Transcript Slide 1
Review meeting on different RD Schemes under Chairmanship of Hon’ble Minister, RD Deptt Date : 11th May, 2012 Time : 10.30 A.M. Venue : Conference Hall - II, Civil Secretariat, Agartala Status of release of Central funds under MGNREGA during 2011-12 FY Rs. in lakh District North Dhalai West South Sepahijal a Khowai Gomati Unakoti 2 Total Central Approve Liability d Labour (96% of budget Approved 2011-12 Labour budget) Last year Central release to be utilized current yr. Total release of Central share % of CS received Total release of State share % of SS received District wise performance under MGNREGA upto March, 2012 Expenditure (Rs.in lakh) Dist North Dhalai West South Sepahijala Khowai Gomati Unakoti Total 3 Total fund received Target as per LB Actual Exp % of Actual Exp. In term of fund received Exp as per MIS Mandays generated (in lakhs) % of uploading in MIS Target as per LB Actual Mandays generated PD as per MIS % of uploadi ng in MIS District wise demand and employment provided upto March, 2012 Dist North Dhalai West South Sepahijala Khowai Gomati Unakoti Total 4 Mandays Generation Total No. of Job No. of Job Average Mandays No. of card Holders Card Holders Target MD Generated Job Card Demanded Provided as per (No. in Lakhs) Holders Employment Employment LB Actual As per Taget as Actual As per MIS per LB MIS District wise comparative analysis on MGNREGA performance during 2011-12 FY Name of Blocks achieving District West Sepahijala Khowai Gomati South Dhalai Unakoti North 5 50-60 PDs 61-70 PDs 71 - 80 PDs 81-90 PDs 91-100 PDs District wise asset created under MGNREGA upto March, 2012 District Water harvesting (in nos. & ha) No. North Dhalai West South Sepahijala Khowai Gomati Unakoti Total 6 Ha. Formation of road (in nos. & km) No. Km Bricks soling road (in nos. & km) No. Km. Culvert (in nos.) Irrigation facilities (in ha) Extension of irrigation channel (in km) No. Ha. Km (Agri/ Horti/ For) (In ha) Ha. Dist North Dhalai West South Sepahijala Khowai Gomati Unakoti 7 Others Rural connectivity Flood Control & protection Land Dev. Renovation of traditional water bodies Provision of irrigation facility to SC/ST land Micro irrigation works Drought Proofing Water Conservation & harvesting Sector wise percentage (%) of expenditure during 2011-12 (upto March, 2012) Percentage of Expenditure Bharat Nirman Rajiv Gandhi Sewa Kendra – Progress upto March, 2012 District Total No. of No. of GPs/ADC Villages where GP/ADC BNRGSK taken up for construction Village 10-11 11-12 Taken up Comp Taken up Comp North Dhalai West South Sepahijala Khowai Gomati Unakoti Total 8 No. of No. of Blocks where BNRGSK Blocks taken up for construction 10-11 11-12 Taken Taken Comp Comp up up Convergence of MGNREGA with different line departments – Financial and physical achievement on implementation of projects under MGNREGA fund during the year 2011-12 upto March, 2012 Dist Fund (Rs.in lakh) Requirement Fund placed Actual Exp % of exp North Unutilized fund Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated 9 Agri Horti Fishery Seri. Forest ARDD ADC Other Total Convergence of MGNREGA with different line departments – Financial and physical achievement on implementation of projects under MGNREGA fund during the year 2011-12 upto March, 2012 Dist Fund (Rs.in lakh) Requirement Fund placed Actual Exp % of exp Unakoti Unutilized fund Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated 10 Agri Horti Fishery Seri. Forest ARDD ADC Other Total Convergence of MGNREGA with different line departments – Financial and physical achievement on implementation of projects under MGNREGA fund during the year 2011-12 upto March, 2012 Dist Fund (` In Lakhs) Requirement Fund placed Actual Exp % of exp Unutilized fund Dhalai Exp. Uploaded in MIS Amt. Pending for MIS entry No. of Mandays generated 11 Agri Horti Fishery Sericul Forest ARDD ture ADC Others Total Convergence of MGNREGA with different line departments – Financial and physical achievement on implementation of projects under MGNREGA fund during the year 2011-12 upto March, 2012 Particulars Dist Requirement Fund placed Actual Exp West % of Exp. Unutilized fund Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated 12 Agri Horti Fishery Seri culture Forest ARDD ADC Others Total Convergence of MGNREGA with different line departments – Financial and physical achievement on implementation of projects under MGNREGA fund during the year 2011-12 upto March, 2012 Dist Fund (Rs.in lakh) Requirement Fund placed Actual Exp % of exp Sepah Unutilized fund ijala Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated 13 Agri Horti Fishery Seri. Forest ARDD ADC Other Total Convergence of MGNREGA with different line departments – Financial and physical achievement on implementation of projects under MGNREGA fund during the year 2011-12 upto March, 2012 Dist Fund (Rs.in lakh) Requirement Fund placed Actual Exp % of exp Khowai Unutilized fund Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated 14 Agri Horti Fishery Seri. Forest ARDD ADC Other Total Convergence of MGNREGA with different line departments – Financial and physical achievement during FY 2011-12 upto March, 2012 Dist. Fund [In Lakhs) Requirement Fund placed Actual Exp % of exp South Unutilized fund Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated 15 Agri Horti Fishery Sericulture Forest ARDD ADC Others Total Convergence of MGNREGA with different line departments – Financial and physical achievement on implementation of projects under MGNREGA fund during the year 2011-12 upto March, 2012 Dist Fund (Rs.in lakh) Requirement Fund placed Actual Exp % of exp Gomati Unutilized fund Exp. Uploaded in MIS Amt. Pending for MIS entry No. of MD generated 16 Agri Horti Fishery Seri. Forest ARDD ADC Other Total Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB North SBI UBI Total 17 No. of No. GP/VCs GP/ADC to be villages covered covered Total No. of Registered Job card holders No. of No. of villages Total No. Total No. Smart where of of Smart cards payment Enrolment card distribut started through completed issued ed BC Model Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB Unakoti SBI UBI Total 18 No. of No. GP/VCs GP/ADC to be villages covered covered Total No. of Registered Job card holders No. of No. of villages Total No. Total No. Smart where of of Smart cards payment Enrolment card distribut started through completed issued ed BC Model Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB Dhalai SBI UBI Total 19 Total No. No. of No. Total No. Total No. of GP/VCs GP/ADC of of Smart Registere to be villages Enrolment card d Job card covered covered completed issued holders No. of Smart cards distributed No. of villages where payment started through BC Model Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB West SBI UBI Total 20 Total No. No. of No. Total No. Total No. of GP/VCs GP/ADC of of Smart Registere to be villages Enrolment card d Job card covered covered completed issued holders Total No. of Smart cards distributed No. of villages where payment started through BC Model Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB Sepah ijala SBI UBI Total 21 No. of No. GP/VCs GP/ADC to be villages covered covered Total No. of Registered Job card holders No. of No. of villages Total No. Total No. Smart where of of Smart cards payment Enrolment card distribut started through completed issued ed BC Model Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB Khowai SBI UBI Total 22 No. of No. GP/VCs GP/ADC to be villages covered covered Total No. of Registered Job card holders No. of No. of villages Total No. Total No. Smart where of of Smart cards payment Enrolment card distribut started through completed issued ed BC Model Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB South SBI UBI Total 23 Total No. No. of No. of GP/VCs GP/ADC Registered to be villages Job card covered covered holders No. of villages Total No. Total No. No. of where of of Smart Smart payment Enrolment card cards started completed issued distributed through BC Model Status of coverage of payment of wages under BC Model upto March, 2012 Dist Bank TGB TSCB Gomati SBI UBI Total 24 No. of No. GP/VCs GP/ADC to be villages covered covered Total No. of Registered Job card holders No. of No. of villages Total No. Total No. Smart where of of Smart cards payment Enrolment card distribut started through completed issued ed BC Model Inspection of MGNREGA works District North Dhalai West South Sepahijala Khowai Gomati Unakoti 25 Whether No. of Block No. of works inspected district level level officers inspectio engaged for n report Block Level official DT level officials inspection of % of % of submitted MGNREGA inspection inspection to R.D. works Deptt? Target Achvmnt Target Achvmnt (Y/N) Wage - Material Ratio as per MIS Dist. North Dhalai West South Sepahijala Khowai Gomati Unakoti 26 Total Fund Total Expenditure available upto March, 2012 Expenditure on wages Expenditure on Materials & others Wage - Material ratio of Exp V&MC Meetings District Dhalai South West North Sepahijala Khowai Gomati Unakoti 27 Target No of Whether meetings held with Uploaded in MIS? date Status of Submission for 2nd installment Status of Social Audit by Gram Sabha & Madhya Bharat Chapter Total Social Audit held Status of release of By Madhya By Madhya funds to Gram Bharat Bharat Sabha MBC Chapter Chapter Target District North Dhalai West South Sepahijala Khowai Gomati