Segment Agenda Topic

Download Report

Transcript Segment Agenda Topic

ISCN
Top Down and Bottom Up
Architecture Implementation
Space Internet Workshop 2004
Presented by:
Dr. Richard A. Russel
SCNC Chief Architect
Northrop Grumman Mission Systems
[email protected]
UNCLASSIFIED
1
Integrated Satellite Control Network (ISCN) Notional Vision
MDA/TMD
Military
Satcom
Relay
National
Space Based Relay
(SBR),TCS, and TDRSS
Technology Options
Navigation
R&D
Environmental
Dedicated
DoD GN
Department of Defense (DoD) Dedicated
Mission Centers
Shared Ground
Network (GN).
See Figure 4 for
Details
AFSCN Satellite Operations Center (SOCs)
Multi-band (USB / SGLS), Phased
Array, Multi-Contact, Automated and
Remotely Configured Antennas,
Software Programmable Transceivers,
Centralized NMS, Priority driven for
Scheduling, Monitoring, Management,
and automated fault management
Dedicated
Civil GN
Civil Dedicated
Establish an interoperable, shared ISCN based on ground elements of current
DoD, NASA, NOAA, and other networks augmented by Government
sponsored space-based assets
S030550
UNCLASSIFIED
2
Overview
• ISCN can be developed by a combination of
Top-down and Bottom-up architecture
development and planning
• Top-Down
• The AFSCN is the first space system
that has been fully characterized using
the architecture views per the DoD
Architecture Framework (DODAF)
• SCNC Architecture Team is developing
the ISCN views as part of FY05 task
UNCLASSIFIED
3
Overview
• Bottom-Up
•
SCNC has developed an AFSCN Roadmap that
characterizes all projects down to
requirements, cost and schedule – this is
being used for POM inputs by SMC/RN and
AFSPC/DR
•
The Roadmap will sequence all projects
leading to ISCN by a realistic sequencing of
projects based on technical and fiscal
constraints, and the relationship to current
legacy installations
UNCLASSIFIED
4
SCNC Progress to Date – AFSCN DoDAF Products
Top Down
Architecture
View
All
All
Operational
Operational
Operational
Operational
Operational
Operational
Operational
Operational
Operational
Systems
Systems
Systems
Systems
Systems
Product
Reference
AV-1
AV-2
OV-1
OV-2
OV-3
OV-4
OV-5
OV-6a
OV-6b
OV-6c
OV-7
SV-1
SV-2
SV-3
SV-4
SV-5
Systems
Systems
Systems
Systems
Systems
Systems
Systems
Systems
Technical
Technical
SV-6
SV-7
SV-8
SV-9
SV-10a
SV-10b
SV-10c
SV-11
TV-1
TV-2
Product Title
Overview and Summary Information
Integrated Dictionary
High-level Operational Concept Graphic
Operational Node Connectivity Description
Operational Information Exchange Matrix
Command Relationships Chart
Activity Model
Operational Rules Model
Operational State Transition Description
Operational Event/Trace Description
Logical Data Model
System Interface Description
Systems Communications Description
2
Systems Matrix
Systems Functionality Description
Operational Activity to System Function
Traceability Matrix
System Information Parameters Matrix
System Performance Parameters Matrix
System Evolution Description
System Technology Forecast
Systems Rules Model
Systems State Transition Description
Systems Event/Trace Description
Physical Data Model
Technical Architecture Profile
Standards Technology Forecast
UNCLASSIFIED
Essential or Supporting
Essential
Essential
Essential
Essential
Essential
Supporting
Supporting
Supporting
Supporting
Supporting
Supporting
Essential
Supporting
Supporting
Supporting
Supporting
FY02 Views
FY03 Views
FY04 Views
Supporting
Supporting
Supporting
Supporting
Supporting
Supporting
Supporting
Supporting
Essential
Supporting
5
