RECENT GOVERNMENT
POLICIES AND
PROCEDURES ON
PROCUREMENT
10 July 2008
Dennis Lorne S. Nacario
Updates on Procurement Policies
General Updates
Procurement of Goods
Negotiated Procurement
General Updates
Issuance
Title / Subject Matter
Approved
Effectivity
Resolution
05-2007
Amending Secs. 23.3 & 24.13,
IRR-A
4 May 2007
14 Aug 2007
Resolution
22-2007
Amending Sec. 17.6, IRR-A and 28 Sept 2007
providing for Annex “G”
Manuals
approval
Resolutions approving the Local
Government
Procurement
Manuals
and
Customized
Procurement Manuals
Various
10 Nov 2007
Various
Procurement of Goods
Issuance
Title / Subject Matter
Approved
Effectivity
Resolution
23-2007
Revised Guidelines on Extension 28 Sept 2007
of Contracts for General Support
Services
10 Nov 2007
Resolution
24-2007
Guidelines on Procurement of 28 Sept 2007
Security and Janitorial Services
10 Nov 2007
Circular
01-2008
Clarification on the Adoption of 7 March 2008 7 March 2008
Additional
Eligibility
and
Technical Documents to Ensure
Compliance with Labor Laws and
Other Social Legislation
Negotiated Procurement
Issuance
Title / Subject Matter
Approved
Effectivity
Resolution
03-2007
Amending Sec. 53 (e), IRR-A to
include infrastructure projects
and consulting services
30 May 2007
24 July 2007
Resolution
04-2007
Amending Sec. 53, IRR-A to
include lease of privately owned
real estate for official use
4 May 2007
14 Aug 2007
Resolution
12-2007
Amending Sec. 53, IRR-A to 29 June 2007
include participation of NGOs in
public procurement
10 Nov 2007
GENERAL UPDATES
Updates as of
July 2008
General Updates
Design and Build
What is Design and Build (DB) Scheme?
Design-Build
Project delivery system where the procuring entity contracts
with a single entity to perform both design and construction
under a single design-build contract
Design-Bid-Build (Traditional Method)
Project delivery system where the procuring entity contracts
separately with a designer and constructor
Is DB Scheme allowed?
Legal Basis
Section 17.6 of IRR-A expressly recognizes the use of
design and build scheme in the procurement of
infrastructure projects
When is it applicable?
Flagship, priority, and fast track projects (included in the MTPIP
and/or the RDIP)
Requiring advanced engineering or construction technologies or
whose intellectual property rights belong to private companies
Design, equipment, plant and construction can be provided
exclusively by a company or where manufacturer’s know-how is
important in the construction of such facility
Small projects with previously approved drawings or standardized
designs where innovation in design and construction methods will
result in lower costs and higher quality projects
What are the
application?
conditions
for
Include in the Annual Procurement Plan
Create Design and Build Committee (optional)
Conduct Preliminary Design and Construction Studies
its
What are the pros and cons of a DB
Scheme?
Advantages
Disadvantages
• One contractor bears all
risks and responsibilities
• Too much discretion given
to contractor
• Reduced
design
and
construction periods and
final project cost
• Difficulty in predicting the
final cost
• Assured quality
structure
• The end-result may not
exactly be in accordance
with what the procuring
entity required
of
the
Design-Build Scheme
Concept Preliminary Select
Planning
DesignDesign
Builder
Final Project Design
& Clearances
Construction
Extensive Contractor
Input
Minimal to Extensive
Contractor Input
Design-Build Associated
Time Savings
Design-Bid-Build Scheme
Concept Select
Preliminary
Planning Designer
Design
Final Project Design
& Clearances
Minimal Contractor
Input
Source: http://www.fhwa.dot.gov/reports/designbuild/designbuild.htm
Select
Contractor
Construction
Extensive Contractor
Input
PROCUREMENT OF
GOODS
Updates as of
July 2008
Procurement of Goods
Contract Extension
What are the previous rules on contract
extension?
GPPB Resolution 08-2005 (28 April 2005)
Contract extension allowed up to 2 months
After 2 months, GPPB approval
GPPB Resolution 03-2006 (20 January 2006)
Contract extension allowed up to 6 months
After 6 months, GPPB approval
What
is
the
guidelines for?
contract
extension
General policy is to discourage contract extensions
Objectives:
To monitor and limit contract extension to certain conditions
To prevent hiatus in support services
To avoid interruption in government service
What are the requirements for contract
extension?
