STRATEGIC ACTIONS PLAN

Download Report

Transcript STRATEGIC ACTIONS PLAN

Distributed Generation
Renewable Energy
STRATEGIC
With the JouleBox™
ACTIONS
PLAN
Hybrid Generators
Confidential Proprietary Material Presented by IIG-ECO-GEN Energy, Inc. © 2014 All Rights
Reserved
Green
Is Good
Concepts
for
the Future
Affordable
Available
and for the
24/7/365
Present
Reliable
© IIG-ECO-GEN Energy, Inc. 3-1-2014
STRATEGIC
Renewable Energy is Needed Now!
ACTIONS PLAN
IIG-ECO-GEN Energy, Inc. and our financial partners
are prepared to enter into Long Term 20 year PPA’s to
provide 100% clean, green energy.
We will provide ‘Firm Power’ 24/7/365 using a hybrid
system of solar, wind and lithium ion batteries.
Concepts
for the Future
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
Traditional Energy
STRATEGIC
ACTIONS PLAN
Expensive, Pollution, Not Sustainable
Fossil Fuels
Coal, Natural Gas,
All fossil fuels have
fuel costs and
Carbon footprint that
is not
sustainable.
Concepts
Nuclear Power Plants
San Onofre – Shut down
Fukushima – problems
Environmental damage
for the Future
Renewables
produce 4-8 Hours per day
solar, wind, hydro
expensive
transmission costs
and for the
Now there is a Better Way
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
STRATEGIC
ACTIONS PLAN
Traditional Renewable Energy
Intermittent Power 4-12 Hours per day – AT BEST
Solar panels
Not enough room
where the power
is needed.
4-6 Hours per day
Concepts
Concentrated Solar
Large land footprint
Environmental damage
High Transmission costs
for the Future
Wind
8 Hours per day
Environmental damage
High Transmission costs
and for the
Now there is a Better Way
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
The JouleBox™
STRATEGIC
ACTIONS PLAN
Produces Clean, Green Energy 24/7/365 using solar, wind and lithium ion batteries.
5 Proven Technologies have been combined in one box to generate electricity.
JouleBox™
Hybrid
Generator
60 kW
Annual kWh produced
525,600
Annual kWh’s are estimated as unit size (60
kW) X 24 hours per day X 365 days in year.
Actual production may vary slightly (+ 5%).
Concepts
for the Future
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
STRATEGIC
ACTIONS PLAN
The JouleBox™
Hybrid Generator
Understanding The Technology
5 Proven Technologies have been combined to generate electricity.
1.
2.
3.
4.
5.

