GLOBAL TRIGGER
Claudia-Elisabeth Wulz
Anton Taurok
Institute for High Energy Physics, Vienna
Trigger Internal Review
CERN, 6 Nov. 2001
URL’s and Publications
This talk may be found at:
http://wwwhephy.oeaw.ac.at/p3w/cms/trigger/globalTrigger/trans/wulz_IntRev_nov01.ppt
General information about the Global Trigger and the Global Muon Trigger is available at:
http://wwwhephy.oeaw.ac.at/p3w/cms/trigger/globalTrigger
http://wwwhephy.oeaw.ac.at/p3w/cms/trigger/globalMuonTrigger
The following papers have been published:
C.-E. Wulz: “Concept of the First Level Global Trigger for the CMS Experiment at LHC”,
Nucl. Instr. Meth. A473/3 (2001) 227-238
A. Taurok et al: “Implementation and Synchronization of the First Level Global Trigger for
the CMS Experiment at LHC”, Nucl. Instr. Meth. A473/3 (2001) 239-255
Claudia-Elisabeth Wulz
2
Internal Review, 6 Nov. 2001
Board Layout of the Global Trigger Processor
Backpl an e and
Re adou t l in k s
PS B
GTL
FDL
TC S
L1A
TIM
From
De te ctor
To
DAQ
From
To
Partiti on s EVM
PSB (Pipeline Synchronizing Buffer)
GTL (Global Trigger Logic)
FDL (Final Decision Logic)
TCS (Trigger Control System Module)
NEW: L1A (Level-1 Accept Module)
TIM (Timing Board)
GTFE (Global Trigger Frontend)
Claudia-Elisabeth Wulz
GTFE
To
TTC
From
TTC
Input synchronization (6 boards including GMT)
Logic calculation (1-2 boards)
L1A decision (1 board)
Trigger Control (1 board)
Delivery of L1A (1 board)
Timing (1 board)
Readout (1 board)
3
Internal Review, 6 Nov. 2001
Global Trigger 9U Crate
Claudia-Elisabeth Wulz
4
Internal Review, 6 Nov. 2001
New: GMT solution with 1 logic board
Claudia-Elisabeth Wulz
5
Internal Review, 6 Nov. 2001
Main Global Trigger Rack
2 opt. DAQ links
DAQ-PC
LINUX-PC
Monitoring
PC
Ethernet
2 S-links
JTAG
WinNT-PC
Private
PC
cooling
32 TTC_data (L1A,cmd)
32 Fast S ignal cables
3U PC
JTAG & Test PC
VME 6U
6U+3U fan_unit
cooling
3U cooling
VME 9U
GT crate
9U+ 3U fan_unit
cooling
3U cooling
6U crate
6U+3U fan_unit
cooling
3U cooling
4 Tracker Emulators
Private Monitoring &
Test boards
GMT, GT, TCS
Conversion boards
(Fast signals,...)
Global Trigger
Rack
*) 6 groups, 1group= 4 objects
on 3 Chann_links
+ 1 group free
Claudia-Elisabeth Wulz
Monitoring PC
3U cooling
PCI-VME link
36 ch_links MIP/QUIET bits
18 ch_links Calo trigger data *
16 DT,CS C,RPC muon cables
3U PC
3U PC
A.Taurok 22.10.2001
6
Internal Review, 6 Nov. 2001
Auxiliary Global Trigger Rack
In “official” version of rack layout (http://cmsdoc.cern.ch/~wsmith/USC55_racks.html)
two racks were foreseen for Global Trigger and Global Muon Trigger. The auxiliary
Global Trigger Rack replaces the GMT rack, since the GMT is now entirely housed in
the main Global Trigger rack. The proposed location of the main rack is E04 and of the
auxiliary rack is E03 on the lower floor of zone 6.
The auxiliary rack may house subsystem specific control modules, emulators and other
units still to be defined.
Claudia-Elisabeth Wulz
7
Internal Review, 6 Nov. 2001
Global Trigger Progress and Milestones
Milestone March 2002: System Test
This includes the backplane, the PSB-6U, GTL-6U, FDL-9U and TIM-9U. The
GTFE and the GMT are not included.