Prior approval of HOPE upon BAC recommendation.
In addition, if contract extension exceeds 6 months, HOPE
shall inform GPPB in writing.
What are the conditions for contract
extension?
No contract extension shall exceed one (1) year
Original contract awarded in accord with RA 9184 and its IRR-A
Procuring entity has substantially undertaken the procurement
activities prior to award
Contract extension is due to circumstances beyond its control
and new contract cannot be awarded within a month after
expiration
Contract extension is merely an emergency measure to maintain
status quo
Incumbent service provider has not violated any of the provisions
of the original contract
Terms and conditions of the original contract have not been
changed or modified
What are the conditions for contract
extension?
No contract extension shall exceed one (1) year
Original contract awarded in accord with RA 9184 and its IRR-A
Procuring entity has substantially undertaken the procurement
activities prior to award
Contract extension is due to circumstances beyond its control
and new contract cannot be awarded within a month after
expiration
Contract extension is merely an emergency measure to maintain
status quo
Incumbent service provider has not violated any of the provisions
of the original contract
Terms and conditions of the original contract have not been
changed or modified
Procurement of Goods
Security and Janitorial Services
What are the salient features of this
Guidelines?
Additional Technical Parameters
Evaluation is not based solely on cost
Multi-year (not to exceed 3 yrs.)
Saves time and resources for bidding
Allows service contractors to adjust, without being too
familiar
What are the additional technical
parameters for security services?
Stability
Yrs. of experience
Liquidity
Organizational set-up
Resources
No.
No.
No.
No.
of licensed firearms
and kind of communication devices
and kind of motor powered vehicles
of licensed guards
Security Plan
Other Factors
Recruitment and selection criteria
Completeness of uniforms and other paraphernalia
What are the additional technical
parameters for janitorial services?
Stability
Yrs. of experience
Liquidity
Organizational set-up
Resources
No. and kind of equipment and supplies
No. of janitors and supervisors
Housekeeping Plan
Other Factors
Recruitment and selection criteria
Completeness of uniforms and other paraphernalia
What are the rules on the additional
technical parameters?
Minimum standard for each parameter is determined by
the procuring entity
Additional technical parameters and minimum standard
must be expressly stated under technical specifications
Additional documents may be required as part of bidder's
technical proposal
Non-discretionary
"pass/fail"
criterion
determining compliance with parameters
is
used
in
What are the rules on multi-year
contracts for these services?
Not to exceed three (3) years
Invitation to Apply for Eligibility and to Bid must state:
All bid prices shall be fixed throughout the term of the
contract, except:
Term of the contract to be bid
ABC for the first year only
Increase in minimum daily wage and taxes
Procuring entity sees the need for an increase or decrease in
the number of guards or janitors
Financial Proposal shall contain a breakdown of all costs
What are the rules on multi-year
contracts for these services?
Satisfactory level of performance throughout term of
contract must be maintained based on following:
quality of service delivered
time management
management and suitability of personnel
contract administration and management
provision of regular progress reports
Before end of each year, procuring entities shall conduct a
performance assessment
If not favorable, the procuring entity may pre-terminate
the contract
Procurement of Goods
Additional Eligibility
Documents
and
Technical
What is the purpose of GPPB Circular
01-2008?
Advise procuring entities on the following:
Implied repeal of Memorandum Circular 80, Series of 1994
―
MC 80 mandates the submission of: (i) an undertaking to pay
worker at least the minimum wage; (ii) an undertaking to
comply with the SSS law; and (iii) a clearance from DOLE and
SSS that there is no pending administrative case for violation of
SSS and minimum wage laws
Guiding principles on the adoption of additional eligibility or
technical documents
What are the guiding principles on
adoption of additional documents?
General Policy: Discourage imposition of additional eligibility
and technical documents
Requirement for a clearance or certificate of no pending
administrative case is prohibited for being violative of due
process
Post-qualification should cover verification on the following:
Compliance with the mandated minimum wage
Remittance required under SSS, PHIC, and PAG-IBIG
Absence of final judgment on violation of any labor law
Clearances may be required during contract implementation
NEGOTIATED
PROCUREMENT
Updates as of
July 2008
Negotiated Procurement
Agency to Agency Agreement
What is the amendment about?
