Northrop Grumman Ship Systems Tysons Corner, VA

Download Report

Transcript Northrop Grumman Ship Systems Tysons Corner, VA

Northrop Grumman Ship Systems
14th annual International Integrated
Program Management Conference
Washington D.C.
November 2002
1
Northrop Grumman Ship Systems
14th annual International Integrated
Program Management Conference
Washington D.C.
AGENDA
•
•
•
•
Overview of Northrop Grumman Ship Systems
Engineering & ILS Program Labor
Progress/Earned Value/BCWP
Design Engineering EVMS Applications
– LHD 5 & 8
– DDG 51 Class
– Composite Fabrications
November 2002
2
Northrop Grumman Ship Systems
Ship Systems Overview
14th annual International Integrated
Program Management Conference
Washington D.C.
Northrop Grumman Ship Systems (NGSS), headquartered in
Pascagoula, Mississippi was formed on August 1, 1999. It includes
Ingalls Operations (Pascagoula), Avondale Operations in New Orleans
and Tallulah Louisiana, and Gulfport, Mississippi.
NGSS currently employs more than 17,000 shipbuilding professionals
and is one of the nation’s leading full service systems companies for
the design, engineering, construction and life cycle support for U.S.
Navy and commercial surface ships.
NGSS has a funded backlog exceeding $8.0 billion, in a variety of
naval and commercial shipbuilding programs.
November 2002
3
Northrop Grumman Ship Systems
Ship Systems Overview
AVONDALE
OPERATIONS
14th annual International Integrated
Program Management Conference
Washington D.C.
INGALLS
OPERATIONS
November 2002
4
Northrop Grumman Ship Systems
14th annual International Integrated
Program Management Conference
Washington D.C.
Newport News
November 2002
5
Northrop Grumman Ship Systems
Major Budget / Cost Categories - Labor
14th annual International Integrated
Program Management Conference
Washington D.C.
LABOR
INDIRECT
DIRECT
VESSEL LABOR
(SHIP/CRAFT)
IDENTIFIED BY CONTRACT,
SHIP, CWBS, C/C, ACCOUNT
AND WORK PACKAGE (BILL #)
PROGRAM LABOR
(DIRECT
SUPPORT)
CONTROLLED BY
OVERHEAD ACCOUNTS
AND COST CENTERS
IDENTIFIED BY CONTRACT,
CWBS, C/C, ACCOUNT AND
WORK PACKAGE (MWP)
WELDING
FITTINGS
ENGINEERING
PROGRAMS MANAGEMENT
PAINTING
PRODUCTION PLANNING
OUTFITTING
PRODUCTION CONTROL
ETC.
ETC.
November 2002
6
LHD Program Value
By Category
Material
48%
Northrop Grumman Ship Systems
Other Program
Labor
4%
14th annual International Integrated
Program Management Conference
Washington D.C.
Engineering
12%
Manufacturing
Labor
36%
November 2002
7
Northrop Grumman Ship Systems
14th annual International Integrated
Program Management Conference
Washington D.C.
Engineering Functions
•
•
•
•
•
•
•
•
•
•
Program Engineering
Systems Engineering
Field Engineering
Naval Arch/Elect
Noise, Shock & Vibration
Control
Engineering Test and
Evaluations
Trials
Marine Technical
3D Detail Design
2D Design
•
•
•
•
•
•
•
•
Numerical Controls & MFG Aids
Electrical Technical
Electrical Design
Combat Systems Technical
Combat Systems Test
Weight Control
Engineering Configuration Mgt.
Engineering R & D
November 2002
8
Northrop Grumman Ship Systems
ILS Functions
•
•
•
•
•
14th annual International Integrated
Program Management Conference
Washington D.C.
Reliability, Maintainability & Quality
Maintenance & Provisioning
Inventory Mgmt & Allowance
Config. Data Mgt./Life Cycle Mgt.
Eng. Technical Publications
November 2002
9
Northrop Grumman Ship Systems
Progress /Earned Value :BCWP
14th annual International Integrated
Program Management Conference
Washington D.C.
•EVMS Provides Engineering Supervision a Weekly
Detailed Progress Report Bill Listing
•Management Uses this Report to Evaluate the Overall
Progress and Performance of the Task
•Discrete Physical Progress
•Apportioned Effort
•Level Of Effort
•Progress is Updated Weekly
November 2002
10
Northrop Grumman Ship Systems
Design Engineering
Earned Value Applications
•
•
•
•
14th annual International Integrated
Program Management Conference
Washington D.C.
LHD5 Modification
LHD8 Redesign
DDG 51 Class - Flight IIA
Composite Fabrications
November 2002
11
Northrop Grumman Ship Systems
LHD Program
November 2002
14th annual International Integrated
Program Management Conference
Washington D.C.
12
Northrop Grumman Ship Systems
LHD5 Modifications (April 1992)
•
•
•
•
•
•
14th annual International Integrated
Program Management Conference
Washington D.C.
First Drawing Level earned value application
Initiated by Ingalls & approved by Navy
Reported to First Line Engineering Supervisor
Budget reconciled to Work Packages
Progressed weekly
Progress input to monthly CPR
November 2002
13
Northrop Grumman Ship Systems
LHD 5 Lessons Learned
14th annual International Integrated
Program Management Conference
Washington D.C.
• Drawing Work Packages are too detailed
• Focus on category of work vs. organization
• Good planning tool for Engineering Managers
November 2002
14
LHD8 Application
Northrop Grumman Ship Systems
A ‘Two-Tier’ System
14th annual International Integrated
Program Management Conference
Washington D.C.
• Use local PC files to track individual models &
drawings
• Summarize to Work Packages for EVMS
• Identify Work Packages to Category
• Maintain Supervisor visibility
• Ensure budget reconciliation
• Continue to progress weekly
November 2002
15
Northrop Grumman Ship Systems
DDG 51 Program
14th annual International Integrated
Program Management Conference
Washington D.C.
DDG 51 Program – The ARLEIGH BURKE Class Aegis Destroyers
November 2002
16
Northrop Grumman Ship Systems
DDG 51 Class Flight IIA Design
14th annual International Integrated
Program Management Conference
Washington D.C.
• Engineering Work Packages by ship zone
• Joint reporting with Bath Iron Works (BIW) to
NAVSEA
• Weekly progress, cost updates & reporting
November 2002
17
Northrop Grumman Ship Systems
Composite Fabrications
14th annual International Integrated
Program Management Conference
Washington D.C.
• Carderock Naval Surface Warfare Center
• Joint project with Ingalls Facility, and Avondale
Facility(Gulfport, MS)
• EVMS tracking Engineering & Manufacturing
• Shared Drive file showed all Work Packages and
was updated weekly for progress and cost
November 2002
18