Solar Panels and DC Generators to constantly charge the batteries.
Lithium Ion Battery Brick with patented Serial and Parallel wiring to Charge and Discharge. By
not using the 15,000 charge/discharge life cycles, the batteries will last 20 years plus.
Vortex Reduction Chamber (VRC). High Pressure Manufactured Wind is sent through a VRC to
increase Force with reduced energy to turn the Power Turbine. The Power Turbine turns an AC
Generator.
High Efficiency Speed Control DC Motors and DC Blower Motors and controllers for greater
durability and reliability. We use electronic controllers to maximize efficiency. Our motors use
1/3rd the energy of conventional motors.
Power Q – controls the power quality output to sync with the grid and maintain proper
harmonics. Clean sine waves, stable Hz and harmonics, no power surges.
We have protected the Intellectual Property (IP) with layers of use patents, copyrights and other IP. The software is burned into the chips which eliminates the risk of
reverse engineering. All units are GPS equipped with licensing agreements for installation at a specified location. Location modification is allowed under the licensing
agreement with notification.
Concepts
for the Future
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
Distributed Generation
STRATEGIC
ACTIONS PLAN
IIG-ECO-GEN and our financial partners are prepared to invest and build
Micro Grid Distributed Generation Power Facilities
 Next to the PCC, next to sub-stations, …
 Where the energy is needed!
 Clusters of 60 kW units – from 3 MW to 50 MW plants or
more
Scalable in size
Dependable “Firm Power”
Why pay high transmission costs?
Why suffer losses in transmission?
Concepts
We will lease/buy “Right-of-Way” land
transmission lines next
to the
for under
the Future
and
for
sub-station where power is needed.
the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
STRATEGIC
ACTIONS PLAN
Installations
New
facility
By Installing next to the Substations you avoid Transmission Costs. We work
with the Grid to stabilize existing energy generation or we can work off-Grid.
Concepts
for the Future
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
STRATEGIC
ACTIONS PLAN
Installations Next to Substations
New
JouleBox
facility
2.88 MW
New
JouleBox
facility
6.48 MW
New
JouleBox
facility
10.8 MW
New
JouleBox
facility
50.4 MW
New
JouleBox
facility
4.32 MW
New
JouleBox
facility
7.2 MW
By determining
the
Substation we can
multiple installations
in
Concepts the capacity
forof
the
Future
and build
for the
Present
varying sizes. This strengthens the overall Grid. The above shows 82.08 MW total.
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
Installations
STRATEGIC
ACTIONS PLAN
3 MW Project
Feet
17
10.00
10.00
10.00
10.00
10.00
10.00
10.00
4
30.00
1
7
'
15 -16
19-20
Switchgear 12
JouleBoxes
Top/Bottom
21-22
Unit
13/14
10' X 7.5'
23-24
25-26
Bus to Switchgear
Toilet
Front Main Access Door
20' Access for Installation and Safety Code
27-28
29-30
31-32
33-34
35-36
37-38
39-40
43-44
45-46
Switchgear 12
JouleBoxes
Top/Bottom
47-48
Storage Room 9' X 21'
41-42
49-50
20' Access for Installation and Safety Code
IT Room
10' X 17'
Installations are Modular:
 Building, Racking, Sound & Solar Module
 Electrical Intertie & Protection Module
 Communications, IT & Security Module
Office & Security
19' X 21'
4' Maintenance and Catwalk (Bus is run under Catwalk)
Break Room
A
c
c
e
s
s
17-18
Unit
11/12
10' X 7.5'
Air-lock
1 Over
Head
Access
Door &
Emergency
Exit
Unit 3/4
Unit 5/6
Unit 7/8
Units 9/10
10' X 7.5'
10' X 7.5'
10' X 7.5'
10' X 7.5'
4' Maintenance and Catwalk (Bus is run under Catwalk)
Shop
23.5' X 24'
12' Door
Unit 1/2
10' X 7.5'
Electrical Room
20' Access for Installation and Safety Code
Satellite Pad 4'X4'
Mega Watts
3
Total Land for
Security
Units
50
21,276
Building S.F.
8,636
60 x 120
Height 22'
Solar Panels
200
51,000
Watts
Shop
23.5' X 32'
12' Door
Storage
11.5' x 32'
12' Door
Office
19'X 25'
IT 8'X30'
Racking
25
10,000lb.
Capacity
Posts
100
Cat Walk
2
78'
Height 8'"
Note: Stair ways on each end next
All sides must have emergency
man doors
NOTE: Air-lock front door
All JouleBox ® Units are installed inside
a safe and secure pre-fab building.
Can be sized from 2.88 MW building to multiple buildings with 50.4 MW EACH.
Install next to Sub-station where energy is needed (must be in groups of
12 JouleBoxes®).
Concepts
for the Future
24/7/365 Satellite communications
monitoring.
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
17
10.00
10.00
10.00
10.00
10.00
17-18
27-28
29-30
19-20
Switchgear 12
JouleBoxes
Top/Bottom
21-22
20' Access for Installation and Safety Code
31-32
33-34
35-36
45-46
Switchgear 12
JouleBoxes
Top/Bottom
47-48
20' Access for Installation and Safety Code
25-26
37-38
39-40
Bus to Switchgear
Toilet
Front Main Access Door
Storage Room 9' X 21'
43-44
23-24
49-50
IT Room
10' X 17'
Office & Security
19' X 21'
4' Maintenance and Catwalk (Bus is run under Catwalk)
41-42
Unit
13/14
10' X 7.5'
30.00
Break Room
A
c
c
e
s
s
15 -16
Unit
11/12
10' X 7.5'
4
Air-lock
1 Over
Head
Access
Door &
Emergency
Exit
1
7
'
Unit 3/4
Unit 5/6
Unit 7/8
Units 9/10
10' X 7.5'
10' X 7.5'
10' X 7.5'
10' X 7.5'
4' Maintenance and Catwalk (Bus is run under Catwalk)
10.00
Shop
23.5' X 24'
12' Door
Unit 1/2
10' X 7.5'
10.00
Electrical Room
20' Access for Installation and Safety Code
Building, Racking,
Sound & Solar
Module
STRATEGIC
ACTIONS PLAN
3 MW Project
Feet
Satellite Pad 4'X4'
Mega Watts
3
Total Land for
Security
Units
50
21,276
Building S.F.
8,636
60 x 120
Height 22'
Solar Panels
200
51,000
Watts
Shop
23.5' X 32'
12' Door
Storage
11.5' x 32'
12' Door
Office
19'X 25'
IT 8'X30'
Racking
25
10,000lb.
Capacity
Posts
100
Cat Walk
2
78'
Height 8'"
Note: Stair ways on each end next
All sides must have emergency
man doors
NOTE: Air-lock front door
Can be
sized from 2.88 MW buildingfor
to multiple
buildings with 50.4 MW
EACH.
Concepts
the Future
and
for
Install next to Sub-station where energy is needed (must be in groups of
12 JouleBoxes®).
the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
Electrical Intertie & Grid
Protection Module
STRATEGIC
ACTIONS PLAN
Designed by a Senior Member, IEEE
To LV/MV Step-Up Transformer
•
•
LV Switchboard (UL891)
Collector Bus and Master Breaker
3Y
DG Interconnection Relay
•
4 X 12 Generators;
2,880kW; 480V
3Y
1
To Other LVSB with 12 Generators
IEEE Power Systems Relaying Committee (PSRC), Main Committee
IEEE PSRC Rotating Machinery Protection Subcommittee, Chair
Emeritus
IEEE PSRC Rotating Machinery Protection Subcommittee, Committee
Member
12 Units are Combined
To Other LVSBs with 12 Generators
12 Generators; 720kW; 480V
LV Switchboard (UL891)
Collector Bus and Master Breaker
3Y
DG Interconnection Relay
Aggregated
Generator
Master
Breaker
3Y
1
G
G
G
G
G
G
G
G
G
G
G
G
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
60kW
480V
Power Q (Power Quality Box) regulates sine waves,
harmonics, voltage spikes
ABB Switchgear
Concepts
Woodward EasYgen
for the Future
and for the
Present
Beckwith Intertie Protection
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
Power Plant Communications,
IT & Security Module
Site-wide Video Surveillance
Network
Provided By
Uplink to
Control Center
IT & Satellite Hub
Generator Control & Monitoring of all units
and component parts 24/7
Facility Access
Control
Cinetcomm’s
global
networks provide all
back office support,
systems
monitoring
and control via satellite
communications
for
IIG-ECO-GEN
Energy’s operations.
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
STRATEGIC
ACTIONS PLAN
PPA
Power Purchase Agreements
Advantages