OV-2 View: AFSCN Operational Node Connectivity
Top Down
UNCLASSIFIED
6
OV-5 View: AFSCN Activity Model
Top Down
UNCLASSIFIED
7
SV-1 View: AFSCN System Interface Description
Top Down
UNCLASSIFIED
8
SV-3 View: AFSCN Systems2 Matrix
Top Down
OSR
X
X
X
X
X
X
X
X
Antenna
Subsystem
DCC
Ra
BII
X
WANIU
Multiplexer
X
Communications Segment
OSR Network
Manager
Test Driver
System
Data Distribution Subsystem
Command and
Mission Control Complex/SOC
Control Segment
Test Driver System
OSR Network Manager
WANIU Multiplexer
Communications
BII
Segment
DCC
OSR
Antenna Subsystem
Control and Status Subsystem
Range Segment
Interoperability Enhancements
TT&C Subsystem
Resource
Performance Evaluation (SNAP)
Management
ESD
Segment
OAS
Satellite Control CUE User
Users
Non-CUE User
CMOC
CMOC
Mission Control
Complex/SOC
Data Distribution
Subsystem
Command and Control Segment
X
X
X
X
X
X
X
X
X
X
X
X
UNCLASSIFIED
9
TV-1/TV-2 Views: AFSCN Combined
Top Down
Service Area
Service
Communication
Services
Analog Facsimile
Standards
Communication
Services
Analog Facsimile
Standards
Communication
Services
Bootstrap Protocol
Communication
Services
Bootstrap Protocol
Mandated Standard/
Emerging Standard
EIA/TIA-465-A ,
Group 3 Facsimile
Apparatus for
Document
Transmission, Jun 95
EIA/TIA-466-A ,
Procedures for
Document Facsimile
Transmission, May
97
IETF RFC 1542,
Clarifications and
Exts for the
Bootstrap Protocol,
27 Oct 93
Current Standard
Near-Term Standard
Resource
Management
Segment - OAS:
Same as mandated
standard
Resource
Management
Segment - OAS:
Same as mandated
standard
Range Segment:
Same as mandated
standard
Resource
Management
Segment - OAS: TBD
Resource
Management
Segment - OAS: TBD
IETF RFC 951,
Range Segment:
Bootstrap Protocol, 1 Same as mandated
Sep 85
standard
Resource
Management
Segment - OAS:
Same as mandated
standard
UNCLASSIFIED
Mid-Term Standard
Far-Term Standard
Resource
Management
Segment - OAS: TBD
Resource
Resource
Management
Management
Segment - OAS:
Segment - ESD: TBD
Same as mandated
standard
Resource
Management
Segment - ESD: TBD
Resource
Resource
Management
Management
Segment - OAS:
Segment - ESD: TBD
Same as mandated
standard
Resource
Management
Segment - ESD: TBD
10
Current Works on DoDAF Products - FY04
Top Down
• Maintain “As-is” Architecture
– Incorporate any baseline changes
– Add new DoDAF Products
• SV-2 System Communication Description
• SV-6 System Information Exchange Matrix
• Provide “To-Be” ~2011 Architecture
– Uses AFSCN Roadmap as Driver
– Uses “As-is” Architecture as starting point
– Will show operational, system and technical
architecture changes
UNCLASSIFIED
11
ISCN Roadmap Architecture Evolution
Bottom Up
User Spacecraft
Tracking Segment
Human
Spaceflight
Communications
National
Other User
Constellations
Military
Weather
Science
Navigation
Signals for
Tracking
GPS Constellation
Mission
Payload
Data
Space Based Relay
RF Link
RF Link
RF Link
Dedicated
User
Assets
RF Link
Partially Deployed
Space Relay
Civil
Augmentation
DLTs
Data Flows
(e.g. TT&C,
Payload)
WAN
Data Flows
(e.g. TT&C,
Payload)
User Control
Centers
(DoD, Civil,
and Commercial
SOCs/MOCs)
RF Link
AFSCN RTS
Assets
Range Segment
Support TT&C and
Mission Payload Data
Control and
Status Flows
(e.g. Schedules,
Vectors)
WAN
Current AFSCN
Architecture
• Range Segment: Initial RTS upgrades
started; full upgrade started.
• Network Management Segment: OAS
follow-on started
• Communications Segment: WANIUs
still in use at legacy systems; OSR complete
DISN backbone in place.
