CITY OF NEW BERLIN
SECTION 35
Neighborhoods G & H
Comprehensive Plan
Amendment
Public Input
January 2012
CURRENT ADOPTED LAND USE PLAN
•
Business Park Light Industrial (purple) –
Commercial, Office, Retail
•
Planned Conservation Development (Light Tan) Single Family Residential
Adopted Development Policies –
Neighborhood “G” (Source: NB 2020 Comprehensive Plan)
• Allow additional business office uses east of Moorland
Road to respond to the growing interest in New Berlin;
• Pursue extension of sewer and water into Section 35;
• Encourage lot clustering to preserve the natural features
and character;
• Single family housing is recommended along Grange
Avenue and the eastern portion of Neighborhood “G”;
• Business park designation has been expanded in
response to a growing Westridge Business Park,
requests by property owners, and for the long-term
financial success of the City (potential new value of
$150 + million);
• This area should also include commercial retail as it
supports the business park and City
PROPOSED FUTURE LAND USE AMENDMENTS
PROPOSED FUTURE LAND USE AMENDMENTS
FUTURE LAND USE CHANGES ARE BASED
UPON:
• Topography
• Ability to coordinate access points
• Maintaining buffers to existing development
to the east of Sunnyslope Road, north of
Grange Ave. and along College Ave.
• Environmental features / Gas Line
• Utility layout
TRAFFIC - EXISTING
TRAFFIC ANALYSIS –2008 to 2020 traffic
WITHOUT new development
Add
Signal
2-Lanes
Lengthen
turning
lanes
2-Lanes
Add
4-Lanes
turning
lanes
2-Lanes
TRAFFIC ANALYSIS – WITH new development
2-Lanes
Add
Turn
Lanes
Add Turn Lanes
2-Lanes
4-6 Lanes
2-Lanes
Add
Turn
Lanes
TRAFFIC ANALYSIS – Comparison Chart
6-Lane
4-Lane
INTERCEPTOR ANALYSIS
Sewer & Water Main in Sec. 34 and 35
The City and MMSD have already amended the City’s Current Sewer Service and Urban Service Areas allowing
for the utilities to be brought into this area.
The project is broken out into two phases and generally consists of an extension of the 36 inch interceptor
sewer and a 16 inch water transmission main.
Phase 1 -2012, located primarily within Section 34, includes the installation of:
•
•
•
•
•
2,550 linear feet of 36 inch interceptor sewer within a 60-foot wide permanent easement;
2,550 linear feet of 16 inch water transmission main within the 60-foot wide permanent easement;
2,000 linear feet of 18 inch local gravity sewer within the Moorland Road right of way;
2,350 linear feet of water main within the Moorland Road right of way;
Abandonment of the Moorland Road Lift Station once Contract 2-2012 is completed.
Phase 2 -2012, located primarily within Section 35, contains includes the installation of:
•
•
•
•
6,000 linear feet of 36 inch interceptor sewer within a 60-foot wide permanent easement;
6,000 linear feet of 16 inch water transmission main within the 60-foot wide permanent easement;
500 linear feet of 36 inch interceptor sewer within the Sunnyslope Road right of way; and
200 linear feet of trenchless construction across Tess Corners Creek.
INTERCEPTOR ANALYSIS
Sewer & Water Main in Sec. 34 and 35
PROPOSED AMENDMENTS
•
Additional acreage designated for
business/light industrial uses
•
Reducing the acreage designated for singlefamily residential (planned conservation
development)
•
Any other concepts or ideas discussed during
the focus group sessions.
Upcoming Meetings
•
•
•
•
•
•
•
Neighborhood 1 – Tonight
Neighborhood 2 – Thursday, January 19
Neighborhood 3 – Monday, January 23
Neighborhood 4 – Wednesday, January 25
Open House – tba
Public Hearing / Plan Commission Action – tba
Common Council Action – tba
All meetings held at New Berlin City Hall –
Common Council Chambers – 6:00 p.m.
• DCD Staff available M-F from 8:00 a.m. to 4:30 p.m.
• Follow or “Like” the City’s Department of Community
Development on Facebook, LindedIn and/or Twitter for
news and updates.
PUBLIC COMMENTS