix D
Publication Reference