• User Services in SGLS; enable
SOC migration away from CCS.
• Interoperability study phase underway.
Control and
Status Flow
(e.g. Schedules)
Space-Based
Relay
Upgraded DLTs
Space
Segment
Ground
Assets
Commercial
Augmentation
Civil
Augmentation
AFSCN RTS
Assets
Range Segment
Unattended Operations Capability
AFSCN OCN
(SAFB)
AFSCN BCN
(OAFS)
Network Management Segment
Enhance Orbital Analysis and
Network Management
AFSCN RTS
Assets
Range Segment
Support TT&C and Mission Payload Data
Control and
WAN Status Flow
(e.g. Schedules)
AFSCN OCN
(SAFB)
WAN
Upgraded
DLTs
Commercial
Augmentation
Civil
AFSCN BCN
(OAFS)
Commercial
Network
Management Segment
Interoperable, Robust,
and Highly Automated
AFSCN OCN
(SAFB)
Control and
Status Flow
(e.g. Schedules)
Network Management Segment
Increased Interoperability
Commercial
AFSCN Space Operations
Architecture
• Range Segment: RTS upgrades underway.
• Communications Segment: Increased capability per user
requirements; WANIUs may still be in place for legacy
SOCs support.
• Commercial augmentation.
• Support in SGLS and USB.
• SBIRS SQPSK support.
• OAS Phase 3 and 4 in progress.
• IP Nets in progress.
• CCS is decommissioned, OAS backup in place.
• ESD 3.0 complete.
• Upgraded communications and timing.
• RBC Transportable in place.
• Enhanced capability to handle peak loading.
• EVCF upgraded.
• Offline testbed and training.
WAN
Civil
AFSCN and Partial ISCN
Architecture
• Range Segment: Interoperability across DoD, civil,
and commercial.
• Space Segment: GPS Tracking.
• Communications Segment: Connectivity/peering across DISN, (GIG),
NASA, NOAA, and commercial networks.
• Customers/User: Single, standard based interface to SOCs/MOCs.
• Phased array ACTD.
• ISS complete.
• OAS Phase 3 and 4 complete.
• Remote operations in place.
• WANIF in progress, TCS and GIG interoperability.
• DLT replacement complete.
• NMS web enabled and distributed database.
Upgraded DLTs
Space
Segment
Ground
Assets
Commercial
Augmentation
Civil
Augmentation
AFSCN RBC
Assets
Range Segment
Support TT&C and Mission Payload Data
Network
Management Segment
Interoperable, Robust,
and Highly Automated
NSSA OCN
(SAFB)
Commercial
WAN
Control and
Status Flow
(e.g. Schedules)
Civil
ISCN Compliant
Architecture
• Range Segment: Interoperability across DoD, civil,
and commercial.
• Space Segment: Deployed space based relay, Initial multi-contact
antenna capability.
• Network Management Segment: Federated scheduling system.
• Communications Segment: Connectivity/peering across DISN, (GIG),
civil, and commercial networks.
• WANIF complete.
• Start of phased array:
— Multi-band
— Simultaneous multi-contact
— Radar tracking while communicating
• RBC complete.
• Automated scheduling integrated with remote operations.
