Electricity Market Development Prospects
• Due to substantial depreciation and lack of power facilities investors show strong
interest in this sector. In the near future, large investments will be made in the electric
power industry.
kW in millions
Required capacity
Obsolete capacity
Operating capacity
Structure of Research and Development
Facilities (RDF) of RAO UES of Russia
RAO UES of Russia
VNIPIENERGOPROM,
Moscow
Volga Power Engineering Center,
Samara
Siberian Power Research and
Engineering Center,
Novosibirsk
Northwest Research and
Engineering Center,
Saint Petersburg
Urals Power Engineering Center,
Yekaterinburg
South Center of Power
Engineering,
Rostov
Research Institutes
Power Engineering Centers
Engineering Center UES, Moscow
Special Design Office of Termal Power
Equipment VTI,
Moscow
Dalselenergoproekt, Khabarovsk
Sale Schedule for RDF Subsidiaries of RAO UES of Russia
May 20, 2008
Siberian Power Research and
Engineering Center, Novosibirsk
May 21, 2008
To be announced
Special Design Office of Termal Power
Equipment VTI,
Dalselenergoproekt,
Khabarovsk
Moscow
Engineering Center UES,
Moscow
Northwest Research and Engineering
Center,
Saint Petersburg
South Center of Power Engineering,
Rostov
Volga Power Engineering Center,
Samara
Urals Power Engineering Center,
Yekaterinburg
VNIPIenergoprom,
Moscow
Restructuring of RDF Subsidiaries
•
•
The Board of Directors of RAO UES of Russia adopted a resolution on a spin-off of real property from RDF
subsidiaries (listed below) into stand-alone Companies (JSC “Real Estate”) and the execution of 5-year real
property lease contracts between RDF subsidiaries JSC “Real Estate.
For the purposes of maintaining the key personnel, management and archives of RDF subsidiaries, the
management is offered an option program under which the management is granted the opportunity to
purchase a block of 25%+1 share before 2013.
JSC ”RDF subsidiary”
JSC ”RDF subsidiary”
JSC “Real Estate”
VNIPIenergoprom,
Moscow
Engineering Center UES,
Moscow
Volga Power Engineering Center, Samara
December 2007
February - May 2008
March – May 2008
Urals Power Engineering Center,
Yekaterinburg
Northwest Research and Engineering Center,
Saint Petersburg
Siberian Power Research and Engineering
Center, Novosibirsk
South Center of Power
Engineering, Rostov
Registration of JSC
“Real Estate”
Registration of
property rights
Execution of lease
agreements
SKB VTI: Company Overview
Moscow
Key financial performance indicators of SKB VTI in 2007,
rubles in thousands
Revenue from the sale of goods, products, work, services
70 ,891
Cost of goods, products, work, services sold
47 ,382
Gross profit
23 ,509
Administrative expenses
20 ,510
Sales profit
2 ,999
Profit before tax
2 ,217
Net profit of the accounting period
1 ,479
SKB VTI
100% of shares are beneficially owned by
RAO UES of Russia
Headcount:
Method and period of sale:
Public auction
May 21, 2008
Starting price of 75%-1 share -> 80 000 000 rubles
76 people,
including engineering staff of 35 people
SKB VTI: Company Overview
Areas of Activity
integrated engineering of the upgrading and rehabilitation of
CHPPs using gas-turbine and combined-cycle gas
technologies;
design technology developments in the area of boiler and
thermal equipment for CHPPs and TPPs for the purposes of
raising the efficiency of combustion processes, improving
operating technology and solving environmental issues;
operations related to the design of equipment for the nuclear
power industry.
SKB VTI: Company Overview
Major Completed Projects
•
for RAO UES of Russia: feasibility study of the upgrading of Bryanskaya TPP;
•
Vnukovsky Aviaremontny Zavod No. 400: development of the working project for the
rehabilitation of 10 MW gas-turbine test bed;
•
Mobilnye GTTPPs: development of the working project for the linkage of Mobilnye
GTTPPs with a unit capacity of 22.5 MW at the Moscow and Moscow Region
substations;
•
for TGK-5: preparation of the justification of investments in the rehabilitation of
Kirovskie CHPP-1 and CHPP-3;
•
for Mosenergo: working project for the rehabilitation of the Station 9 TGME-464
boiler for the purpose of reducing NOx emissions from CHPP-11;
•
Development of engineering documentation for a decontamination bath of the
control and protection system (CPS) actuators at an NPP (Tianwan in China).