Unakoti 28 Gram Sabha Shortcomings if any District wise status of procurement of IT hardware and connectivity District Dhalai 29 Total IT hardware procured so far Addl requirement if any Connectivity Remarks status District wise status of procurement of IT hardware and connectivity District West 30 Total IT hardware procured so far Addl requirement Connectivity if any status Remarks District wise status of procurement of IT hardware and connectivity District Sepahijala 31 Total IT hardware procured so far Addl requirement Connectivity if any status Remarks District wise status of procurement of IT hardware and connectivity District Khowai 32 Total IT hardware procured so far Addl requirement Connectivity if any status Remarks District wise status of procurement of IT hardware and connectivity District South 33 Total IT hardware procured so far Addl requirement if any Connectivity status Status of kiosk installation District wise status of procurement of IT hardware and connectivity District Gomati 34 Total IT hardware procured so far Addl requirement Connectivity if any status Remarks District wise status of procurement of IT hardware and connectivity Distric t North 35 Total IT hardware procured so far Addl Connectivi Remarks requirement if ty status any District wise status of procurement of IT hardware and connectivity District Unakoti 36 Total IT hardware procured so far Addl requirement Connectivity if any status Remarks Miscellaneous Reply on Audit observation on use of earth excavating machines in MGNREGA works Comments on proposed Operational guidelines on MGNREGA Strategy on operationalising Zilla Parishads in newly created districts District wise list of unconnected hamlets having more than 250 population District West Sepahijala Khowai Gomati South Dhalai Unakoti North 37 No of unconnected hamlets having > 250 population Miscellaneous issues District Issue Comprehensive list of roads for all unconnected hamlets and status of empowered committee meeting for finalization of the roads Status of release of funds to SoSSMBC for Social Audit Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness workshop for all technical staff by DMs. Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 38 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. West Status Remarks Miscellaneous issues District Issue Comprehensive list of roads for all unconnected hamlets and status of empowered committee meeting for finalization of the roads Status of release of funds to SoSSMBC for Social Audit Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness workshop for all technical staff by DMs. Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 39 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. Sepahijala Status Remarks Miscellaneous issues District Issue Comprehensive list of roads for all unconnected hamlets and status of empowered committee meeting for finalization of the roads Status of release of funds to SoSSMBC for Social Audit Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness workshop for all technical staff by DMs. Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 40 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. Khowai Status Remarks Miscellaneous issues District Issue Comprehensive list of roads for all unconnected hamlets and status of empowered committee meeting for finalization of the roads Status of release of funds to SoSSMBC for Social Audit Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness workshop for all technical staff by DMs. Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 41 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. North Status Remarks Miscellaneous issues District Issue Comprehensive list of roads for all unconnected hamlets and status of empowered committee meeting for finalization of the roads Status of release of funds to SoSSMBC for Social Audit Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness workshop for all technical staff by DMs. Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 42 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. Unakoti Status Remarks Miscellaneous issues District Issue Comprehensive list of roads for all unconnected hamlets and status of empowered committee meeting for finalization of the roads Status of release of funds to SoSSMBC for Social Audit Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness workshop for all technical staff by DMs. Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 43 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. Gomati Status Remarks Miscellaneous issues District Issue Comprehensive list of roads for all unconnected hamlets and status of empowered committee meeting for finalization of the roads Status of release of funds to SoSSMBC for Social Audit Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness workshop for all technical staff by DMs. Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 44 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. South Status Remarks Miscellaneous issues District Dhalai Issue Status Comprehensive list of roads for unconnected hamlets and status empowered committee meeting finalization of the roads Status of release of funds to SoSSMBC Social Audit all of for for Discussion on the roadmap for preparing the Shelf of Project from PRIs Status of selection of irrigation projects in consultation with PWD(WR). Publication of booklet by line Departments on achievement in MGNREGA. Organizing awareness technical staff by DMs. workshop for all Status of putting up display board for all MGNREGA projects by line departments. Status on preparation of projects for patta holders Status on provision of irrigation facility, plantation, horticulture, land development to land owned by households belonging to the BPL SC/ST hhs 45 Status of DPR for banana and pineapple plantation by Horticulture Dept. and plan to revive defunct orchards. Remarks IAY – Financial (upto March, ‘12) Dist Scheme Total Allocation Central State Fund received Total Central State Total Expenditure % of Exp Normal IAY North RoFR IBBF Normal IAY Dhalai RoFR IBBF Normal IAY West RoFR IBBF Normal IAY South RoFR IBBF Addl.IAY Normal IAY Total RoFR IBBF Addl. IAY Contd … 46 IAY – Financial (upto March, ‘12) Dist Unakoti Schem e Normal IAY RoFR IBBF Normal IAY Sepahijala RoFR Khowai IBBF Normal IAY RoFR Gomati IBBF Normal IAY RoFR IBBF Total 47 Addl.IAY Normal IAY RoFR IBBF Addl. IAY Total Allocation Central State Fund received Total Central State Total Expenditure % of Exp IAY – Physical (upto March, ‘12) Dist Scheme Spilled Over target of 2010-2011 Target of 2011-12 Total target Houses completed up to Jan, 2011 Houses in Progress % of houses completed Normal IAY North RoFR Border Fencing Normal IAY Dhalai RoFR Border Fencing Normal IAY West RoFR Border Fencing Normal IAY South RoFR Border Fencing Normal IAY Total RoFR Border Fencing 48 Contd … IAY – Physical (upto March, ‘12) Dist Scheme Normal IAY Unakoti RoFR Border Fencing Normal IAY Sepahijala RoFR Border Fencing Normal IAY Khowai RoFR Border Fencing Normal IAY Gomati RoFR Border Fencing Normal IAY Total 49 RoFR Border Fencing Spilled Over target of 2010-2011 Target of 2011-12 Total target Houses completed up to Jan, 2011 Houses in Progress % of houses completed SGSY- Physical upto March, ‘12 T North DLI West South SPJ Khowai Unakoti Gomati Total 50 A T A T A A Total disbursed T Dist Loan 2 Gr Subsidy nd CC AC Sanctioned (in Lakhs) st 1 Gr. Sponsored Formation SGSY – Financial (up to March, ‘12) Fund Received Dist. Central North Dhalai West South Sepahijala Khowai Gomati Unakoti Total 51 State Total (including others) Expenditure (up to March, ‘12) (Rs.in lakh) (with %) Subsidy (55%) Revolving fund (10%) Training (10%) Infra structure (25%) Total Status of TSSPS Sanctioned District Target Sponsored No Dhalai North West South Sepahijala Khowai Gomati Unakoti Total 52 Disbursed amount Amount From Govt From Banks Miscellaneous issues on SGSY •Preparedness vis-à-vis transition to NRLM / NERLP 53 Status of progress on SECC, 2011 District West Sepahijala Khowai Gomati South Dhalai Unakoti North 54 Expected Start date Supervisory % of 2nd completi Enumeration of round Total EBs % round on date Completed Supervisory completed completion of 2nd round in Ebs round Status of both enumeration & Remarks supervisory if any round completed in Ebs DCC Bills Dist. 1 Dhalai South North SPJ Khowai Gomati Unakoti West 55 (Rs.in lakh) Amt. of AC Bills Year wise amount of AC Bills still pending for adjustment Amt . Amt. of pending Total through DCC bills after submission upto March, ‘12(4-5) drawn DCC bills for amount through submitted adjustment of AC AC bills upto through Bills during March, DCC Bills (2+3) Upto 2011-12 ‘12 06-07 07-08 08-09 09-10 10-11 11-12 as on 1.4. 05-06 2011 2 3 4 5 6 7 8 9 10 11 12 PENDING POSITION OF U.CS UNDER 13th FC upto March, ‘12 Name of District. West Sepahijala Khowai 56 Name implementing officer Total Fund placed UC Received UC Pending PENDING POSITION OF U.CS UNDER 13th FC upto March, ‘12 Name of District. South Gomati Dhalai 57 Name implementing officer Total Fund placed UC Received UC Pending PENDING POSITION OF U.Cs UNDER 13th FC upto March, ‘12 Name of District North 58 Name implementing officer Total Fund placed UC Received UC Pending PENDING POSITION OF U.Cs UNDER 13th FC upto March, ‘12 Name of District Unakoti 59 Name implementing officer Total Fund placed UC Received UC Pending Thank You 60