Backplane-6U: Prototype available
• 80 MHz GTL-plus signals, Channel Links
• 2mm connectors, 160 pin VME connectors
• Power Supplies: +5V, +3.3V, +2.5V, +1.8V
Claudia-Elisabeth Wulz
8
Internal Review, 6 Nov. 2001
PSB-6U
PSB-6U: available. Channel Link receivers used. 1 Sync Chip for 2 channels.
• Monitoring of all Input bits for every BX
• Synchronisation checks for every BX
Claudia-Elisabeth Wulz
9
Internal Review, 6 Nov. 2001
PSB-9U
Memories inside FPGA for Readout:
3-5 bx read by a L1A
Claudia-Elisabeth Wulz
10
Internal Review, 6 Nov. 2001
GTL-6U
• GTL-6U
Automatic chip design and setup procedure developed. Layout for a 20 channel
GTL (4 , 4 isol. e/, 4 central jets, 4 fwd jets, SET, ETmiss, 8 jet multiplicities; other
quadruplets can be connected alternatively for tests) is currently being finished.
1020-pin Altera FPGA 20k400E included for evaluation.
The layout of a conversion board to be used later in final 9U-crate is ready. It
contains also memories in FPGA’s to send simulated test data to the GTL-6U
board.
Redefinition of jet input groups necessary for GTL-9U.
Claudia-Elisabeth Wulz
11
Internal Review, 6 Nov. 2001
GTL-9U
Redefinition of
jet input groups
necessary
Claudia-Elisabeth Wulz
12
Internal Review, 6 Nov. 2001
FDL-9U
Design with 8 final OR’s in progress. Some delay to be expected.
Monitoring of all
algorithm and L1A bits
Prescaling of all
algorithms
Trigger Mask
8 L1A’s in parallel for
partition modes
Claudia-Elisabeth Wulz
13
Internal Review, 6 Nov. 2001
TIM-9U
The schematic design is in progress. The board contains a TTCrx chip and provides all timing
signals for the GT crate. It will be used also in the Drift Tube Track Finder crates.
An
FPGA
provides
all
necessary
test
functions to run
the crate without
the central TTC
clock. It simulates
also L1A requests
for monitoring or
to test the readout
chain.
Claudia-Elisabeth Wulz
14
Internal Review, 6 Nov. 2001
Global Trigger Progress and Milestones
Milestone July 2002: TCS-9U ready
• TCS-9U: The main functions are defined but the design is still open for
additional requests (calibration logic etc.)
Trigger Partitions: The maximum number of subsystems is fixed (32).
A preliminary agreement about the output to the DAQ Event Manager is has
been reached.
The input format of Fast Signals should be fixed soon. 5 coded bits per
subsystem, sent as LVDS parallel data, are proposed. DSUB15 connectors are
proposed.
The TCS board provides data for the standard TTCvi as well as for a ”CMSTTCvi”, but different interface boards are required. L1A driver module to be
used with CMS-TTCvi has been conceived.
Claudia-Elisabeth Wulz
15
Internal Review, 6 Nov. 2001
TCS-9U environment
Claudia-Elisabeth Wulz
16
Internal Review, 6 Nov. 2001
L1A Driver Board
Claudia-Elisabeth Wulz
17
Internal Review, 6 Nov. 2001
Global Trigger Progress and Milestones
Milestone October 2002: 9U backplane ready
The design with the GTLp 80 MHz and Channel Links is in progress.
Milestone June 2003: Complete GT prototype available
Integration tests possible from this date.
•GTFE-9U: Conceptual design of readout board done.
Milestone July 2004: 12-channel PSB-9U available
• PSB-9U: Conceptual design done. Will have memories inside FPGA’s.
Milestone Nov. 2004: Complete GT available
Includes GTL-9U module with all 32 input channels (4 , 4 isol. e/, 4 non-isol. e/ ,
12 jet channels, SET, ETmiss, 8 jet multiplicities). The Global Muon Trigger will have been
completed by Nov. 2003.