S030552
UNCLASSIFIED
12
AFSCN RTS Block Upgrade (RBC) Site Ordering Plan
Bottom Up
RBC SITE ORDERING CHART
DRAFT
As of: 21 August 2003
FY03
Jan
Apr
FY04
Jul
Oct
Jan
Apr
FY05
Jul
Jan
Apr
FY06
Jul
Jan
Oct
Oct
Oct
Typhoon
Typhoon
Typhoon
Apr
SBIRS
GEO #1
Launch
FY07
Jul
Jan
Apr
FY08
Jul
Oct
Jan
Apr
FY09
Jul
Jan
Oct
Apr
FY10
Jul
Oct
Jan
Apr
FY11
Jul
Oct
Typhoon
Jan
Apr
FY12
Jul
Jan
Oct
Typhoon
Apr
FY13
Jul
Oct
Jan
Apr
Jul
Oct
Typhoon
Typhoon
O
Typhoon
Typ
AFSCN PEAK LOADING
Thule
Thule
Thule
Thule
Planning
WA
EVCF
Thule
Thule
Thule
Thule
[Replace 10m Antenna]
2 Yr Comm RFS
[Replace 10m Antenna]
TCS-B Core & Antenna1
Transport
via Boat/
Aircraft
DSC NHS-A Antedo
1
TSTR ARTS Core
Planning
WA
TVCF Antenna & TSTR Core1 for
Operation & Loading (@ LION or REEF)
1
DGS-B Comm
Segment Upgrade
2 Yr Comm RFS
2 Yr Comm RFS
Transport
via Boat/
Aircraft
[Replace 46-ft Antenna]
[HPA Options under
consideration]
DGS-B Core
Transport
via Boat/
Aircraft
Transportable #12
[Replace Last 60-ft Antenna, HPUE, New Location]
HPA Study
[PD-0187]
HPA Development
& Production
GTS-A Core and Antenna1,4
[Replace 60-ft Antenna, New Location]
Test Bed
Typhoon
Typhoon
Typ
HTS-A Core and Antenna1
Testbed
HPA
TVCF Ant
Option
Thule
1, 5 1
VTS-A
Core
and
Antenna
VTS-A
Core
and
Antenna
TVCF Ant
[Replace 10m Datron Ant, New Location]
Thule
NHS-A Core and A
[Replace 10m Antenna]
[Replace 13m Antenna, HPU
CTS-A
HPA
[Oldest ARTS Core]
Typhoon
Thule
TTS-C Antenna
VTS-A
HPA
CTS-A Core and Ant.1
Typhoon
Transportable #12
VTS-B Core and Antenna2,6
DGS-B Antenna1
[New Ant. Location,
Expand Core Facility]
DGS-A Core and Antenna
Transport
via Boat/
Aircraft
2 Yr Construction Lead Time @ Diego
DGS Construction
Planning
[Replace 60-ft Ant, HPUE]
[Rep
Operational Comm Segment Upgrade
Planning
WA
[3600 1st Article HPA(s)
3080 Other HPAs]
TVCF Ante
TCS-A Core and
Transportable #12
[HPUE]
Thule
LION-D Comm
Segment Upgrade
[6-ft Ant]
TTS-C Core
Typhoon
GTS-B Core and Ant.1
TTS-B Core
[Replace 46-ft Ant,New Location Low Power HPA Option 3rd Side]
N
GTS-B
HPA
1
Trans #1
HPA
Transportable #1
T
Thule
Thule
Thule
TTS-B Antenna
TTS-A
RFI Monitor [PD-0198]
[Replace 11m (Youngest) Antenna, New Location]
Thule
Thule
2
Thule
3-
TTS-A
TTS-B Antenna
4
-
[Replace 46-ft Antenna]
5
o
NHS-B Core and Antenna1
Potential Topics for Analysis:
1) Baseline Loading w/ new order
2) TCS-D or DGS-B?
3) NHS-A swap w/ CTS
4) HPA options for DGS-B
TTS-A Core
[Replace 46-ft Antenna at old NHS-A site]
HTS-B Core and Antenna
[Replace 46-ft Antenna]
6
sm
Key:
3600 Funds
Transportable #2 w/ HPA
[Use for AFSCN Operations]
A. Sakamoto/SCNC SAE
21 August 2003
Version 1.6
Pre-Install
Install
POC: Maj
DRAFT
UNCLASSIFIED
13
Roadmap Timeline - Development Project Descriptions (PDs)
Bottom Up
Current POM Cycle
Segm ent Nam e
PD No.
WA No.
