Transcript Slide 1

Ministry of Road and urbanism
Mashhad Golbahar Suburban Railway
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Mashhad Urban Railway networks
Line 3
Line 1
Line 4
Line 1: 24 km length /22 station
Line 2: 15 km length /13station
Line 3: 25 km length /22 station
Line 4: 14 km length /14station
Line 5: 46 km (Mono rail)
Total:
124 km line
117 Stations
Line 2
Ministry of Road and urbanism
Golbahar Commuter Railway
Urban Rail
Transit
Mono Rail
Tramway
LRV
Light Metro
Heavy 
Metro
SOURCES: TCQSM speed and capacity estimation procedures,
TCRP Report 13 (R5),
Studying of operation plan and metro system of Golbahar
Ministry of Road and urbanism
Introduction New town of Golbahar
 Suburban city of Mashhad the
distance app. 45 km
 In accordance with plan of
Golbahar, population will grow up
to 400000 persons
 The area of town is 4000 hectares
 Attraction of Golbahar
 Tanning airport, tourist air port
 Azad university
 Artificial lake
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Connection way between Mashhad and Golbahar
1.
2.
Mashhad-Ghuchan free way
Old way of Mashhad-Ghuchan
3.
Historical way of Mashhad-Ghuchan
Project Management: Tadbir Omran Iranian
Map
Golbahar
Mashhad
Golbahar
‫گلمکان‬
Samen Stadium
‫شانديز‬
Mashhad
Golbahar
Mashhad-Ghochan Exp.
Mashhad
‫جاده شانديز‬
Golmakan
Shandiz
Torghabeh
Phase 4
Phase 1
Phase 2
Phase 3
Ministry of Road and urbanism
Metro System
11
Line No.1 Mashhad Metro
Urban lines connecting
40 km
Length of Rail Way
4
Number Of Station
1435 mm
Track Gauge
140 km/h
Design speed
2 loco- 10 wagon
Fleet
)T:Trailer- L:Locomotive(Loco-10T-Loco
Arrangement Of Fleet
25kv (OCS)
Power Supply System
2500 Person
Train Capacity
298 m
Length of Train
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Traffic Info
12
1415
Design Future Year
530.000 person
The maximum estimated population
210.000 passenger/day
The estimated railway travel
27952passenger at rush
hour
PPHPD
2500 passenger
The train capacity
8 min
Headway
Project Management: Tadbir Omran Iranian
Station Info
Ministry of Road and urbanism
+3.50( Ground Level to Platform level)
Lateral Ticket Hall
4 leveles (main
hall+platform+under
platform+under pass)
300 m
Station Length
≈35m
Platform Width
2
Entrance Quantity
Double Island/insular
Platform Type
Project Management: Tadbir Omran Iranian
Station Level
Station Type
Floor Quantity
Ministry of Road and urbanism
Station Info
Golbahar New Town (Near
mashhad city )
Station Location
4
Line Quantity
New Town Development
Organization Co.
Ownership
Average Size=(5m×3m)
Room Dimension
6m×4m
Local Control Room
Dimension
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Station Info
13m×6m
[signaling &Communication]
Room Dimension
Natural Ventilation & Air
Washer
HVAC#4 Type
No/Hadn`t
DWP(Dimension , Quantity ,
Pump Type)
9m×6m
Fire Fighting Source Dimension
Galvanized Iron & Cast- Iron &
PE
[Sewage ]Pipe Material
Copper
HVAC Pipe Material
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Station Info
Pex-Al-Pex & Galvanized Iron
Water Pipe Material
Galvanized Iron & Isolated
Galvanized Iron
HVAC Duct Material
2 (13m×5.5m)
2(4m×3.5m)
Project Management: Tadbir Omran Iranian
Dimension & Quantity
of LPS
Dimension & Quantity
of Sale Ticket Room
Ministry of Road and urbanism
Application Area In Station
80m²
Commercial
480m²
Administrative
220m²
Cultural - Religious
1800m²
[Main Hall]
50m²
Fire Fighting
(35m×300m)=10500m²
Internal Transportation
Terminal
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Application Area In Station
≈17000m²
Green Area
≈(35m×300m)+
( 43m×85m)=14155m²
Station Building
≈(320m×150m)=48000m²
Station Environment
Total Area(with Local Road)