Claudia-Elisabeth Wulz
18
Internal Review, 6 Nov. 2001
Input / Output of Trigger Objects
• Muons from RPC, DT, CSC regional triggers to Global Muon Trigger
–The muons are transferred as 40 MHz parallel LVDS signals using 68-pin SCSI-3 connectors and
screened round twisted pair cables (type to be defined). Cable lengths less than 10 m.
• Calorimeter trigger objects from the Global Calorimeter Trigger to GT-PSB boards and
• MIP/ISO bits from the Global Calorimeter Trigger to the Global Muon Trigger
– The trigger objects are transferred by 28-bit Channel Links. Redefinition of jet groups is necessary.
Data rate is 40 MHz. To minimize latency the links run at 80 MHz and send each word twice. A skew
clear cable will be used, the connectors are not yet defined. Cable lengths less than 5 m.
• Muon trigger objects from the Global Muon Trigger to the Global Trigger
– The muons are transferred in parallel on the backplane.
Claudia-Elisabeth Wulz
19
Internal Review, 6 Nov. 2001
Input / Output of L1A and Control Signals
The Global Trigger exchanges signals with the subsystem partitions, the TTC and DAQ
systems.
• FAST SIGNALS from 32 subsystem partitions
– 5 parallel LVDS signals carry coded status and/or command words
– Cables and connectors to be defined
• L1A and Commands (B-Go) to 32 TTCvi
– 32 cables. Details will depend on chosen TTCvi option.
• 2 serial links to DAQ PC
– 1 S-link to DAQ readout, 1S-link to Event Manager (standard defined by DAQ)
• TTC
– 1 optical link
Claudia-Elisabeth Wulz
20
Internal Review, 6 Nov. 2001
Latency, Installation and Commissioning
The latency for the Global Trigger is still 8 bx.
Internal checks within the system can all be done on the surface, even in the laboratory.
Checks needing input from subsystems can also be done on the surface, but timing should
be as close to the real one as possible (programmable delays on input, …).
Final synchronzation needs to be done in the underground area.
Time needed for commissioning will depend also a lot on other subsystems!
Claudia-Elisabeth Wulz
21
Internal Review, 6 Nov. 2001
Status and plans of software
Use cases have been collected for the Global Trigger and Global Muon Trigger
(and the Drift Tube Track Finder).
A draft internal note “On-line Software Requirements for the GT, the GMT and
the DTTF” can be found at:
http://wwwhephy.oeaw.ac.at/p3w/cms/trigger/globalTrigger/notes/SWreq.doc
Transparencies have been shown in Sept. 2001 and can be found at:
http://wwwhephy.oeaw.ac.at/p3w/cms/trigger/globalTrigger/trans/
wulz_swreq_sep01.ppt
We plan to start to develop needed software next year, in collaboration with the
CMS-wide effort.
Claudia-Elisabeth Wulz
22
Internal Review, 6 Nov. 2001
GT and GMT Manpower
System Engineer:
A. Taurok
CERN Doctoral Student:
H. Sakulin (Logic and hardware design of GMT, simulation studies)
Technicians: (shared with DTTF and other activities)
H. Bergauer, M. Padrta, K. Kastner (in Vienna)
Ch. Deldicque (at CERN)
Physicists:
M. Fierro, A. Jeitler, C.-E. Wulz (mainly working on GT/GMT)
N. Neumeister, P. Porth, H. Rohringer, L. Rurua (partly working on other
activities)
L. Boldizsar (GT simulation, about 4 months per year in 2001 and 2002)
Claudia-Elisabeth Wulz
23
Internal Review, 6 Nov. 2001
Conclusions
Progress in hardware design essentially as planned
Layout of GTL-6U almost ready, conversion board for 9U ready
Timing module designed
L1A Driver Board designed
Other modules also on track (except maybe FDL)
Design of TCS system updated
Crate and rack layout updated
Software concept (in coordination with DTTF and GMT and
CMS-wide solutions) starting to be developed
Claudia-Elisabeth Wulz
24
Internal Review, 6 Nov. 2001