IEPA Implementation of the New Municipal Solid Waste
Download
Report
Transcript IEPA Implementation of the New Municipal Solid Waste
Municipal Solid Waste
Landfill NSPS/EG
Requirements
Illinois EPA
Bureau of Air
Mike Davidson
217/782-2113
Important Dates
•
March 12, 1996
USEPA Promulgates the
NSPS/EG
•
June 17, 1998
IEPA Promulgates 35 IAC 220
Effect of the NSPS/EG -1
•
•
•
•
New Media (Air Emissions) to worry about.
Increased Scrutiny of Landfills from a Air
Emissions point of View.
Differing Terminology and Definitions from
Land Regulations
New Permit and Regulatory Requirements
– More Monitoring and Testing
– More Records
– More Reports
Effect of the New Rules -2
•
•
Memorialization of Rule Requirements
in the Permit
Same Source/Collocation Issues
Importance of NSPS/EG #1
Applicability: Primary trigger based
upon the landfill meeting the Area
Source Criteria in 40 CFR
63.1935(a)(3)
So Far To Date #1
Illinois EPA has Issued over
70 Title V Permits covering
either landfills and/or gas to
energy facilities.
So Far To Date #2
No sources are classified as being
either a major source of HAPs, colocated with a major source of
HAPs or being a MSW landfill with
a bio-reactor.
Importance of NSPS/EG #2
Compliance: Landfills compliance is
based upon the NSPS, EG or
Approved Alternative as per the
NSPS/EG
(40 CFR 63.1955(a) or (c))
NSPS - Applicability
The NSPS applies to MSW landfills
for which construction,
modification, or reconstruction
commences on or after May 30,
1991
EG – Applicability #1
MSW landfills for which
construction, modification, or
reconstruction commences before
May 30, 1991 is subject
EG – Applicability #2
if the landfill has accepted waste
since November 8, 1987, or has
additional design capacity available
for future waste deposition
Title V Requirement
June 10, 1996 for MSW landfills that
commenced construction, modification, or
reconstruction on or after May 30, 1991
but before March 12, 1996;
Ninety days after the date of commenced
construction, modification, or
reconstruction for MSW landfills that
commence construction, modification, or
reconstruction on or after March 12, 1996.
Control Requirement
•
•
Design capacities greater than
or equal to 2.5 million Mg and
2.5 million m3
NMOC Emissions Greater than
50 Mg/yr
NMOC Emissions
•
40 CFR 60.754(a)(1)(i)
n
MNMOC= 2 k Lo Mi ( e-kti) (CNMOC) (3.6 x10-9)
i=1
•
40 CFR 60.754(a)(1)(ii)
MNMOC=2 Lo R (e-kc - e-kt) (CNMOC) (3.6 x10-9)
NMOC Emission Rate
1000.00
CAA
Mg/Yr
100.00
AP-42
10.00
Year
46
20
36
20
26
20
16
20
06
20
96
19
86
19
19
76
1.00
Tier 1; 40 CFR 60.754(a)(2)
• No Testing Required
• Default Equation Values are Used
• Calculation & Report Required
Within 90 days of being affected
40 CFR 60.757(b)(1)(i)(B)
Tier 2; 40 CFR
60.754(a)(3)
•
•
CNMOC Determination Required
Calculation & Report Required
Within 180 days after the first 50 Mg
exceedance
40 CFR 60.757(c)(1)
Tier 3; 40 CFR 60.754(a)(4)
•
•
•
k Determination Required
Calculation uses the Tier 2 CNMOC
Calculation & Report Required
Within 1 year after the first 50 Mg
exceedance
40 CFR 60.757(c)(2)
GCCS plan
Landfill Gas Collection and Control
System Design Plan required within 1
year of the first report which the
emission rate equals or exceeds 50 Mg
per year.
40 CFR 60.752(b)(2)(i) and 60.757(c)
Collection System Requirements
Maximum
gas flow rate
Collect Gas from all areas
– 5 years or more if active; or
–2 years or more if closed or at
final grade.
Sufficient Extract Rate
Minimize off-site Migration
Control System : #1
•
•
Open flare; or
A control system designed and
operated to reduce NMOC by 98%
by weight; or
Control System: #2(a)
•
A enclosed combustor which
reduces NMOC by 98 weight
percent or reduce the outlet NMOC
concentration
Control System: #2(b)
to less than 20 parts per million by
volume, dry basis as hexane at 3
percent oxygen.
Control System: #3
•
Route the collected gas to a
treatment system that processes the
collected gas for subsequent sale or
use
GCCS Startup
Installation of Landfill Gas Collection
and Control System Completed within
30 months after reporting NMOC
emissions 50 Mg/yr
40 CFR 60.752(b)(2)(ii)
Reporting Requirements #1
• Initial and annual design capacity
report
• NMOC emission reports (Annual or 5
year Reports)
• Notification of increases in design
capacity and NMOC emissions
Reporting Requirements #2
• Submittal of design plans and
construction permit applications
• Compliance certifications
• System Removal Reports
• Annual Emission Report
• Excavation in Asbestos Areas
Recordkeeping #1
•
•
•
•
Control and Emission Exceedances
Location of Asbestos
Waste Acceptance Rate
Asbestos Waste Shipment Records
Recordkeeping #2
•
•
•
Gas Collection and Control
Equipment Operating Parameters
New Well Installation
Monitoring Parameters
Guidance and Info
•
USEPA’s Websites
NSPS http://www.epa.gov/ttn/atw/landfill/landflp
g.html
MACT (AAAA) http://www.epa.gov/ttn/atw/landfill/lndfillp
g.html
USEPA Applicability Determination
Index (ADI)
http://cfpub.epa.gov/adi/index.cfm