Romania-Bulgaria Cross-Border Cooperation Operational Programme 2007-2013
Technical Meeting&Joint Approval Committee, Bucharest, 2-3 April 2007
Multi-annual Evaluation Plan
Role of the Multi-annual Evaluation Plan
Sets out an evaluation strategy for the Romania – Bulgaria OP
implementation period
 Represents a management tool for the implementation of the
programme
 Its nature is indicative
 The Multi-Annual Evaluation Plan is a forward-looking document,
identifying in advance evaluations that we intend to carry out in the future
years.
 The effective management of the evaluation process will be organized
around a more specific and detailed Annual Evaluation Plan
 both of them will have to be approved by the Monitoring Committee
Flow of Annual Evaluation Plan activities
1. Eval. Unit
prepares
draft Annual
Evaluation
Plan (endFebruary)
5. Progress
Report
(Autumn MC
meeting)
2.
Consultation
on draft Plan
4. MC
approves
Plan
3.
Submission
of Plan to
Spring
Monitoring
Committee
meeting
Evaluation Steering Committee
Role
• to convene for each evaluation exercise
• to oversee the implementation of the Evaluation Plans
Core membership
• The Head of the OP Managing Authority (or his or her
designate);
• The OP Managing Authority Evaluation Unit;
• A representative from DG Regio
• A representative of the MACSF Evaluation Central Unit;
• A representative of the National Authority from Bulgaria
Indicative Evaluation Activities
Interim evaluations
• The OP will be subject to two interim evaluations:
• one in late 2008 –2009 – which will focus primarily
on the roll-out of the OP to end 2008, examining
issues surrounding the system functioning
• and one in 2012 - examining the implementation of
the OP, of a broader nature, against the traditional
evaluation criteria of effectiveness, efficiency,
relevance, impact and sustainability
 These evaluations will be commissioned to external
experts
Indicative Evaluation Activities
Ad hoc evaluations
• Individual Priority Axis or Key Areas of interventions
shall be subjected to ad-hoc evaluation
• Ad hoc evaluations will be triggered in case a priority
axis or key area of intervention is over 20 % below target
• Cannot be anticipated at this stage
• They will either be carried out by external experts or the
MA Evaluation Unit.