FY02
FY03
FY04
FY05
FY06
FY07
FY08
FY09
FY10
FY11
FY12
FY13
FY14
FY15
Developm ent PDs
ALL
NMS
CS
Interoperability
Effort includes studies, demonstrations, and proof of concept activities
PD-0003
Study
Obscura Study
PD-0205
Study
Automated IRON Database Management
PD-0219
Study
CRSS
PD-0221
DGS-B and LION-D Impacts
PD-0226
Study
Popkin/Rational Integration
PD-0227
Study
SA Tool for OCN Coordination
PD-0228
Study
Information Assurance
PD-0004
I&TSF
PD-0043
ISCN Concept Refinement
PD-0052
Study
RBC Loading Analysis
PD-0053
Study
Next Generation Architecture Optimization F/O
PD-0111
NMS Evolution Study
PD-0026
OAS F/O Phase 2
PD-0024
OAS Phase 3
PD-0190
OAS Backup
PD-0182
OAS Training Suite Relocation
PD-0223
OAS Phase 4 - Guards
PD-0074
ISS
PD-0029
NMS Enhancement
PD-0191
AFSCN Comm Segment Evolution Study
PD-0039
RBC Physical Interface IP Connectivity
PD-0186
KAFB External Comm Connectivity
PD-0020
Determine Bandw idth for RBC
Timing Comm Mod Kit Development and Installation
C&CS
PD-0037,0211
Baseline End-to-End Netw ork Loading Study
Study
Study
Study
Note - DR to define requirement
Study
PD-0224
PD-0202,0203
VAFB External Users Connectivity
PD-0047
TCA/TDRSS Augmentation
PD-0057
WANIF
PD-0097
Comm S&P Studies - Far Term
PD-0105
SOC Interface Evolution
PD-0008
CCS Database Rehost
PD-0231
Study
Study
Study
UNCLASSIFIED
14
NMS – Enabler of ISCN
Bottom Up
• Enterprise “Services”
Subsystem (composed of
“Services” and “Interface” hosts)
• “Status” Subsystem (all
AFSCN status in one place)
• “Remote” Subsystem
(extends EMS reach out to the
remote sites)
• EMS-capable Workstations
(simple browser-capable PCs bring
the power of the enterprise solution
to all user groups)
UNCLASSIFIED
15
Development of Interoperable Data Transfer Standards
Bottom Up
legacy serial interfaces
DoD RTS
Civil RTS
Commercial
RTS
• Prototyping designs for
future AFSCN interfaces
that enable use of Internet
protocols, while
maintaining DoD-unique
performance
requirements
international standards
packet switched network
• Global Information Grid
• Internet
• leased commercial carrier
CCSDS SLE
DoD SOC
Civil SOC
NOAA
Air Force
Navy
NASA
Army
UNCLASSIFIED
• Verifying emerging
international ground
segment standards for Air
Force operations;
providing inputs to evolve
these standards
16
ISCN Candidate Sites
Bottom Up
UNCLASSIFIED
17
Phased Array Future Technology Provides Simultaneous Contact
Capability
Bottom Up
Excerpt from Dr. Shiang Liu brief
UNCLASSIFIED
18
ISCN Site Ordering Planning Process
Bottom Up
IL
AM
FY05
Thule
FY09
FY10
FY11
FY12
Jan Apr Jul
Jan Apr Jul
Jan Apr Jul
• II
TC
•
3C
OM
ICAT
ION
M
T
AC
W
S
•
UN
KC
ON T
RO L N E T W O R
FY13
Jan Apr Jul
Oct
Oct
Oct
Oct
Typhoon
Typhoon
Typhoon
Typhoon
Thule
Thule
Thule
Thule
Thule
FY15
FY16
Jan Apr Jul
Jan Apr Jul
Oct
Oct
Typhoon
Typhoon
Thule
Thule
[New Ant. Location, Expand Core Facility]
TVCF Ant
Typhoon
VTS-A Core and Antenna1
Transportable #1 [Save money on
Option: Legacy Trans - No
Construction Costs
[Maintain separation to retain
Eastern Hemisphere integrity]
[Need HPA]
TCS-B Core and Antenna1
Transport via
Boat/Aircraft
Transportable #12
DGS-B Antenna1
transport]
HPA Prod
(incl. VTS-A)
Transportable #2 at NHS
[Replace 60-ft Antenna, New Location]
[Replace 10m Datron Ant, New Location]
CTS-A Core and Ant.1
