Project Overview

Download Report

Transcript Project Overview

JTLS Direct Link To MUSE
Ellen F Roland
JTLS Development Team Leader
JTLS Program Vision
• Use the Joint Theater Level Simulation to
meet Joint, Coalition and Service training
requirements while maintaining our M&S
support and partnership with U.S. Allies,
NATO, PfP countries and Federal
Agencies to maximize our users’ return
on investment through a flexible,
scalable and deployable simulation.
November 2012
ROLANDS & ASSOCIATES Corporation
2
First Direct Link to MUSE
CEP
JODA
Aggregate Unit Data
MUSE
Bridge
Entity Level Data From
Templates (DIS)
November 2012
Detailed Naval Damage
One Way Communications
Different Templates
• MUSE
• Intel (ACE/IOS)
ROLANDS & ASSOCIATES Corporation
3
HLA Link To MUSE
CEP
JODA
• JMRM FOM Too Different
• JLVC Connectionless
• NTF Connected / VBS2
ELS
EODA
JHIP
HLA RTI
MUSE
Bridge
November 2012
ROLANDS & ASSOCIATES Corporation
4
Decision To Go Direct
• SOA Manifesto
– Business Value Over Technical Strategy
• Government Tied To Strongly To HLA Solution
• MUSE Team and R&A Team Felt Direct Most Cost
Beneficial
– Strategic Goals Over Project-Specific Benefits
• What Are They – Cost Effective Environment
– Intrinsic interoperability over custom integration
• Direct Connect Contrary To This Rule
November 2012
ROLANDS & ASSOCIATES Corporation
5
Decision To Go Direct
• SOA Manifesto
– Shared Services Not Specific Purpose Software
• We Viewed MUSE As The Service
• Not How We Linked To The Service
– Flexibility Over Optimization
• Direct Connect Much More Flexible
– Evolutionary Refinement Not Initial Perfection
• JTLS Has Always Followed Rule
• The Method Of Integration Has No Impact
November 2012
ROLANDS & ASSOCIATES Corporation
6
Current Plan
CEP
JODA
MUSE
ELS
EODA
WES / Netlink
JTLS
Interface
Module
Detailed Naval Damage
Consistent Entity Data
Two Way Communication
Change DIS Codes
Need To Support 64-bit Windows DLL
November 2012
ROLANDS & ASSOCIATES Corporation
7
Detailed Naval Damage
• Riding Low
• Fire Size
– Forward, Aft, Full
• List Direction
– Small, Medium, Large
• Oil Slick
– Port, Starboard
• List Position
– With Debris, No Debris
• Oil Slick Location
– Forward, Aft, Middle
– Around, Trailing
• Fire Type
– Smoke, Fire, Both
November 2012
ROLANDS & ASSOCIATES Corporation
8
Consistent Entity Data
• JTLS Entity Level Simulation (ELS)
– Uses Templates
•
•
•
•
Admin Move
Defend
Attack Mounted
Attack Dismounted
– Entity Priority Positions
• When 1 Gets Killed, Lower Priority Entity Moves In
November 2012
ROLANDS & ASSOCIATES Corporation
9
Consistent Entity Data
• Large Number Of Entities
– We Do Not Publish Each Location
– Command Objects
• Has Location
• Each Entity Belong to Command Object
– Has Offset From Command Object
– Movement
• If Command Object Moves - All Sub-Entities Move
• If Entity Offset Moves – Only It Moves
November 2012
ROLANDS & ASSOCIATES Corporation
10
Two Way Communication
JTLS
MUSE Bridge
Entity Type And Location Info
Updates
Intel
Assesses
Damage
UAV Location – Reflected In JTLS
Fires On Specific Entity
Updates Damage Of Specific Entity
November 2012
ROLANDS & ASSOCIATES Corporation
11
Change DIS Codes
• JTLS As An Operational Level Game
– Significant Difference In What Is Important
• Tactical Level Model
– Activity In Terrorist Camp
» Man Smoking a Pipe
» Individual Cars Coming And Going
• Operational Level Model
– SSM Sites Preparing To Launch
– SAM Sites With Non-Full Load
November 2012
ROLANDS & ASSOCIATES Corporation
12
Change DIS Code
• Proposed Two Methods
– Within JLVC
• Use FOM Characteristics
• Long Lead Time – Because All Must Agree
– Change DIS Code
• Could Not Do Within JLVC
• One Of The Primary Reasons Move To Direct Link
November 2012
ROLANDS & ASSOCIATES Corporation
13
Change DIS Code
SA-6
1.1.222.28.6.0
Meaning 0 Missiles Fired
November 2012
SA-6
1.1.222.28.6.1
Meaning 1 Missile Fired
ROLANDS & ASSOCIATES Corporation
14
Current Status
• 64-Bit DLL JODA Libraries
– Developed - In Testing
– Means JTLS Does Need To Maintain
• First Integration Test – October 2012
• Second Integration Test – November 2012
• Demonstration
– JTLS International Users Conference
– 11 and 12 December
November 2012
ROLANDS & ASSOCIATES Corporation
15
Future Capabilities
• JTLS Feed Unrealistic
– Road Network
• Automatic Vignette Generation
– When Convoy Loading / Offloading
– Have People Acomplishing the Task
November 2012
ROLANDS & ASSOCIATES Corporation
16
Questions
November 2012
ROLANDS & ASSOCIATES Corporation
17