Transcript Slide 1
Ministry of Road and urbanism Mashhad Golbahar Suburban Railway Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Mashhad Urban Railway networks Line 3 Line 1 Line 4 Line 1: 24 km length /22 station Line 2: 15 km length /13station Line 3: 25 km length /22 station Line 4: 14 km length /14station Line 5: 46 km (Mono rail) Total: 124 km line 117 Stations Line 2 Ministry of Road and urbanism Golbahar Commuter Railway Urban Rail Transit Mono Rail Tramway LRV Light Metro Heavy Metro SOURCES: TCQSM speed and capacity estimation procedures, TCRP Report 13 (R5), Studying of operation plan and metro system of Golbahar Ministry of Road and urbanism Introduction New town of Golbahar Suburban city of Mashhad the distance app. 45 km In accordance with plan of Golbahar, population will grow up to 400000 persons The area of town is 4000 hectares Attraction of Golbahar Tanning airport, tourist air port Azad university Artificial lake Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Connection way between Mashhad and Golbahar 1. 2. Mashhad-Ghuchan free way Old way of Mashhad-Ghuchan 3. Historical way of Mashhad-Ghuchan Project Management: Tadbir Omran Iranian Map Golbahar Mashhad Golbahar گلمکان Samen Stadium شانديز Mashhad Golbahar Mashhad-Ghochan Exp. Mashhad جاده شانديز Golmakan Shandiz Torghabeh Phase 4 Phase 1 Phase 2 Phase 3 Ministry of Road and urbanism Metro System 11 Line No.1 Mashhad Metro Urban lines connecting 40 km Length of Rail Way 4 Number Of Station 1435 mm Track Gauge 140 km/h Design speed 2 loco- 10 wagon Fleet )T:Trailer- L:Locomotive(Loco-10T-Loco Arrangement Of Fleet 25kv (OCS) Power Supply System 2500 Person Train Capacity 298 m Length of Train Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Traffic Info 12 1415 Design Future Year 530.000 person The maximum estimated population 210.000 passenger/day The estimated railway travel 27952passenger at rush hour PPHPD 2500 passenger The train capacity 8 min Headway Project Management: Tadbir Omran Iranian Station Info Ministry of Road and urbanism +3.50( Ground Level to Platform level) Lateral Ticket Hall 4 leveles (main hall+platform+under platform+under pass) 300 m Station Length ≈35m Platform Width 2 Entrance Quantity Double Island/insular Platform Type Project Management: Tadbir Omran Iranian Station Level Station Type Floor Quantity Ministry of Road and urbanism Station Info Golbahar New Town (Near mashhad city ) Station Location 4 Line Quantity New Town Development Organization Co. Ownership Average Size=(5m×3m) Room Dimension 6m×4m Local Control Room Dimension Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Station Info 13m×6m [signaling &Communication] Room Dimension Natural Ventilation & Air Washer HVAC#4 Type No/Hadn`t DWP(Dimension , Quantity , Pump Type) 9m×6m Fire Fighting Source Dimension Galvanized Iron & Cast- Iron & PE [Sewage ]Pipe Material Copper HVAC Pipe Material Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Station Info Pex-Al-Pex & Galvanized Iron Water Pipe Material Galvanized Iron & Isolated Galvanized Iron HVAC Duct Material 2 (13m×5.5m) 2(4m×3.5m) Project Management: Tadbir Omran Iranian Dimension & Quantity of LPS Dimension & Quantity of Sale Ticket Room Ministry of Road and urbanism Application Area In Station 80m² Commercial 480m² Administrative 220m² Cultural - Religious 1800m² [Main Hall] 50m² Fire Fighting (35m×300m)=10500m² Internal Transportation Terminal Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Application Area In Station ≈17000m² Green Area ≈(35m×300m)+ ( 43m×85m)=14155m² Station Building ≈(320m×150m)=48000m² Station Environment Total Area(with Local Road) ≈17000m² Open Parking Area According to Golbahar new town Detail Design Network & Road City 48000m²-50000m² Total Area Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Pavement Info 19 UIC60 Type Of Rail 22 Ton Axial load Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Train Info 20 Info Title L-10*T-L