HTS-A Core and Antenna1
CTS-A HPA
Thule
Typhoon
GTS-B Core and Ant.1
[Replace 46-ft
Ant,New Location
(confirm this), Low
Power HPA Option
3rd Side]
Thule
[Replace 10m Antenna]
Thule
VTS-B Core and Antenna
TTS-C Antenna
GTS-B HPA
[Replace 46-ft Antenna]
Transportable #1
TTS-C Core
[Oldest ARTS Core]
Trans #1 HPA
NHS-B Core and Antenna1
Test Bed
[Replace 46-ft Antenna]
Thule
Thule
Thule
[Replace 11m (Youngest) Antenna, New Location]
TTS-A Core
[Potential Resource]
[3600 Funding]
RFI Monitor
Notes:
1 - SQPSK rqmts based on site ordering is articulated in SBIRS
PRD Rev-A (8/28/01):
a) Test/Early On-Orbit Test: Transportable (e.g., TSTR),
NHS, VTS, DGS, TCS, and GTS
b) Operations: DGS, TCS, GTS, CTS, and HTS
2 - Additional costs for transportable pad @ DGS
FY03
FY04
FY24
Typhoon
Typhoon
Thule
Jan Apr Jul
FY25
Jan Apr Jul
Oct
Thule
Thule
Total
Thule
VTS (A, B, C, D)
Phased Array Upgrade
EVCF
GFE & Comm
Upgrade
EVCF
Phased Array Upgrade
Analysis Req’d:
1) Baseline Loading w/ new order
2) TCS-C, Guam-C, or DGS-B?
3) NHS-A swap w/ CTS
4) Need HPA for DGS-B
TTS-B Core
FY06
FY07
FY08
NSCN RTS
Integration
Finnegayan,
Guam
NSCN CCS
Upgrades PD0104
FY10
NOAA RTS
Integration
Poker Flats, AK
NOAA RTS
Integration
Suitland, MD
NOAA CCS
Upgrades PD0094
GPS Comm
Upgrades PD0083
NOAA SOC
Integration
Suitland, MD
GPS RTS
Integration
Kwajalein Atoll
GPS NMS
Upgrades PD0084
GPS antenna
interoperability
PD-0067
Oct
NASA NMS
Upgrades PD0085
GPS RTS
Integration
Cape Canaveral
Transportable
FY12
FY13
FY14
Commercial CCS
Upgrades PD0095
Commercial RTS
#1 Upgrade
(TBD)
OAS Phase 3 (NMS)
PD-0190
Typhoon
Thule
Typhoon
Thule
FY05
Typhoon
Typhoon
Thule
Typhoon
Thule
Thule
Typhoon
Thule
Typhoon
Thule
Jan Apr Jul
Oct
Oct
Typhoon
Thule
Typhoon
Thule
Phased Array can support 4
simultaneous 2-way links
Phased Array can support SGLS/USB/
X bands
DGS
GFE & Comm
Upgrade
DGS (A, B, C, D)
Phased Array Upgrade
CTS
GFE & Comm
Upgrade
CTS A, B, C, D
Phased Array Upgrade
GTS
GFE & Comm
Upgrade
GTS A, B, C, D
Phased Array Upgrade
TCS
GFE & Comm
Upgrade
$5M
Core
$12.3M Antenna, Facilities
$17.3M
TCS A, B, C, D
Phased Array Upgrade
HTS
GFE & Comm
Upgrade
$5.2M Core
$15.8M Antenna, Facilities
$21M
HTS A, B, C, D
Phased Array Upgrade
FY16
FY17
FY18
FY19
FY21
FY20
FY22
FY23
FY24
FY25
Commercial RTS
#2 Upgrade
(TBD)
FY07
Jan Apr Jul
Oct
FY27
FY26
TTS
GFE & Comm
Upgrade
PARBC
Architecture
FY28
FY29
FY30
FY31
FY32
TTS A, B, C, D
Phased Array Upgrade
PARBC 1st Article NRE
Commercial RTS
#4 Upgrade
(TBD)
Commercial NMS
Upgrades PD0086
Phased Array Architecture
Development
Phased Array Contract Preps
Phased Array
RTS Block
Change Contract
Award
ISS
PD-0029
FY06
Jan Apr Jul
Oct
FY32
Jan Apr Jul
Oct
Assumptions:
WANIF
PD-0097
NMS Enhancement
PD-0191
FY04
FY31
Jan Apr Jul
Oct
NASA RTS
Integration
McMurdo,
Antartica
OAS Phase 4 - Guards
PD-0074
Jan Apr Jul
FY30
Jan Apr Jul
Oct
Commercial RTS
#3 Upgrade
(TBD)
NASA CCCS
Upgrades PD0080
Multi-contact Antenna
(Full Dome Phased Array - ACTD)
PD-0163
Phased Array Demo
AF Space Battlelab
Oct
FY29
Jan Apr Jul
Oct
$20M
FY15
Interoperability Site Ordering
And Implementation Projects
FY03
FY28
Jan Apr Jul
Oct
NASA Space
NASA RTS
(TDRS) RTS
Integration
Integration
Wallops Is., Va
White Sands, NM
NASA Space
NASA RTS
(TDRSS) RTS
Integration
Integration
Merit Is., Fl
Black Is.