≈17000m²
Open Parking Area
According to Golbahar new
town Detail Design
Network & Road City
48000m²-50000m²
Total Area
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Pavement Info
19
UIC60
Type Of Rail
22 Ton
Axial load
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Train Info
20
Info
Title
L-10*T-L
Fleet
25 kv AC OCS
Type Of Power Supply
AC Or DC Motor With Series Actuator & 800KW
Power Consumption
Package- Supply Fresh Air
Main Motor
Electrical Heater
Heating
Central Control – Announcing Without Amplified
Voice
Internal Telephone
Voice Alarm System
Project Management: Tadbir Omran Iranian
Ventilation
Safety Alarm System
Ministry of Road and urbanism
Depot Info
10 Hec.
Depot Area
400 m^2
Signaling , Control ,
Telecommunication
Building
1000 m^2
Store Building
200 m^2
10000 m^2
Fire Fighting Water
Source
Parking , Daily Inspection
light maintenance Salon
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Depot Info
6000 m^2
200 m^2
Administrative , cultural
, Sport Building
Heavy Machinery
Parking
150 m^2
Personnel Room
70 m^2
Rolling Stock & Line
Room
700 ml
Length of Railway
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Depot Info
1000 m
Length of Access Road
30
Switch Point Quantity
500000 m^3
Total Excavation
100000 m^3
Total Embankment
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Signaling Info (Line Electrical)
OCS , 25 KV ,
Autotransformer Substation
Power Supply
2 Post (1 SP & 2 ATP)
Substation Quantity
Open Yard
Substation Type
Substation is feeding
Mashhad line 1
Feeding Point
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Signaling Info (Station Electrical)
City Network
Power Supply
2 LPS
Substation Quantity
In mid of platform
Substation Location
1 Feeder Standby
Feeder Quantity
20 kv
Feeder Voltage
Diesel Generator
Emergency Power
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Signaling Info (Station Electrical)
Split Unit
Centrifuge
Automatic Gas
Water
Ventilation (Technical
Rooms)
Ventilation (Other
Space)
Fire Fighting(Equipment
Room)
Fire Fighting(Other
Space)
Track circuit , axel counter
Project Management: Tadbir Omran Iranian
Train Detection
Ministry of Road and urbanism
Signaling Info
Point Machine , Signal
Wayside Equipment
Automatic Train Protection ,
Display Panel , internal
control
Rolling Stock
Switches , Fibber optic , …
Transmission System
LCD Located in Station
Public & Emergency
System
Announcing by loudspeaker
Public Alarm
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Signaling Info
RTU , I/O Rock
Scada System
Control & Monitor E/M
BMS
Equipment
Ventilation in normal & jet Baharestan & Ememzade
fan in emergency
Mohamad HVAC
Emamzadeh mohammad
Well absorbed & Hole
Drain System
Hole
BaharestanDrain System
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Signaling Info
RTU , I/O Rock
Scada System
Control & Monitor E/M
BMS
Equipment
Ventilation in normal & jet Baharestan & Ememzade
fan in emergency
Mohamad HVAC
Emamzadeh mohammad
Well absorbed & Hole
Drain System
Hole
BaharestanDrain System
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Train Info
Info
)T:Trailer- L:Locomotive( L-10*T-L
Title
Fleet
25 kv AC OCS
Type Of Power Supply
AC Or DC Motor With Series Actuator & 800KW
Power Consumption
Package- Supply Fresh Air
Main Motor
Electrical Heater
Heating
Central Control – Announcing Without Amplified
Voice
Internal Telephone
Voice Alarm System
Project Management: Tadbir Omran Iranian
Ventilation
Safety Alarm System
Ministry of Road and urbanism
Transit Traffic
 When the Mashhad-Golbahar commuter built, it will attract 73% of
other system transit passenger.
 It will be about 337567 person
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Commuter railway of Mashhad-Golbahr
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Mashhad Golbahar
Electrification Railway
Vakil Abad (mashhad Station)
Samen Station
Golbahar 2 Station
Golbahar 1 Station
Project Management: Tadbir Omran Iranian




Ministry of Road and urbanism
Rolling stock
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Rolling Stock main
Characteristics
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Number of trains & Headway per years
Project Management: Tadbir Omran Iranian
Ministry of Road and urbanism
Thank You For Your kind Attention
Project Management: Tadbir Omran Iranian