Fleet 25 kv AC OCS Type Of Power Supply AC Or DC Motor With Series Actuator & 800KW Power Consumption Package- Supply Fresh Air Main Motor Electrical Heater Heating Central Control – Announcing Without Amplified Voice Internal Telephone Voice Alarm System Project Management: Tadbir Omran Iranian Ventilation Safety Alarm System Ministry of Road and urbanism Depot Info 10 Hec. Depot Area 400 m^2 Signaling , Control , Telecommunication Building 1000 m^2 Store Building 200 m^2 10000 m^2 Fire Fighting Water Source Parking , Daily Inspection light maintenance Salon Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Depot Info 6000 m^2 200 m^2 Administrative , cultural , Sport Building Heavy Machinery Parking 150 m^2 Personnel Room 70 m^2 Rolling Stock & Line Room 700 ml Length of Railway Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Depot Info 1000 m Length of Access Road 30 Switch Point Quantity 500000 m^3 Total Excavation 100000 m^3 Total Embankment Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Signaling Info (Line Electrical) OCS , 25 KV , Autotransformer Substation Power Supply 2 Post (1 SP & 2 ATP) Substation Quantity Open Yard Substation Type Substation is feeding Mashhad line 1 Feeding Point Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Signaling Info (Station Electrical) City Network Power Supply 2 LPS Substation Quantity In mid of platform Substation Location 1 Feeder Standby Feeder Quantity 20 kv Feeder Voltage Diesel Generator Emergency Power Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Signaling Info (Station Electrical) Split Unit Centrifuge Automatic Gas Water Ventilation (Technical Rooms) Ventilation (Other Space) Fire Fighting(Equipment Room) Fire Fighting(Other Space) Track circuit , axel counter Project Management: Tadbir Omran Iranian Train Detection Ministry of Road and urbanism Signaling Info Point Machine , Signal Wayside Equipment Automatic Train Protection , Display Panel , internal control Rolling Stock Switches , Fibber optic , … Transmission System LCD Located in Station Public & Emergency System Announcing by loudspeaker Public Alarm Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Signaling Info RTU , I/O Rock Scada System Control & Monitor E/M BMS Equipment Ventilation in normal & jet Baharestan & Ememzade fan in emergency Mohamad HVAC Emamzadeh mohammad Well absorbed & Hole Drain System Hole BaharestanDrain System Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Signaling Info RTU , I/O Rock Scada System Control & Monitor E/M BMS Equipment Ventilation in normal & jet Baharestan & Ememzade fan in emergency Mohamad HVAC Emamzadeh mohammad Well absorbed & Hole Drain System Hole BaharestanDrain System Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Train Info Info )T:Trailer- L:Locomotive( L-10*T-L Title Fleet 25 kv AC OCS Type Of Power Supply AC Or DC Motor With Series Actuator & 800KW Power Consumption Package- Supply Fresh Air Main Motor Electrical Heater Heating Central Control – Announcing Without Amplified Voice Internal Telephone Voice Alarm System Project Management: Tadbir Omran Iranian Ventilation Safety Alarm System Ministry of Road and urbanism Transit Traffic When the Mashhad-Golbahar commuter built, it will attract 73% of other system transit passenger. It will be about 337567 person Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Commuter railway of Mashhad-Golbahr Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Mashhad Golbahar Electrification Railway Vakil Abad (mashhad Station) Samen Station Golbahar 2 Station Golbahar 1 Station Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Rolling stock Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Rolling Stock main Characteristics Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Number of trains & Headway per years Project Management: Tadbir Omran Iranian Ministry of Road and urbanism Thank You For Your kind Attention Project Management: Tadbir Omran Iranian