Transcript Document
Kick-Off Meeting February 18, 2009 ST - Crolles - France Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 1 • • • • • Agenda - 18 February 2009 9:00 Welcome, individual presentations, coffee 9:30 Key figures of the project 10:15 Project Organization/Management 11:00Coffee break 11:15WP Key figures, organization of technical work, preparation of milestones and deliverables WP leaders – – – – – • • • • • • 11:15 11:45 12:15 12:45 13:15 13:30 14:30 15:00 15:15 15:45 16:00 + 16:00-18:00 + 20:00 WP1 WP2 WP3 WP4 WP5 PC PC Giuliana Gangemi Andre Juge Paul Van de Wiel Davide Pandini Loris Vendrame Lunch Status of negotiations in each country Website demo, choice of Logo and site Content Partner Consortium Agreement (incl. IPR Mngt) Conclusions and next meetings End all all PC all Room Les Vans for ENIAC Call2 (contact Enrico Macii) Social Dinner (contact JPS) Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 2 Message from MunEDA received on Februrary 13, 2009 Dear Jean-Pierre, Dear MODERN project partners, This is to inform you that MunEDA unfortunately will not take part in the MODERN project. This is due to the reason that there is no funding situation supported in Germany and therefore also the EU-JU funding is not possible to achieve. We are very sorry about this because the MODERN project ideally fits into our own R&D strategy also in cooperation with the project partners. Nevertheless we further will bring in our engagement into the other ongoing project initiatives and also on bilateral basis with our industry and academic partners. Especially I want to thank Jean-Pierre Schoellkopf and the WP-leaders for his/their enormous efforts to bring this large project up and running. We wish the MODERN project a good run and large success! Hear you soon again. Best regards. Andreas Ripp and the MunEDA team. Need to change the Technical Annex, especially WP3: -52 PM ! Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 3 Key Figures of MODERN Project Coordinator Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 4 country France DK name type ST-F Big C IMEP Small L STF2 Big C LETI Big L LIRM Small L THL Big C TMPO Small C TEKL Small C AMS Big C IFXA Big C TUGI Small L TUW Small L UNET Big L NMX Big C POLI Big L ST-I Big C UNBO Small L UNCA Small L UNRM Small L ELX Small C UPC Small L CSEM Big L SNPS Small C ISD Small C NXP Big C TUD Small L TUE Small L UNGL Big L Austria Italy Spain CH Greece NL UK Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 5 MODERN: Key Figures • 28 partners: (updated after MunEDA exit) – 26 companies/institutions – MunEDA is finally OUT • 9 countries: – Germany is now totally OUT • Cost figures: – – – – Total cost: Total JU funding (16%): Total NAT funding (29%): Total funding (45%): 26 599 130 € (26.6M€) 4 257 687 € 7 732 107 € 11 989 794 € (12M€) • Effort figures: – Total Person.Month – Total Person.Year 2 418.5 over 3 years 201.5 over 3 years 67 persons working full time on MODERN during 3 years ! Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 6 Cost breakdown by Country total cost Italian Cluster 4% 3% 2% 6% 1% German Cluster 25% French Cluster Austrian Cluster Dutch Cluster 0% 26% Spanish Cluster Greek Cluster Swiss Cluster 23% British Cluster 10% Danish Cluster Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 7 Resource Breakdown by Institution type 400.00 350.00 300.00 Total Big C 250.00 Total Big Labs 200.00 Total Small C 150.00 Total Small Labs 100.00 50.00 0.00 WP1 WP2 WP3 WP4 WP5 Kick Off meeting, Room Belledonne ST Crolles WP6 08/07/2015 8 Ressource Breakdown by WP Grand Total PM 800.00 700.00 600.00 500.00 400.00 Grand Total PM 300.00 200.00 100.00 0.00 WP1 WP2 WP3 WP4 WP5 Kick Off meeting, Room Belledonne ST Crolles WP6 08/07/2015 9 Project Organization and Management Project Coordinator Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 10 Global Organization External reviewers TBD Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 11 MODERN Organization (1/3) Coordinator (= General Project Coordinator) Modern • The GPC is responsible for the following tasks: – Interface to the European Commission and ENIAC • Negotiate the funding budget • Preparation and submitting data to ENIAC or EC – – – – – Preparation of Reviews and Project meetings (SB/PCC, EB/PTC) Chairing of SB/PCC (and also EB/PTC ?) Negotiate on contract, budget, Consortium Agreement, LOI Representation of the Consortium Management of the Consortium in the wide sense on a continuous basis • • • • • Monitor project progress and workload consumption, anticipate corrective actions when/if necessary, resolve conflicts within the Consortium as earlier as possible, serve as project secretary and archive, collect the partner’s financial statements and audit certificates. Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 12 MODERN Organization (1/3) Coordinator (= General Project Coordinator) Improve • Main tasks will be related to the following activities, aiming at ensuring efficient project organization towards ENIAC Joint Undertaking requirements and enhancing communication within the consortium: – – – – – – – – technical monitoring, meetings organization, financial flows, reporting, official communication, consortium management, contracts management, internal quality policy Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 13 MODERN Organization (2/3) Strategic Board (= Project Coordination Committee) • • • • • SB is composed of – seniors representatives of all the industrial partners – one representative of the Solutions Providers – one representative of the Universities. SB is in charge of the overall direction and major decisions SB is responsible for the approval of the following items to be proposed by the Executive Committee EB: – Consortium: actions against a defaulting partner, integration of new partners… – Budgets allocation and questions related to the ENIAC Grant agreement. – Contractual: changes to the ENIAC Grant agreement or the Project Agreement – Technical: major changes in work, project orientations – IPR and dissemination: approving procedures and policies for the management of the Knowledge; SB will meet at least on a six-monthly basis – Plus two-monthly intermediary internet forums/phone conferences Each consortium member will receive equal voting rights: – During SB meetings, all decisions should be taken by vote under 2/3rd majority. Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 14 Members of the Strategic Board name type Strategic Board member ST-F Big C Jean-Francois Hugues (chairman) LETI Big L Jean-Rene Lequepeys THL Big C Philippe Bonnot TMPO Small C Marc Renaudin AMS Big C Ehrenfried Seebacher IFXA Big C Michael Fulde UNET Big L Enrico Sangiorgi NMX Big C Andrea Marmiroli POLI Big L Enrico Macii ST-I Big C Salvatore Rinaudo SNPS Small C Ronald Gull NXP Big C UNGL Big L Name tbd (Paul Van de Wiel) Asen Asenov Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 15 MODERN Organization (3/3) Executive Board (= Project Technical Committee) • EB is composed of the WP Leaders plus the GPC • EB is chaired by GPC or one WP leader (to be defined ???) • EB is responsible for the monitoring of the project progress and the preparation, review and updating of the detailed work-plan. • The decisions will be taken by consensus or by a double majority in the case where consensus is not possible. • Each member of the EB will have one vote. • Changes to the work-plan will require consensus or a double majority. • EB will meet every 2 months. • The voting procedure as well as the responsibilities of the EB will be laid down in the Project Consortium Agreement (PCA) Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 16 Work Package Leaders are members of the Executive Board Partner WP Leader Name WP1 ST-I [email protected] WP2 STF2 [email protected] WP3 NXP [email protected] WP4 ST-I [email protected] WP5 NMX [email protected] WP6 ST-F [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 17 All Tasks have one Task Leader Task Leaders are « reporting to » the WP leader Partner Task Leader Name T2.1 ST-I [email protected] T2.2 UNGL [email protected] T2.3 NXP [email protected] T2.4 AMS [email protected] T2.5 UNET [email protected] T3.1 TUD [email protected] T3.2 UNBO [email protected] T3.3 POLI [email protected] T3.4 NXP [email protected] T4.1 LETI [email protected] T4.2 ELX [email protected] T4.3 ISD [email protected] T4.4 ST-I [email protected] T4.5 THL [email protected] T5.1 AMS [email protected] T5.2 IFXA [email protected] T5.3 SNPS [email protected] T6.1 ST-F [email protected] T6.2 UNET [email protected] T6.3 ST-F [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 18 Work Packages Key Figures Project Coordinator Introducing WP leaders Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 19 WP1: leader [email protected] Leader Leader Start Problem Definition 19 ST-I M01 M03 [email protected] T1.2 Technology Definition 19 ST-I M01 M03 [email protected] T1.3 Feasibility Study 19 ST-I M01 M06 [email protected] T1.4 Definition of Tool Specifications 19 ST-I M06 M09 [email protected] T1.5 Specification of Tool demonstration and validation 19 ST-I M06 M12 [email protected] T1.6 Documentation and user guides 19 ST-I M24 M33 [email protected] T1.7 Integration Plan 19 ST-I M12 M18 Task Task title T1.1 End Task Leader [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 20 WP1 total resources: 69.6 PM Work package number WP1 Work package title Target technologies, application domains, design/tool requirements Participant number Participant short name Person-months per participant Start date or starting