Dalselenergoproekt: Company Overview
Khabarovsk
Key financial performance indicators of
Dalselenergoproekt in 2007, rubles in thousands
Revenue from the sale of goods, products, work, services
33,139
Cost of goods, products, work, services sold
30,358
Gross profit
Administrative expenses
2, 781
Incl. in the
prod. Cost
Sales profit
2, 781
Profit before tax
1, 387
Net profit of the accounting period
738
Dalselenergoproekt ( www.dalsep.ru )
100% of shares are beneficially owned by RAO
UES of Russia
Headcount:
- 48 people,
including engineering staff of 25 people
The principal asset of Dalselenergoproekt is the office building located at: Khabarovsk, ul. Frunze, 126
with a total area of 1,040 square meters (the land plot occupies 1,393.4 square meters).
Method and period of sale:
Public auction
May, 2008
Starting price of 75%-1 share (the appraiser's report will be completed and approved
by the Appraisal Committee of RAO UES of Russia in the 2nd decade of April 2008)
Dalselenergoproekt: Company Overview
Areas of Activity
Development of electricity supply models, including prospective
development of regions, districts, cities/towns and facilities located in rural
and urban areas.
Engineering survey for the design, construction and operation of
enterprises, buildings and facilities in the core area of activity.
Design of 0.38-220 kV (overhead, cable) transmission lines and substations,
repair stations, dwelling houses and other facilities in Eastern Siberia, Far
East and Extreme North, including the Magadan, Kamchatka Regions and
the Sakhalin Region in an environment of permafrost soil, seismic activity,
sea salt deposits and low negative temperature.
Dalselenergoproekt: Company Overview
Major Completed Projects
•
35/6 kV Gorka substation project and 35 kV HV line branches in the South
district of Khabarovsk;
•
construction of fiber-optic transmission line (FOTL) Uglegorsk – Krasnogorsk
– Ilyinsk – Tomari – Chekhov – Kholmsk
•
rehabilitation of 35kV HV line of 35/6 kV Tushino substation - 35/6 kV
Mongokhto substation in the Vaninsky district;
•
Design and development of 35 kV double-circuit HV line, Sakhalin Island,
from T 126 pole (Khomutovo substation, Mitsulevka substation) to the 35/10
kV substation being designed;
•
re-equipment of 0.4/6-10-35 kV HV line networks of the villages of Bystrinsky
district.
Urals Power Engineering Center: Company Overview
Yekaterinburg
Key financial performance indicators of Urals Power
Engineering Center in 2007, rubles in thousands
Revenue from the sale of goods, products, work, services
1,761,964
Cost of goods, products, work, services sold
1,598,598
Gross profit
386,342
Administrative expenses
222,976
Sales profit
163,366
Profit before tax
138,436
Net profit of the accounting period
91,387
Urals Power Engineering Center
( www.iceu.ru )
100% of shares are beneficially owned by
RAO UES of Russia
Headcount:
1,838 people,
including engineering staff of 1,439 people
Method and period of sale:
Public auction
May 20, 2008
Starting price of 75%-1 share -> 1 125 000 000 rubles
Urals Power Engineering Center: Company Overview
Areas of Activity
Integrated design and engineering of the construction and rehabilitation of power
facilities: TPPs, CHPPs, CCGTs/CHPPs, GTUs/CHPPs, large boiler plants; highvoltage lines and 0.4–500 kV substations;
organization and conducting of integrated engineering survey;
front-end engineering, supply, commissioning and setup of equipment;
environmental impact assessment and safety review using state-of-the-art testing
methods;
performance of functions of prime contractor and owner/developer;
development and setup of heat supply models for cities/towns and large industrial
facilities;
research activities with respect to generic issues related to the electric power
industry and power system development, including the issues of forecasting
electricity and heat supply, the needs for commissioning new generation facilities and
electric networks.