NASA Space
NASA RTS
(TDRSS) RTS
Integration
Integration
Wallops Is., Va
Guam
NASA antenna
interoperability
PD-0064
GPS RTS
Integration
Ascension Is.
GPS CCS
Upgrades PD0081
Total
Commercial
antenna
interoperability
PD-0086
NOAA SOC
Integration
Greenbelt, MD
NASA Comm
Upgrades PD0072
GPS RTS
Integration
Diego Garcia
Non-CONUS, Fixed Site
[Replace 46-ft Antenna]
Commercial
Comm Upgrades
PD-0073
NOAA RTS
Integration
Wallops, VA
NOAA NMS
Upgrades PD0058
NSCN SOC
Integration
PT Magu, CA
FY11
NOAA RTS
Integration
Pt. Burrow, AK
NOAA antenna
interoperability
PD-0065
NSCN SOC
Integration
Schriever AFB
NSCN antenna
interoperability
PD-0091
FY09
NOAA Comm
Upgrades PD0082
NSCN RTS
Integration
Prospect Harbor,
ME
NSCN Comm
Upgrades PD0088
Jan Apr Jul
Jan Apr Jul
Oct
Typhoon
Thule
HTS-B Core and Antenna
TTS-B Antenna
[Replace 46-ft Antenna]
FY05
Estimated Costs
CONUS, Fixed Site
TTS-A Antenna
Thule
NSCN NMS
Upgrades PD0091
Oct
FY27
FY26
Jan Apr Jul
Oct
Typhoon
Thule
VTSGFE & Comm
Upgrade
Site Order Constaints
1) No Transportable @ Thule due to
winds (if no radome)
2) 2 CONUS sites before NonCONUS
3) Minimum station downtime
4) No GTS construction during
typhoon season
5) AFSPC/DRNS constraints:
- No MUE capability degradation
- No 2 sites down simultaneously
- Meet SQPSK rqmts (SBIRS/NOPS)1
- No two HP sites down at same time
- Maintain range capabilities
[Replace 13m Antenna, HPUE]
[Use as Emergency Spare Until Needed]
NHS-A Core and Antenna
Typhoon
FY23
Jan Apr Jul
Oct
[Replace Last 60-ft Antenna, HPUE, New Location]
Transportable #2 w/ HPA
Typhoon
Jan Apr Jul
Oct
Typhoon
Thule
P3I Candidates:
1) Timing Upgrade
2) RFI Monitor (Done by FY07)
3) Phased-Array Antennas
[Replace 13m Antenna]
Typhoon
Typhoon
Thule
FY22
Phased Array Site Ordering
Jan Apr Jul
Oct
Typhoon
Thule
FY21
FY20
Jan Apr Jul
Oct
TCS-A Core and Antenna1
GTS-A Core and Antenna1
VTS-A HPA
[Replace 60-ft Ant, No Radome, HPUE]
[3600 Funding]
Thule
FY19
Jan Apr Jul
Typhoon
Site Order Doctrines
1) Oldest to newest antenna
replacement
2) Follow proposal and new
contraints
3) Consider AFSCN Loading
[Replace 10m Antenna]
DGS-A Core & Antenna1
FY18
Jan Apr Jul
Oct
Typhoon
Thule
[Replace 10m Antenna]
Option - Use TVCF/
TSTR Instead
DGS-B Core
TVCF Antenna & TSTR Core1 at Diego
FY17