event: M1 1 2 6 15 16 19 21 ST-F AMS IFXA NMX NXP ST-I THL 12 4.8 4.8 6 6 30 6 Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 21 WP2: leader [email protected] Task. Task title Leader Leader Start End Task Leader T2.1 PV-aware process simulation 19 ST-I M01 M33 [email protected] T2.2 PV-aware device simulation 29 UNGL M01 M36 [email protected] T2.3 Electrical characterization of PV, software (TCAD) / hardware comparison & calibration 16 NXP M01 M36 [email protected] T2.4 Correlation between PV and reliability, reliability modeling 2 AMS M01 M36 T2.5 PV-aware compact modelling 11 UNET M01 M36 [email protected] [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 22 WP2 total resources: 638.6 PM Work package number WP2 Work package title Process/device to compact modeling Participant number Start date or starting event: M1 2 8 9 11 12 15 16 Participant short name AMS IMEP STF2 UNET LETI NMX NXP Person-months per participant 19.2 54 84 60 24 42 48 Participant number 18 19 20 26 28 29 POLI ST-I SNPS TUW UNCA UNGL 18 48 23 32.4 12 174 Participant short name Person-months per participant Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 23 WP3: leader [email protected] Task. Task title Leader Leader Start T3.1 End Task Leader PV-aware circuit models 23 TUD M01 M36 [email protected] T3.2 Methodologies, tools and flows for manufacturability, testability, reliability and yield 27 UNBO M01 M36 [email protected] T3.3 PV-aware design 18 POLI M01 M36 [email protected] T3.4 Design for low noise and EMI/EMC 16 NXP M01 M36 [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 24 WP3 total resources: 742.2 PM Work package number WP3 Work package title Physical/circuit to RT-level: PV-aware and PV-robust modeling and design Participant number Start date or starting event: M1 3 6 12 13 14 15 16 CSEM IFXA LETI LIRM MUN NMX NXP Person-months per participant 44 36 13.2 24 51.9 18 222 Participant number 18 19 23 24 29 27 28 POLI ST-I TUD TUE UNGL UNBO UNCA Person-months per participant 60 102 108 18 12 Participant number 30 31 UNRM UPC 27 20 Participant short name Participant short name Participant short name Person-months per participant Kick Off meeting, Room Belledonne ST Crolles 23 15 08/07/2015 25 Impact of MunEDA exit on T3.2 ? Task T3.2: Methodologies, tools and flows for manufacturability, testability, reliability and yield (Task Leader = [email protected]) The models that will be developed in task 3.1 need to predict accurately the impact of process variation. To compensate for process variation during circuit design the PV-aware circuit models need to be used in new methods for circuit design and future design tools and flows. Partners: UNBO, MUN, NMX, NXP, ST-I, UNCA, UNGL, UNRM In this task the development and application is performed of non-normal distributions and non-linear correlations in a statistical static timing analysis and multi-objective optimization flow for improved yield and reliability prediction that helps in determining the impact of process variations and doping fluctuations on performance. MUN will analyse standardized process development kits (pdk). ST-I and UNRM will work on a speed-up algorithm for PVaware circuit optimization. The before mentioned work of MUN, ST-I and UNRM will be combined to develop/improve an integrated standardized PV-aware high-speed design platform adding behaviour models for circuit sizing. UNBO and UNCA will analyze new circuit design techniques and these will be applied for industrial applications to enhance new methods of improving parametric design performance and yield. A PV-aware circuit simulation tool is developed by UNGL, which may serve as reference for newly developed faster flows. NXP will analyse a statistical timing flow based on reduced parameter lib cell models and measurement results from WP5 will serve as reference for the tool and flow validation. NMX will implement and use the PV methodologies and models from WP2 for logic devices and NVM memory array optimization. Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 26 WP4: leader [email protected] Task. Task title Leader Leader Start T4.1 End Task Leader Variability-aware design 12 LETI M01 M36 [email protected] T4.2 Variation-tolerant, robust, low-noise and low-EMI architectures/microarchitectures 4 ELX M01 M36 [email protected] T4.3 Design of reliable systems 10 ISD M01 M36 [email protected] T4.4 Design of regular architectures and circuits for high manufacturability and yield 19 ST-I M01 M36 [email protected] T4.5 Distributed reconfigurable PVrobust architectures 21 THL M01 M36 [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 27 WP4 total resources: 554.6 PM Work package number WP4 Work package title Architectural to system level: modeling, analysis and design Participant number Start date or starting event: M1 1 3 4 10 12 13 15 ST-F CSEM ELX ISD LETI LIRM NMX Person-months per participant 18 24 36 78 36 30 30 Participant number 18 19 21 22 27 31 5 POLI ST-I THL TMPO UNBO UPC TEKL 36 72 60 57.6 23 42 12 Participant short name Participant short name Person-months per participant Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 28 WP5: leader [email protected] Task. Task title Leader Leader Start End Task Leader T5.1 Test structures for PV analysis: design, implementation and characterization 2 AMS M01 M33 ehrenfried.seebacher@austriamicrosyst ems.com T5.2 Demonstrator: design, implementation and characterization 6 IFXA M01 M36 [email protected] T5.3 Software demonstrator and tool prototype 20 SNPS M01 M36 [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 29 WP5 total resources: 292.3 PM WP5 Start date or starting event: M1 Work package number Work package title Participant number Test structures and demonstrators 1 2 6 12 15 16 19 ST-F AMS IFXA LETI NMX NXP ST-I Person-months per participant 18 14.4 63 19.2 6 54 24 Participant number 20 21 22 25 31 SNPS THL TMPO TUGI UPC 10 18 12 37.7 16 Participant short name Participant short name Person-months per participant Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 30 WP6: leader [email protected] Task. Task title Leader Leader Start T6.1 End Tasl Leader Management 1 ST-F M01 M36 [email protected] T6.2 Dissemination 11 UNET M01 M36 [email protected] T6.3 Exploitation 1 ST-F M01 M36 [email protected] Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 31 WP6 total resources: 123.3 PM Work package number WP6 Work package title Project Management, Dissemination and Exploitation Participant number Start date or starting event: M1 1 2 3 4 6 8 10 ST-F AMS CSEM ELX IFXA IMEP ISD Person-months per participant 18 4.8 5 6 4.8 2.4 6 Participant number 11 12 13 14 15 16 18 UNET LETI LIRM MUN NMX NXP POLI Person-months per participant 6 2.4 2.4 2.1 6 12 6 Participant number 19 20 21 22 27 28 30 ST-I SNPS THL TMPO UNBO UNCA UNRM Person-months per participant 12 3 6 2.4 4 3 3 Participant number 31 Participant short name Participant short name Participant short name Participant short name Person-months per participant UPC 6 Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 32 Status of Negotiations in each country Project Coordinator (from inputs of the Project Officer Received on Feb. 17 at 6PM) Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 33 Message from the Project Officer (Michel Hordies) • • Dear Jean-Pierre, • good to see that the project is entering in its active phase. • • • • • Your questions: … • I wish you a very successful meeting. Please give my best wishes for a successful project to all the partners. • • • • • • Here is a status of the remaining issues to be cleared asap: … Best regards, Michel • Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 34 (1) negotiations • the negotiation of the project is terminated since December. • At national level, there are no further negotiations but only the establishment of national grant agreements (NGA) for which the PAs might need some additional information such as cost eligibility issues. This is important to pass on to the partners. • The French NGAs are all signed. • The other countries are all working on their NGAs and we expect most of them to be ready later this month. • In Italy, the delay might be longer but we are working on a potential solution for that. Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 35 (2) JU agreement • It is almost ready. We are collecting the last missing bank information from the partners. Please remind those concerned that they should send the requested e-mail confirming the address registered with their bank. • I hope we can submit the JU GA for your signature by the end of the month at the latest. • The partners will then be able to acceed to the JU GA once their NGA is signed. See below for detailed status report. Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 36 (3) Starting Date • I thought we had agreed on a starting date of 1 January. • The starting date for the project can be retroactive. If the project did not start, then I assume the starting date could be 1 Feb. • If you make it later, the costs of the kick-off meeting might not be eligible. • I need this information to be put in the JU GA. Starting Date = Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 37 status of remaining issues to be cleared asap (1/2) • Legal validation: – ELASTIC CLOCKS S.L. needs to provide a recent excerpt of Trade Register containing "HOJA" number ( Spanish word for identification number). • Bank accounts: – – – – – 1 ST-France 9 STF2 (CROLLES) 20 SNPS 26 TU WIEN need to provide e-mail to « [email protected] » with the following text: " concerning the registration of our bank account to the European commission, I confirm that my company XXXX (name) has registered its address : … (address) at the bank YYYY (name + address) and ask to be paid on this IBAN number ZZZZZ for its participation to the ENIAC project AAAA." • GPF's : – original signed GPF A24 & A25 from coordinator + original signed A24 from all participants – except 13 LIRM, 19 STItaly, 22 TMPO, 28 UNICAL. Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 38 status of remaining issues to be cleared asap (2/2) • National Grant Agreements: to be sent by all participants except FRANCE • Budget: When changes appear in the contract vs. negotiation, the technical annex needs to be modified accordingly. Budget tables must comply with PAB decisions and National Grants Agreements need to be in line with any redistribution of funds. • Discrepancies identified in the figures: – 1 ST-France : the national GA funding in the DOW is different from the amount mentioned in the PAB decision and GPF A3.2 – 2 AMS AG: the JU funding in the DOW is different from the amount mentioned in the PAB decision and GPF A3.2 – 21 THL: the national GA funding in the GPF A3.2 is different from the amount mentioned in the DOW and in the PAB decision – 31 UPC: The national GA funding and the JU funding in the GPF A3.2 are different from the figures mentioned in the DOW and in the PAB decision Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 39 Website demo Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 40 PCA Project Consortium Agreement Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 41 Project Consortium Agreement • Legal agreement about Governance and IPRights • Templates: – – – – FP6 FP7 Artemis ENIAC-IMPROVE • We will rely on « ENIAC-IMPROVE » when it will be mature enough Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 42 Milestones Deliverables Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 43 Del. no. Deliverable name D6.1.01 Internal project website D6.1.02 WP . N Diss Date Contrib Title 6 P CO M01 ST-F Internal project website IPR management guidelines 6 R CO M01 ST-F IPR management guidelines D6.2.1 Public part of project web-site 6 D PU M01 ST-I Public part of project web-site D6.2.2 Press release at the start of the project 6 R PU M03 ST-I Press release at the start of the project D1.1 Definitions of problems and technologies, Specifications for tools, methods and design techniques 1 R PP M06 ST-I ST-F AMS IFXA NMX NXP THL T1.1 Problem Definition, Definition of Technologies, Define a list of tools, D2.2.1 Assessment of state-of-the-art TCAD methodology and usability concerning PV for industrial purposes including identification of current deficiencies of tools 2 R CO M06 UNGL Assessment of state-of-the-art TCAD methodology and usability concerning PV for industrial purposes including identification of current deficiencies of tools D2.4.1 Specification of considered degradation effects, modeling approaches and device parameters 2 R CO M06 UNGL, TUW Specification of considered degradation effects, modeling approaches and device parameters D6.1.03 Risk management plan 6 R CO M06 ST-F Risk management plan D6.1.04 Semi-annual project progress report 6 R CO M06 ST-F, all Semi-annual project progress report methods and design techniques (produce one or more documents)T1.2 Specifications for each tool, method and design techniques to be developed in WP2/3/4.(produce one or more documents) Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 44 Milestones up to M12 Milestone number Milestone name Work package(s) involved Expected date Means of verification M6.1 First project review by ENIAC all M08 Reviewer’s feedback M5.1 Identification of sw tools to be interfaced 2, 5 M09 Status activities on WP2 M4.1 PV-tolerant asynchronous/de-synchronized, ultra low-power, robust functional blocks, and SystemC models 4 M10 D4.2.1 M4.2 Prototype asynchronous/de-synchronization flow 4 M10 D4.2.1 M1.1 Problem Definition and Tests 1,2,3,4 M12 D 1.1, D1.2 M3.1 Abstract Models CMOS and AMS&RF 3 M12 Abstract models for CMOS cell libraries reported and verified M3.3 PV aware circuit simulation techniques 3 M12 PV aware circuit simulation techniques working and verified M3.5 M&C strategies for digital and AMS&RF 3 M12 M&C strategies for digital and AMS&RF developed and verified M3.7 RF interaction models 3 M12 RF interaction models developed M5.2 New test structure definition 5 M12 D5.1.1 M5.3 Demonstrators/test chips detailed content and technology definition 2, 3, 4, 5 M12 Intermediate results from WP 2,3,4 D4.3.1 Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 45 Conclusions Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 46 Next SB and EB meetings • Date: end of June, 2009 • Location: ST – Crolles - France Kick Off meeting, Room Belledonne ST Crolles 08/07/2015 47