Urals Power Engineering Center: Company Overview
Major Completed Projects
Engineering Activities:
1. A set of startup operations related to the preparation of industrial site for the construction of the 4th
power unit for Rosenergoatom Concern, Beloyarskaya nuclear power plant;
2. Operations related the creation of the Zeyskaya HPP Automatic Electricity Metering System for
Zeyskaya HPP
3. Full set of startup operations and testing of the 1st startup facility of CHPPs for FGUP
Uralvagonzavod
4. Construction of MiniHPP in the Sverdlovsk Region for the Ministry of Industry, Energy and Science
of the Sverdlovsk Region
Design Activities:
1. Rehabilitation of 220 kV Kholmogorskaya – Pul - Yakha, Kholmogorskaya – Avrora high-voltage line
for Transmission Networks of Western Siberia, a branch of FGC UES
2. 500 kV Kurgan – Kozyrevo transmission line for Spetssetstroy
3. Chelyabinskaya CHPP-3. Engineering documentation of startup power unit No. 2.
4. Uralkali. Construction of GTUP power units for BKPRU-1,4
5. Surgutneftegaz. GTUP of the Talakanskoe field, booster pump station of the Zapadno-Chigorinskoe,
Severo-Labatiuganskoe, Tromyeganskoe fields.
Engineering:
1. Selection of facilities, gathering of initial data, development of terms of reference and technical and
commercial proposals of three pilot projects for the creation of small-scale power generation facilities
in the Urals Region for the representative office of RAO UES of Russia managing the joint-stock
companies of the Urals part of Russia.
2. Surgutskaya TPP-2. Pre-design development of rehabilitation options
3. Troitskaya TPP. Development of the pre-feasibility study and terms of reference concept.
Volga Power Engineering Center: Company Overview
Samara
Key financial performance indicators of Volga Power
Engineering Center in 2007, rubles in thousands
Revenue from the sale of goods, products, work, services
497,725
Cost of goods, products, work, services sold
320,605
Gross profit
177,120
Administrative expenses
126,774
Sales profit
50,346
Profit before tax
22,513
Net profit of the accounting period
7,900
Volga Power Engineering Center
( www.ntc-volga.ru )
100% of shares are beneficially owned by
RAO UES of Russia
Headcount:
647 people,
including engineering staff of 416 people
Method and period of sale:
Public auction
May 20, 2008
Starting price of 75%-1 share -> 360 000 000 rubles
Volga Power Engineering Center: Company Overview
Areas of Activity
DESIGN
Preparation of project documentation for the construction, rehabilitation, expansion and re-equipment of:
-CHPPs, TPPs, HPPs and boiler plants, utilities systems, including heating, ventilation, water
supply, sewage and air conditioning networks and systems.
-electric networks and substations of up to 1,150 kV.
-gas (enterprises) facilities, design of gas pipelines from gas distribution stations or connection
point to the customer.
Design of any type of industrial facilities.
Development of models for the integrated use and protection of water resources adjusted for
environmental protection in the construction of water facilities.
Design of 35 kV, 110 kV overhead transmission lines.
Design of water development facilities, navigation facilities, dams, irrigation channels, coastal engineering
protection systems.
INTEGRATED ENGINEERING SURVEY on construction sites and transmission line routes, geological and
water survey, geodetic survey.
EXAMINATION of water development facilities, building structures, residential and industrial buildings,
process plants.
STARTUP AND COMMISSIONING of primary and auxiliary mechanical equipment, operational tuning of
boiler equipment and chemical water treatment plants.
ENERGY AUDIT and certification of power production facilities and processes, development of energy
conservation activities.
ENERGY PROJECT APPRAISAL
Volga Power Engineering Center: Company Overview
Major Completed Projects
•
for FGC UES, Center Transmission Networks: integrated re-equipment of 500/220/110 kV
Arzamasskaya – Proekt substation;
•
for ENERGOTREST: Prospective development model for 35-110kV electric networks of the Nizhni
Novgorod Region for 2007-2015;
•
for TsentrESP, Moscow: adjustment of the development model for Middle Volga IPS up to 2020,
including the adjustment of the 220kV or Higher-Voltage Electric Network Development Model;
•
for the Ministry of Transport, Communication and Motor Roads of the Samara Region: performance
of surveying operations and preparation of design documentation on the construction of
transportation consolidation center for handling cargos and containers in the Samara Region;
•
for Zhigulevskaya HPP: working project development. Rehabilitation of the building section, power
equipment, URZAiA, SN with the feasibility study of options of an ORU-500 kV outdoor switchgear at
Zhigulevskaya HPP;
•
for Engineering Center: Syzranskaya CHPP. Construction of CHPP-200 combined-cycle gas turbine
for the needs of Syzranskaya CHPP, a branch of Volzhskaya TGK;
•
for Volzhskaya TGK: Saratov Heat Networks - working project: transition of thermal loads of the
customers of 22 municipal boiler plants to centralized sources.
