Twinning Project activities
Arnaud Courtecuisse
Resident Twinning Adviser
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
1
The activities of the project will be adapted in order to
take into account:
• what have been done regarding the WFD’s
implementation (draft PoM and RBMP)
• the inputs of others projects or upcoming ones
……but the spirit will remain the same : share
experience, develop approaches and tools with you and
that will remain after the project.
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
2
Some activities of the project are linked with the WFD’s
implementation and regarding the current state of play of
WFD’s implementation in the four basins, these activities
have to:
• support the revision of the draft Programme of
Measures and River Basin Management Plan that will be
made until the end of 2009
• prepare the follow up (i.e. the implementation of these
PoM and RBMP) and a coordinated reporting to EU
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
3
Description of Key
measures
Who is responsible for
the implementation of
the measures (local
authorities, industry,
agriculture)
Type of measures
(law, incentive, good
practice)
Key water
management issues
Twinning Project BG O7 IB EN 01
Costs
Good status targeted for
2015, 2021 or 2027
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
4
Who is responsible for
the implementation of
the measures (local
authorities, industry,
agriculture)
One of the challenge is not only to identify and assess the
measures that will be include in the PoM but ensure that
these measures will be implemented and check this
implementation.
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
5
All activities of the project should participate to the
development of:
• tools and approaches with economic analysis content :
cost-effectivness, environmental cost assessment,
tarification
• an information system that will integrate economic
information and in particular data collected through the
fees system
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
6
Administrative capacity initial audit
Outputs from
other projects
Final products
Activities
WFD
Information
System
Administrative
capacity
(inc.
fees system)
Guidance documents
Methods
Tools
Training, pilot river basins working group, seminars
Time scale of the twinning project
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
7
building Database and information system (in the
context of the development of a fees regime)
• Revision of draft Programme of Measures will provide :
• unit cost and unit efficiency of measures
• cost impact assessment on economic sectors (e.g. water bill /
household’s available income)
• Revision of River Basin Management Plan will provide :
• environmental benefits information, avoided costs
• water and sanitation price, environmental and resource cost
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
8
Ensure the training of the staff and that guidance
documents, methods and tools are meeting the
objectives and your expectations
• a dedicated working group composed of experts from MoEW and
Basin Directorates (“PoM and Economic analysis”)
• 4 pilot river basins for developing and testing the guidance
documents and tools
• 2 study visits
• a comprehensive and full training process:
ECO WHAT ?
• 3 seminars for a wider dissemination of the outputs of the twinning
and active involvement of stakeholders
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
9
The results from the activities of the project will
disseminated through :
• guidelines, instruments and methods
• the Working Group « PoM and Economic Analysis »
• a regular newsletter
• website
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
10
Благодаря за вниманието…
Twinning Project BG O7 IB EN 01
Strengthening the administrative capacity of Water Management authorities in
Bulgaria for the implementation of Economic Instruments for Water Management
according to the Water Framework Directive 2000/60/EC
11