1998 303(d) and 305(b) WATER QUALITY REPORTS

Download Report

Transcript 1998 303(d) and 305(b) WATER QUALITY REPORTS

VIRGINIA’S TMDL
PROCESS
Four Mile Run Bacteria TMDL
March 25, 2002
Alexandria, VA
What is a TMDL ?
• TMDL = “Total Maximum Daily Load”
• TMDL = pollution budget
» TMDL = Sum (WLA)+ Sum (LA)+ MOS
• Required elements:
–
–
–
–
meets water quality standard;
considers all sources incl. background
contains TMDL, WLA, LA and MOS
addresses seasonality, critical condition, and
reasonable assurance
How is a TMDL developed?
• Identify all sources of a given pollutant
• Calculate the amount of pollutant
entering the stream from each source
• Calculate - by source - the pollutant
reductions needed to attain water
quality standards
• For each source, allocate the
allowable loading and
include Margin of Safety
Water Quality Standards
• Listing of impaired waters and TMDL
development are based on WQ standards.
• Standards are regulations based on federal
and state law that set:
– numeric and narrative limits on pollutants.
• Purpose of standards:
– protection of 5 designated uses: aquatic life,
fishing, shellfish, swimming, & drinking water
– restoration of state waters - TMDLs
Current Fecal Coliform Standard
• Geometric mean of 200 counts per 100 ml.
• Instantaneous of 1000 counts per 100 ml.
• Revisions:
– Change in criteria from fecal coliform to E. coli
and enterococci by May 2002
– Considering re-designating some waters for
secondary contact, i.e. non-swimming use;
adoption by Fall 2002 if approved
– www.deq.state.va.us/wqs
Water Quality Monitoring and
Assessment Process
• Monitor and assess water quality - 305(b) Report
www.deq.state.va.us/water/wqmap.html
• Place impaired waters on 303(d) List
• Develop TMDL for impaired waters
• Implement TMDL
• Remove waters from 303(d) List when TMDL is
developed but track on 305(b) Report as having TMDL
TMDL Development Process
•
•
•
•
Public meeting for TMDL development
Public meeting for Draft TMDL
Submit to EPA for
approval
SWCB adoption of
TMDL as regulation
• Include TMDL in
basin-wide WQMPs
TMDL Implementation
• Implementation plans not required under
CWA or by EPA’s current regulations.
• DEQ is required by state legislation to
develop implementation plan
• DEQ and DCR are developing framework
for NPS TMDL implementation plans
TMDL Implementation
• DEQ, DCR, VDH, other state agencies and
local stakeholders will coordinate on plan
development.
• TMDL implementation plans have been
completed for 13 impaired water segments
where TMDLs had been approved.
• Opportunity knocks!
Staged Implementation
• TMDLs include staged reduction targets
– allows most cost-effective measures to be
implemented first
– allows iterative evaluation of TMDL adequacy
in achieving water quality standard
– may ultimately require change
in WQS, e.g. different criterion
based on use
Four Mile Run TMDL
Implementation
• Local process
– TMDL Implementation Plan
• 1997 WQMIRA
• type, cost of measure
• implementation period, funding
– Ongoing local activities
• county and city environmental
programs
Four Mile Run TMDL
Implementation
• Examples for implementation strategies:
– Identify and repair leaking sewer lines
– Prepare and distribute educational materials on
proper handling of pet waste
– Develop, implement and enforce local
ordinances addressing pet waste
Future of TMDL Program
• Court Order requires forward movement and
completion of TMDLs
• Resource needs at all levels
• Expect changes
– WQS revisions
– ongoing EPA/state cooperation
Public Comment Information
• Comment period ends
– April 9, 2002
• Send comments to
Kate Bennett, VA DEQ
13901 Crown Ct
Woodbridge, VA 22801
phone (703) 583-3896, Fax (703) 583-3841
e-mail [email protected].
VIRGINIA’S TMDL
PROCESS
Four Mile Run Bacteria TMDL
March 25, 2002
Alexandria, VA