South Center of Power Engineering : Company Overview
Rostov-on-Don
Key financial performance indicators of South Center of
Power Engineering in 2007, rubles in thousands
Revenue from the sale of goods, products, work, services
Cost of goods, products, work, services sold
Gross profit
Administrative expenses
1,082,323
986,979
95,344
incl. in the
prod. Cost
Sales profit
95,344
Profit before tax
77,844
Net profit of the accounting period
50,288
South Center of Power Engineering
100% of shares are beneficially owned by
RAO UES of Russia
Headcount:
1165 people,
including engineering staff of 416 people
Method and period of sale:
Public auction
May 20, 2008
Starting price of 75%-1 share -> 625 000 000 rubles
South Center of Power Engineering : Company Overview
Areas of Activity
Startup and Commissioning
installation and startup;
operational tuning and guarantee tests;
commissioning for pilot and industrial operation.
Design and Development
10-500 kV transmission lines and substations;
0.4 kV distribution networks;
self-contained and back-up energy sources;
Relay Protection and Automatic Equipment systems for electric networks;
dispatching systems;
Steam-turbine, gas-turbine and combined-cycle gas TPPs using all types of fuel;
heat networks, boiler plants;
renewable energy power plants.
Expert services
energy surveying;
development of engineering solutions for the extension of useful life of individual power equipment;
calculation of loss standards for electric and heat networks;
solving the issues of electromagnetic compatibility for power facilities;
expert review and calculation of electricity and heat tariffs by the FTS of Russia and Regional Energy
Commissions of the constituent entities of the Russian Federation;
metrological examination and servicing.
South Center of Power Engineering : Company Overview
Major Completed Projects
VESP
•
Installation of reactive power compensator at 500 kV Balashovskaya substation.
YuzhESP
•
Design of the title "500kV High Voltage Line Volgodonskaya NPP – Nevinnomyssk with a 500kV
Substation and 330kV High Voltage Line Branches." Length of 500kV HV transmission line
Volgodonskaya NPP – Nevinnomyssk: 416.37 km; transmission capacity: 600 MW.
RoTEP
•
Justification of investments and business plan of a project for the rehabilitation of power unit No. 8 of
Novocherkasskaya TPP adjusted for an option for the construction of a new power unit (No. 9) on a
free site from a temporary flange using circulating fluidized-bed technology.
•
Completion of construction of the 3rd power unit on the base of PSU-800 of a branch of
Berezovskaya TPP (Approved portion and engineering documentation).
RoSEP
•
Development of a project for a 35kV single-circuit high voltage line "T-10", T-8A traction, 35kV high
voltage line branches to the substations T-1, Troitskaya-1, T-8 and 35/6kV T-8A substations
(Severnaya) for the supply of electricity for the future development of Taganrog Northern residential
area.
YugORGRES
•
Sochinskaya TPP project appraisal, development of forecast electricity (capacity) balance for
Sochinskaya TPP for 2005-2009. Fulfillment of the functions and duties of the Parent Startup and
Commissioning Entity in the performance of startup and commissioning operations for the startup
facility of Sochinskaya TPP.
•
Performance of a set of startup and commissioning operations and testing for the equipment of GTU
of Belgorodskaya CHPP in its commissioning. Fulfillment of the functions and duties of the Parent
Startup and Commissioning Entity.
Engineering Center UES : Company Overview
Moscow
Key financial performance indicators of Engineering Center
UES in 2007, rubles in thousands
Revenue from the sale of goods, products, work, services
6,578,254
Cost of goods, products, work, services sold
5,507,731
Gross profit
1,070,523
Administrative expenses
809,848
Sales profit
260,675
Profit before tax
281,339
Net profit of the accounting period
176,555
Engineering Center UES( www.powereng.ru )
100% of shares are beneficially owned by
RAO UES of Russia
Headcount
Method and period of sale:
Public auction
May 2008
Starting price of 75%-1 share -> 2 300 000 000 rubles
3,108 people,
including engineering staff of 1,784 people
Engineering Center UES : Company Overview
Areas of Activity
provision of integrated engineering services to electric power
enterprises;
development of projects for new construction, rehabilitation and reequipment of electric power facilities (design and research, startup
and commissioning, R&D , etc.);
organization and conducting of appraisal of projects for the reequipment and new construction of electric power facilities;
performance of the functions of Owner of the new construction and reequipment of electric power facilities;
preparation of tendering processes and organization of the
procurement of engineering equipment for electric power enterprises.