Jan Apr Jul
Oct
Typhoon
Comm Segment Upgrade
2 Yr Construction
Lead Time
SCNC WORKING DRAFT
O
FY14
Jan Apr Jul
Oct
Typhoon
VIAM INVENIENTUS
Version 0.0
As of 11 Sept 2003
•
L-
TR
•
EC
C • SMC •
RBC Site Ordering
Jan Apr Jul
Oct
AFSCN PEAK LOADING
[6-ft Ant]
ISCN Integration
Study
Transport
via Boat/
Aircraft
TSTR ARTS Core1
FY08
Jan Apr Jul
Oct
Thule
EVCF
DSC NHS-A Antedo
FY07
Jan Apr Jul
Oct
Typhoon
Thule
[HPUE]
FY06
Jan Apr Jul
Oct
Typhoon
ISCN SITE ORDERING CHART
NT
R
LL
IT
CW
AIR FORC
OZ ALLE
NH
• BO
A
T
TE
FY04
Jan Apr Jul
Oct
Typhoon
SP
AR
SA
SP
F
•A
FY03
Jan Apr Jul
Oct
E
T
GR
ES
ITE C O
EL L EYWELL NT RO
• IN
A TO N • H O N
T
ORK
E T WT E M S
L NAL S YS
SCNC WORKING DRAFT
FY08
Jan Apr Jul
Oct
FY09
Jan Apr Jul
Oct
FY10
Jan Apr Jul
Oct
FY12
Jan Apr Jul
Oct
3600 Funding Only
Resource
Pre-Install
Site Preparation
Activities and/or
Dev Activities
Ops Resource
Install
FY11
Jan Apr Jul
Oct
3600 Funds
FY13
Jan Apr Jul
Oct
FY14
Jan Apr Jul
Oct
Jan Apr Jul
Oct
FY15
FY16
Jan Apr Jul
Oct
FY17
Jan Apr Jul
Oct
Jan Apr Jul
Oct
FY18
Jan Apr Jul
FY19
Jan Apr Jul
Oct
UNCLASSIFIED
FY21
FY20
Jan Apr Jul
Oct
FY22
Jan Apr Jul
Oct
FY23
Jan Apr Jul
Oct
FY24
Jan Apr Jul
Oct
Jan Apr Jul
Oct
FY25
Jan Apr Jul
Oct
FY27
FY26
Jan Apr Jul
Oct
RBC Resource
Gov’t GFE
Operational
Resource
Downtime Estimates are
approximate
1wk = Transportables
1 mon = Legacy HPA
Install/Integration/Test
Ant and Core Install
FY28
Jan Apr Jul
Oct
FY29
Jan Apr Jul
Oct
FY30
Jan Apr Jul
Oct
Jan Apr Jul
Oct
FY31
Jan Apr Jul
Oct
FY32
Jan Apr Jul
Oct
Oct
19
The Way Ahead
• ISCN Roadmap
• DoDAF Architecture Products (Future
ISCN/Midterm)
• Network Management Segment Evolution
– Integrated Scheduling System
– Enterprise Management System
– Guards
• Comm Evolution to IP WAN-based infrastructure
• Development of interoperable data transfer
standards
• Architecture Sustainment Roadmap
UNCLASSIFIED
20
Way Ahead Recommendations
• Establish ISCN Site Ordering Task Force to
prioritize and coordinate integration of antennas
and control nodes
• Architect Project Descriptions that implement
the interoperability of the antennas with the
control nodes based on DoDAF architecture and
Roadmap
– Implement low hanging fruit
• Submit updated POM/PBC input that accounts
for the ISCN plan
UNCLASSIFIED
21