Sec. 53 (e), IRR-A
Covers infrastructure projects, consulting services, and
goods
Rationale:
―
General policy is to outsource
―
Except when it is more efficient and economical to
purchase from another government agency
Definition of government agency excludes those formed
under the Corporation Code of the Philippines
When are the
Agreements?
conditions
in
A-A
General Conditions
Favorable cost-benefit analysis
Does not exceed 25% of PE’s total procurement budget
Servicing Agency (SA) has the mandate to deliver/perform
Servicing Agency owns or has access to necessary tools and
equipment
PE may require SA to post performance and/or warranty
security
When are the
Agreements?
conditions
in
A-A
For infrastructure projects, SA must have:
Track record of completed or supervised similar project at least
50% of the project at hand
Private contractors cannot be engaged to undertake the project
―
Implement project in-house, by job-order, or through the
pakyaw contracting system
How is it done?
Conduct cost-benefit analysis
Secure SA’s certificate of compliance
with requirements
BAC recommendation and HOPE
approval
Enter into MOA
Post in PhilGEPS, PE website, and
conspicuous place
Negotiated Procurement
Lease of Privately-Owned Real Estate
for Official Use
What lease transactions are covered?
Scope and Application
Lease contracts for privately-owned real properties for
government use
Lease of government-owned buildings/spaces for private use
is still governed by DBM-DENR-DPWH Joint Circular No. 1,
dated 30 September 1987
What are the principles governing this
transaction?
Guiding Principles
Preference is to lease from other government agencies
Choice of location should be governed by prudence, economy,
suitability of area to PE’s mandate, accessibility to PE’s clients
Rent must be reasonable
Rent + Additional Expenses (assoc. dues, etc.) < ABC
How is it done?
End user unit
conducts costbenefit analysis
End user unit
conducts market
analysis of
prevailing rental
rates
BAC evaluates and
makes a
recommendation
HOPE evaluates and
approves BAC
recommendation
Include/Update APP
BAC prepares
technical
specifications and
draft lease contract
Post notice in
PhilGEPS for 7 days
After 7 days, BAC
shall invite at least
three prospective
lessors
Submission and
Opening of sealed
price quotations
BAC determines
Lowest Calculated
Bid (LCB)
BAC assesses
reasonableness of
LCB
If unreasonable,
next LCB; If all
unreasonable, BAC
checks prevailing
market rate
If LCB is lower than
prevailing market
rate
BAC recommends
award to LCRB
HOPE approves
recommendation
and awards contract
How is reasonableness of rental rate
determined?
Evaluation Methods
Computation based on Observed Depreciation
―
Uses depreciation rate as determined by the BAC upon
meticulous ocular inspection of the actual condition of the
building/space
Computation based on Straight Line Depreciation
―
Uses depreciation rate determined from a
Structural Depreciation provided by the DPWH
Table
of
What are the terms and conditions for
lease?
Lease contracts may be entered into on a multi-year basis,
subject to DBM guidelines
Procuring entity has the flexibility to negotiate with lessor
for the most advantageous terms and conditions to
government
Negotiated Procurement
NGO
Participation
Procurement
in
Public
When may NGOs be given due
preference in government contracts?
If appropriation law/ordinance earmarks an amount for
projects to be specifically contracted out to NGOs
Public bidding limited to NGOs
Enter into negotiated procurement under Sec. 53 (j), IRR-A
What are the requirements in NGO
participation in public bidding?
IAEB advertisement and posting in accordance with Sec.
21.2.1, including the following:
legal basis or appropriation law or ordinance
statement that project is limited to NGOs
In determining NGO’s eligibility, following documents are
required in lieu of or in addition to those under Secs. 23.6
or 24.7.1:
CDA registration certificate in lieu of SEC registration certificate
Latest articles of incorporation
Audited financial statements for the past 3 years
What is the process under Sec. 53 (j), IRR-A?
Posting of notice
in PhilGEPS for 7
days
Invitation at
least 3
prospective
NGOs
Submission and
opening of
sealed price
quotations
Determination of
LCB (LCB should
not include any
profit margin)
Assessment of
responsiveness
of LCB
Submission of
eligibility
documents by
LCB
Signing of MOA
and posting of
performance
security
Posting of
warranty security
after complete
performance