Engineering Center UES : Company Overview
Major Completed Projects
In the heat power industry:
- Sochinskaya TPP, 2хCCGT-39 with a capacity of 78 MW;
- Kaliningradskaya CHPP-2, unit No. 1, CCGT with a capacity of 450 MW;
- Luch GT CHPP in Belgorod, 2хCCGT-30 with a capacity of 60 MW;
- 300 MW Wong-Bi TPP in Vietnam;
- Ivanovskaya TPP, unit No. 1 CCGT with a capacity of 325 MW;
- CHPP of the Moscow City International Business Center, unit No. 2 with a capacity
of 116 MW;
In the hydropower industry:
- 2,000 MW Bureyskaya HPP;
- 60 MW Aushigerskaya HPP, Kabardino-Balkaria;
- 60 MW Yumaguzinskaya HPP, Bashkiria;
- 520 MW Kapanda HPP, Angola;
- 700 MW Yali HPP, Vietnam;
- 1,000 MW Teri HPP, India;
- 242 MW Al-Vahda, Morocco.
Engineering Center UES : Company Overview
Unique Technologies:
•
•
•
•
determination of elastic behaviour and deformation characteristics, anisotropy
and discontinuity of rock masses using the method of seismic sounding;
diagnostic testing of engineering facilities using the method of low-amplitude
oscillations;
justification of 3-D seismic resistance of facilities;
instrumental microseismic zoning using latest-generation seismic recorders.
РDМS (Plant Design Management System), which is a three-dimensional
computer-assisted design system, was implemented and operates as a backbone
computer-assisted design system. State-of-the-art software solutions are used for
developing certain sections of the three-dimensional modeling and calculationbased justification project. These include various modifications of Civil 3D Plant4d, Electrics 3D, Automatics ADT, Inventor, etc.
Siberian Power Research and Engineering Center:
Company Overview
Novosibirsk
Key financial performance indicators of Siberian Power
Research and Engineering Center in 2007 rubles in
thousands
Revenue from the sale of goods, products, work, services
1,169,988
Cost of goods, products, work, services sold
897,525
Gross profit
272,463
Administrative expenses
259,799
Sales profit
12,664
Profit before tax
190,173
Net profit of the accounting period
129,263
Siberian Power Research and Engineering Center
( www.energosib.ru )
100% of shares are beneficially owned by RAO
UES of Russia
Headcount:
1,559 people,
including engineering staff of 966 people
Method and period of sale:
Public auction
May 20, 2008
Starting price of 75%-1 share -> 950 000 000 rubles
Siberian Power Research and Engineering Center:
Company Overview
Areas of Activity
Research and engineering support and preparation of a strategy for the
development of heat, electric and hydro power industry of Siberia and the Far
East;
Development of models for the distribution of capacity by power plants into the
power system;
Development and implementation of master plans of electricity and heat supply
to the cities/towns and human settlement of the Siberian region;
Organization of integrated work performance: research, R&D, engineering
survey for the construction of CHPPs, TPPs, mini CHPPs, mini HPPs, boiler
plants, transmission lines, substations;
Conducting of energy audit э, development and implementation of energy
conservation programs;
Organization and conducting of appraisal of power facility re-equipment and
rehabilitation projects.
Siberian Power Research and Engineering Center:
Company Overview
Major Completed Projects
•
for GUDPV Boguchanckaya HPP: school for 864 pupils, Kodinsk, Krasnoyarsk
Territory
•
for EMK-Engineering company: construction of 220kV addition to PP-110 kV.
Crossing station with the installation of 2*125 MVA autotransformers.
•
for Giprotruboprovod: expansion of the Eastern Siberia – Pacific Ocean pipeline
system. External electricity supply. Section No. 1, Ust-Kut-Talakanskoe field.
Booster station No. 10.
•
for Giprotruboprovod: “Expansion of the Eastern Siberia – Pacific Ocean (ESPO)
pipeline system. Section No. 1. Ust-Kut-Talakanskoe field. Linear portion”. The
following sections of 10 kV HV line along a road: from 613 km to 653 km; from 653
km to 694 km; from 694 km to 786 km; from 786 km to 868 km; 1 km.