No Capital Cost to install or maintain equipment. 100% turn key operation.

Firm Power, 24/7/365

Satellite Monitoring for safety and guaranteed production at no additional cost..

Maintenance Free – All PPAs include maintenance and repairs.

High Quality Power, Clean electricity, stable Hz, synced sine waves, and harmonics, no power surges.

No pollution – Clean, Green Electricity!

No Fuel Costs. Lower per kWh costs than all other forms of energy generation .

Fixed 20 yr. rate per kWh of electricity produced. No escalator for inflation.

Rates from US$0.09 - $0.32 per kWh depending on credit, sovereign guarantee and escalator clauses. Also Switchgear and transformer
requirements

Scalable. 3 MW to multiple 50 MW Buildings. Energy is produced next to sub-stations - where the energy is needed!

All PPAs are owned by a local Special Purpose Entity (SPE). IIG-ECO-GEN retains a 25% interest in all SPEs to compensate for IP.
 Reliable Energy Produces Jobs Faster Than Anything Else. Factories Can Operate 24/7
Concepts
The Power Q in the JouleBox™ controls
harmonics, sine waves, Hz, voltage, power
surges and auto cut-off for safety. Units
can be satellite monitored remotely.
for the Future
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
Good For Country
STRATEGIC
 Local Construction Jobs
ACTIONS
PLAN
 Local Sourcing of Building Material
 The Owner of the Facility is a local SPE
 Jobs in the Facility 24/7/365




Management
Engineers
Maintenance
Security
Secure, Reliable, Green ENERGY
Concepts
the FutureMore Anything
and for the
CREATESforJOBS
Else!Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
PPA
STRATEGIC
Power Purchase Agreements
ACTIONS PLAN
IIG-ECO-GEN Energy, Inc. and our financial partners are
prepared to enter into Long Term 20 Year PPA’s to provide
100% clean, green energy.
We will provide ‘Firm Power’ 24/7/365 using a hybrid system of
solar, wind and lithium ion batteries.
Concepts
for the Future
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved
STRATEGIC
ACTIONS PLAN
Contact
IIG-ECO-GEN
Concepts
Green
Energy
72,000 CFM
for the Future
and for the
Present
© IIG-ECO-GEN Energy, Inc. 3-1-2012 under
permission of the Bellagio Trust. All Rights Reserved