Transcript New Offshore Wind Tenders in Denmark
New Offshore Wind Tenders in Denmark New Offshore Wind Tenders in Denmark 1,450 MW before 2020
New Offshore Wind Tenders in Denmark
Presentation today
Lisbeth Nielsen Danish Energy Agency Peter Sehestedt Danish Energy Agency Tone Madsen Danish Energy Agency Betina Haugaard Heron Energinet.dk
Danish ambitions on future offshore wind power Two new offshore tenders: 400 MW at Horns Rev and 600 MW at Kriegers Flak Tender of 450 MW nearshore projects Pre-investigations and grid connection
New Offshore Wind Tenders in Denmark
Denmarks’ ambitious green energy policy
Ambitious green energy policy: long-term goal for 2050 – independence of fossil fuels Stable regulatory framework to 2020 Offshore wind broad political support – 95 % of the Danish Parliament Effects in 2020 50 percent of our electricity consumption from wind power
New Offshore Wind Tenders in Denmark
New Offshore Wind projects in Denmark
Horns Rev 3: 400 MW Kriegers Flak: 600 MW Tender for 450 MW near shore wind farms 50 MW turbines for research and development
New Offshore Wind Tenders in Denmark
Preparing for the future
New Offshore Wind Tenders in Denmark
The Danish offshore approach
A track record of political stability Planning and pre-investigations Predictable income DEA is one stop shop Grid connection – large scale and near shore No requirement for local content Transparent and flexible tender process
New Offshore Wind Tenders in Denmark
Integration of wind power
Strong interconnectors A well functioning international market for electricity Flexible electricity consumption
New Offshore Wind Tenders in Denmark
Horns Rev 3 and Kriegers Flak
The most attractive sites The sites chosen for tender ranked the highest in the economic ranking Horns Rev 3 Kriegers Flak
New Offshore Wind Tenders in Denmark
Horns Rev
3 400 MW in the North Sea Denmark's 14th offshore wind farm Local competences and network of suppliers North Sea has good wind conditions Sea depths of less than 20 metres
New Offshore Wind Tenders in Denmark
Kriegers Flak
600 MW in the Baltic Sea Denmark's largest offshore wind farm Located in the Baltic Sea close to borders of Sweden and Germany Will also be linked to the German farm - power can be led to both countries Good wind conditions
Kriegers Flak
New Offshore Wind Tenders in Denmark
We are transparent
Tendering for Horns Rev 3 and Kriegers Flak: Dialogue and negotiation
New Offshore Wind Tenders in Denmark
Common timeline
both projects
2013
February to April 2013 Pre-technical dialogue From May 2013 Technical dialogue
New Offshore Wind Tenders in Denmark
Horns Rev 3
timeline
2013 2014 2015 … 2020
New Offshore Wind Tenders in Denmark
Horns Rev 3
timeline
2013 2014 2015 … 2020
New Offshore Wind Tenders in Denmark
Kriegers Flak
timeline
2013 2014 2015 … 2020
September/October 2015 Concession contract and construction permit
New Offshore Wind Tenders in Denmark
Kriegers Flak
timeline
2013 2014 2015 … 2020
New Offshore Wind Tenders in Denmark
Nearshore wind projects
Sæby North Sea (north) Total of 450 MW Each farm max. 200 MW North Sea (south) Sejerøbugten Smålandsfarvandet Bornholm
New Offshore Wind Tenders in Denmark
Nearshore wind projects
The tendering model will be published this year Dialogue and negotiation Call for tenders September 2015 Pre-investigations: Geological, EIA and MetOcean Grid connection Local joint ownership
New Offshore Wind Tenders in Denmark
The Danish TSO - Energinet.dk
Independent public enterprise – owns and operates highways of energy (electricity and gas) Energinet.dk is to ensure security of supply Our finances must break even – non-profit We develop a more flexible power system
New Offshore Wind Tenders in Denmark
Roles of Energinet.dk in OWF
Finance, construct and operate platform and sea cable Bringing power from new OWF ashore and strengthen grid Secure that grid connection is available in due time During the last year requested by DEA to conduct pre investigations and EIA for future offshore wind farms
New Offshore Wind Tenders in Denmark
Investigations conducted until now
- Horns Rev 3 and Kriegers Flak UXO-deskstudy (Unexploded Ordnance on/below seabed) Geophysical investigations in wind farm areas Geotechnical tender EIA-surveys initiated
New Offshore Wind Tenders in Denmark
Horns Rev 3
App. 190 km 2 pre-investigation area
New Offshore Wind Tenders in Denmark
Horns Rev
3 project facts Distance to shore Distance to harbour Mean wind speed Water depth Seabottom Tide
10 – 30 km
25 – 55 km 9.8 m/s 10 – 20 m Sand Yes, 1 – 2 meter
New Offshore Wind Tenders in Denmark
Kriegers Flak
110 km 2
App. 250 km 2 pre-investigation area
69 km 2 Kriegers Flak
New Offshore Wind Tenders in Denmark
Kriegers Flak
project facts Distance to shore Distance to harbour Mean wind speed Water depth Seabottom Tide
15 km from Møn
20 – 40 km 9.5 m/s 15 – 30 m Sand and residual sediments (from moraine/till deposits) – risk of boulders No
New Offshore Wind Tenders in Denmark
Grid Connections
Energinet.dk establish the offshore platform, the sub-sea cable and the onshore grid connections The developer is responsible for inter-array cabling in the OWF and connecting to the platforms OWF will be connected to the platforms at 33 or 66kV Expenses of Energinet.dk is paid by Danish consumers; not the developer/owner of the OWF’s Construction of the platforms will be initiated in 2014 and finalized in 2016/2018
New Offshore Wind Tenders in Denmark
Upcoming events
Technical information meeting in Copenhagen
27th of February 2013
Kick-off meeting for the tendering process
May 2013
Follow updated information at
www.ens.dk/offshorewind
New Offshore Wind Tenders in Denmark You can find us at the Danish pavilion 1,450 MW before 2020