•
for AK Yakutskenergo: external electicity supply to the village of Eldikan. 110 kV HV
line. Sulgachi-Eldikan with Sulgachi substation. Working documents
Northwest Research and Engineering Center:
Company Overview
Saint Petersburg
Key financial performance indicators of Northwest
Research and Engineering Center in 2007, rubles in
thousands
Revenue from the sale of goods, products, work, services
1,058,932
Cost of goods, products, work, services sold
781,995
Gross profit
276,937
Administrative expenses
175,655
Sales profit
101,282
Profit before tax
49,303
Net profit of the accounting period
29,995
Northwest Research and Engineering Center
( www.nwec.ru )
100% of shares are beneficially owned by RAO
UES of Russia
Headcount:
893 people,
including engineering staff of 631 people
Method and period of sale:
Public auction
May 20, 2008
Starting price of 75%-1 share -> 625 000 000 rubles
Northwest Research and Engineering Center:
Company Overview
Areas of Activity
Design Activities
design of 110 kV or higher-voltage main power grids and substations and auxiliary facilities;
design of 0.4 kV or higher-voltage distribution networks and substations and auxiliary facilities;
design of new, expansion and re-equipment of the existing thermal power plants, combined heat
and power plants, boiler plants, electric boiler plants, heat pump stations and other sources of
heat and electricity supply;
design of cable, radio relay, fiber-optic and other links, automatic telephone systems, highfrequency channels, relay protection, automatic protective devices, teleautomation, automated
electricity and heat metering systems, automated control systems.
Surveying Activities:
engineering survey for the construction of the 1st and 2nd criticality rating buildings and facilities
in accordance with GOST;
integrated surveying for designing 0.4 kV or higher-voltage HV lines and substations, auxiliary
facilities, external communications and engineering facilities.
Research and Engineering Activities:
research and development of strategy, forecast and siting of electric and thermal power facilities
adjusted for the main direction of technological progress;
provision of integrated engineering services to increase the operating level of generation,
electric grid equipment and dispatching.
Northwest Research and Engineering Center:
Company Overview
Major Completed Projects
Electricity and Heat Generation
•
Severo-Zapadnaya CHPP
•
Pravoberezhnaya CHPP of TGK-1
•
rehabilitation of power unit No. 6 of Kirishskaya TPP
Electric grids
•
rehabilitation of 750 kV Leningradskaya substation
•
Closed 220/110 kV Zabolotye substation
•
220kV HV line between Yuzhnoe Khylchuyu central gathering station and Varandey
booster pump station
Heat grids
•
Transit pipeline from Severo-Zapadnaya CHPP to Primorskaya boiler plant
Power supply models
•
Master plan of electricity supply to Saint Petersburg up to 2015 and the prospects
up to 2025
VNIPIenergoprom: Company Overview
Moscow
Key financial performance indicators of
VNIPIenergoprom in 2007, rubles in thousands
Revenue from the sale of goods, products, work, services
429,660
Cost of goods, products, work, services sold
308,339
Gross profit
121,321
Administrative expenses
104,817
Sales profit
16,504
Profit before tax
6,988
Net profit of the accounting period
6,367
VNIPIenergoprom (http://www.vnipiep.ru)
100% of shares are beneficially owned by
RAO UES of Russia
Headcount:
306 people,
including engineering staff of 221 people
Method and period of sale:
Public auction
May 21, 2008
Starting price of 75%-1 share -> 315 000 000 rubles
VNIPIenergoprom: Company Overview
Areas of Activity
design of CHPPs, boiler plants, heat networks
Development of heat supply models for cities/towns, districts and
industrial hubs
Development and implementation of the electronic models of
engineering communications
Development of power supply models
Development of regulatory documents
Scientific developments of laboratories
- production of protective diaphragm valves
- foam insulated pipes
- environmental and water treatment laboratory
VNIPIenergoprom: Company Overview
Major Completed Projects
•
•
•
•
•
•
•
for MOEK: “Moscow Heat Grid Facility Development Planning”
for MOEK: MOEK energy survey
for MOEK: analysis of development of Zelenograd RTS-1,2,3 heat grid zones
for NP INVEL: development of the standards of RAO UES of Russia belonging to the heat
supply system group
for Citilaif Ross: rehabilitation and expansion of Shakhtinskaya GTPP
for Moscow Heat Grid Company: investment program development
for Severo-Vostochny branch 3 of MOEK: working project for distributing heat networks with
polyurethane foam insulation
Unique Technologies
•
•
VNIPIenergoprom was one of the first companies to start using specialized software
environment for the development of urban heat supply models and today has vast experience
in the creation of electronic models of urban heat supply systems, which allow developing
options for the prospective development of heat supply systems and then monitoring them on
an ongoing basis.
Most recent projects include the development of an electronic model of Moscow heat supply