New Offshore Wind Tenders in Denmark

Download Report

Transcript New Offshore Wind Tenders in Denmark

New Offshore Wind Tenders in Denmark New Offshore Wind Tenders in Denmark 1,450 MW before 2020

New Offshore Wind Tenders in Denmark

Presentation today

Lisbeth Nielsen Danish Energy Agency Peter Sehestedt Danish Energy Agency Tone Madsen Danish Energy Agency Betina Haugaard Heron Energinet.dk

Danish ambitions on future offshore wind power Two new offshore tenders: 400 MW at Horns Rev and 600 MW at Kriegers Flak Tender of 450 MW nearshore projects Pre-investigations and grid connection

New Offshore Wind Tenders in Denmark

Denmarks’ ambitious green energy policy

Ambitious green energy policy: long-term goal for 2050 – independence of fossil fuels Stable regulatory framework to 2020 Offshore wind broad political support – 95 % of the Danish Parliament Effects in 2020 50 percent of our electricity consumption from wind power

New Offshore Wind Tenders in Denmark

New Offshore Wind projects in Denmark

Horns Rev 3: 400 MW Kriegers Flak: 600 MW Tender for 450 MW near shore wind farms 50 MW turbines for research and development

New Offshore Wind Tenders in Denmark

Preparing for the future

New Offshore Wind Tenders in Denmark

The Danish offshore approach

A track record of political stability Planning and pre-investigations Predictable income DEA is one stop shop Grid connection – large scale and near shore No requirement for local content Transparent and flexible tender process

New Offshore Wind Tenders in Denmark

Integration of wind power

Strong interconnectors A well functioning international market for electricity Flexible electricity consumption

New Offshore Wind Tenders in Denmark

Horns Rev 3 and Kriegers Flak

The most attractive sites The sites chosen for tender ranked the highest in the economic ranking Horns Rev 3 Kriegers Flak

New Offshore Wind Tenders in Denmark

Horns Rev

3 400 MW in the North Sea Denmark's 14th offshore wind farm Local competences and network of suppliers North Sea has good wind conditions Sea depths of less than 20 metres

New Offshore Wind Tenders in Denmark

Kriegers Flak

600 MW in the Baltic Sea Denmark's largest offshore wind farm Located in the Baltic Sea close to borders of Sweden and Germany Will also be linked to the German farm - power can be led to both countries Good wind conditions

Kriegers Flak

New Offshore Wind Tenders in Denmark

We are transparent

Tendering for Horns Rev 3 and Kriegers Flak: Dialogue and negotiation

New Offshore Wind Tenders in Denmark

Common timeline

both projects

2013

February to April 2013 Pre-technical dialogue From May 2013 Technical dialogue

New Offshore Wind Tenders in Denmark

Horns Rev 3

timeline

2013 2014 2015 … 2020

New Offshore Wind Tenders in Denmark

Horns Rev 3

timeline

2013 2014 2015 … 2020

New Offshore Wind Tenders in Denmark

Kriegers Flak

timeline

2013 2014 2015 … 2020

September/October 2015 Concession contract and construction permit

New Offshore Wind Tenders in Denmark

Kriegers Flak

timeline

2013 2014 2015 … 2020

New Offshore Wind Tenders in Denmark

Nearshore wind projects

Sæby North Sea (north) Total of 450 MW Each farm max. 200 MW North Sea (south) Sejerøbugten Smålandsfarvandet Bornholm

New Offshore Wind Tenders in Denmark

Nearshore wind projects

The tendering model will be published this year Dialogue and negotiation Call for tenders September 2015 Pre-investigations: Geological, EIA and MetOcean Grid connection Local joint ownership

New Offshore Wind Tenders in Denmark

The Danish TSO - Energinet.dk

Independent public enterprise – owns and operates highways of energy (electricity and gas) Energinet.dk is to ensure security of supply Our finances must break even – non-profit We develop a more flexible power system

New Offshore Wind Tenders in Denmark

Roles of Energinet.dk in OWF

Finance, construct and operate platform and sea cable Bringing power from new OWF ashore and strengthen grid Secure that grid connection is available in due time During the last year requested by DEA to conduct pre investigations and EIA for future offshore wind farms

New Offshore Wind Tenders in Denmark

Investigations conducted until now

- Horns Rev 3 and Kriegers Flak UXO-deskstudy (Unexploded Ordnance on/below seabed) Geophysical investigations in wind farm areas Geotechnical tender EIA-surveys initiated

New Offshore Wind Tenders in Denmark

Horns Rev 3

App. 190 km 2 pre-investigation area

New Offshore Wind Tenders in Denmark

Horns Rev

3 project facts Distance to shore Distance to harbour Mean wind speed Water depth Seabottom Tide

10 – 30 km

25 – 55 km 9.8 m/s 10 – 20 m Sand Yes, 1 – 2 meter

New Offshore Wind Tenders in Denmark

Kriegers Flak

110 km 2

App. 250 km 2 pre-investigation area

69 km 2 Kriegers Flak

New Offshore Wind Tenders in Denmark

Kriegers Flak

project facts Distance to shore Distance to harbour Mean wind speed Water depth Seabottom Tide

15 km from Møn

20 – 40 km 9.5 m/s 15 – 30 m Sand and residual sediments (from moraine/till deposits) – risk of boulders No

New Offshore Wind Tenders in Denmark

Grid Connections

Energinet.dk establish the offshore platform, the sub-sea cable and the onshore grid connections The developer is responsible for inter-array cabling in the OWF and connecting to the platforms OWF will be connected to the platforms at 33 or 66kV Expenses of Energinet.dk is paid by Danish consumers; not the developer/owner of the OWF’s Construction of the platforms will be initiated in 2014 and finalized in 2016/2018

New Offshore Wind Tenders in Denmark

Upcoming events

Technical information meeting in Copenhagen

27th of February 2013

Kick-off meeting for the tendering process

May 2013

Follow updated information at

www.ens.dk/offshorewind

New Offshore Wind Tenders in Denmark You can find us at the Danish pavilion 1,450 MW before 2020