Transcript Slide 1


31st IG Meeting
South Gas Regional Initiative
26th February 2015
Teleconference
1

Agenda
I.
Opening
I.1
Welcome
I.2
Approval of the agenda (for approval)
II. CAM
II.1
Monthly auctions: results (for information by NRAs)
II.2
TSOs proposal of common methodology to maximize technical capacity (for
information by TSOs)
II.3
Status of TSO’s IT systems for adaptation to daily auctions by 1st November 2015.
(for information by TSOs)
III. CMP: common methodology of OSBB for the Region (for information by TSOs)
IV. Balancing NC implementation in the three countries (for information by NRAs)
V. Infrastructures:
V.1
Update of the process of PCIs list (for information by NRAs)
V.2
Candidate projects of common interests in the Region (for information by TSOs)
VI. Preliminary agenda of the SG meeting 16th March (for discussion)
VII. AOB and next meetings
2
 II. CAM NC
II.1. Results of the last monthly auctions
(for information by NRAs)
3
 II. CAM NC
II.1. Summary of monthly auctions results via PRISMA
Participation without incidents.
Clearing price was the reference price at every auction.
Allocated capacity (%) of
total offered bundled
monthly capacity
VIP PIRINEOS
VIP IBERICO
FR-ES
ES-FR
ES-PT
PT-ES
October 2014
34
0
7
0
November 2014
69
0
12
0
December 2014
87
0
10
0
January 2015
0
0
10
0
February 2015
18
0
12
0
March 2015
23
0
5
0
4
 II. CAM NC
II.2. TSOs proposal of common methodology to maximize
technical capacity
(for information by TSOs)
5
 II. CAM NC
II.2. Capacity calculation and maximisation at interconnections
Article 6.1 of Regulation (EU) nº 984/2013 (CAM NC) states that:
“(a) In order to maximise the offer of bundled capacity through the optimization of the
technical capacity transmission system operators shall take the following measures at
interconnection points, […] , the transmission system operators shall establish and apply
a joint method, setting out the specific steps to be taken by the respective transmission system
operators to achieve the required optimization.
NEXT STEPS:

Agreement on a common methodology for calculation of
capacity in the Region.

URGENT: capacity to be sold in the annual auction on 2 March
– maximising the offer of bundled capacity at both VIPs in the
Region: VIP PIRINEOS and VIP IBERICO
6
 II. CAM NC
II.2. Capacity calculation and maximisation at interconnections
VIP PIRINEOS (GWh/d)
ES
FR
FR
ES
Spanish side
French side
Spanish side
French side
summer
1 Apr-31 Oct
43
9
10
10
winter
1 Nov-31 Mar
40
5
20
3
165
165
165
165
IP Biriatou
IP Larrau
7
 II. CAM NC
II.3. Status of TSO’s IT systems for adaptation to daily
auctions by 1st November 2015
(for information by TSOs)
8
 III. CMP: last development of OSBB proposal
III.1. Common methodology of OSBB for the Region
(for information by TSOs)
9
 III. CMP: last development of OSBB proposal
NRAs reaction to OS proposal
• A common document for the Region – agreement by TSOs: TIGF,
REN and Enagás, is required.
• Positive evaluation, as a first step in the right direction to comply with
European and national rules.
•
Methodology: it will start with conservative figures and it will continuing
increasing the level of risk, once parameters values will be changed.
• Fixed parameters could be revised after the first year of application.
• Implementation date should be adapted to the application of daily
auctions: November 2015.
• A public consultation will take place
methodologies are submitted (OS&BB).
in
Spain
when
both
10
 IV. Balancing NC implementation in the three countries
(for information by NRAs)
11

IV. Balancing NC implementation in the three countries
FRANCE
•
The “Trading region South”, a single market zone including GRTgaz
South zone and TIGF, will be implemented from 1 April 2015. Both
TSOs will share a single trading point in southern France. They will
keep two distinct balancing systems but they will use the same
balancing marginal prices.
•
The balancing network code will be fully implemented in France in
October 2015, consistently with CRE deliberation of 15 January
2015:
http://www.cre.fr/en/documents/deliberations/approval/balanci
ng-rules-grtgaz-tigf
12

IV. Balancing NC implementation in the three countries
SPAIN
•
In September 2014, GTS (the Technical System Manager, the agent in
charge of the balancing) –following article 52 - sent a justified request
to the CNMC asking for an extension of the period to implement the
code – by 1 October 2016.
•
In October 2014, CNMC accepted the request. The answer was also
sent to European Commission and ACER.
•
The CNMC proposal of “Circular” to regulate the gas balancing is
submitted to Public Consultation until 23 March 2015.
http://www.cnmc.es/es-es/energ%C3%ADa/consultasp%C3%BAblicas.aspx
13

IV. Balancing NC implementation in the three countries
PORTUGAL
•
During this month, ERSE received from REN Gasodutos (TSO) –
following article 52 – a justified request asking for an extension of
the period to implement the code – by 1 October 2016.
•
ERSE is preparing the acceptance of the request, which has to be
sent to European Commission and ACER during the next 3 months
•
In March it´s foreseen the beginning of working meetings with TSO,
DSO and suppliers to discuss the framework to implement
balancing NC.
•
The public consultations to approve the new framework
regarding Balancing NC, are foreseen for the 2nd semester.
14

V. Infrastructures
V.1.Update of the process of PCIs list
(for information by NRAs)
15

V. Infrastructures
V.I. Update of the process of PCIs list
• Last EC meeting was held on 22 January. Main points discussed were:
 JRC Methodology to assess candidates
Using statics and mathematics formula, JRC transforms the parameters
resulting from the CBA application into four indicators of security of
supply, competition, market integration and sustainability
 Feedback from Ministries on the possible candidates approval
 Comments received from Stakeholders on the clusters proposed by
ENTSOG
• Next RG meeting will be held on 2 March. The Agenda includes the following
issues:
 TYNDP process
 Updated JRC assessment methodology
 Candidates presentation
 ACER/NRAs opinion on cost allocation of enabler projects
 Outstanding issues on specific projects
16

V. Infrastructures
V.2. Candidate projects of common interests in the Region
(for information by TSOs)
17
 VI. Preliminary agenda of the SG meeting 16
th
March
(for discussion)
18
th March
VI.
Preliminary
agenda
of
the
SG
meeting
16

10:30-10:35
I.
Opening
I.1 Welcome
I.2 Agenda and minutes of the last meeting (for approval)
10:35 – 11:30
II. Capacity Allocation Mechanism
II.1 Results of the auctions using PRISMA (for information by TSOs)
II.2 Status of the IT systems for the preparation of the first daily auction (for
information by TSOs)
II.3 Proposal of common methodology to maximize technical capacity (for
information by TSOs)
11:30-12:15
III. Congestion Management Procedures
III.1 Common OSBB methodology in the Region (for information by TSOs)
III.2 Regulators reaction to the OSBB methodology (for information by NRAs)
12:15-12:45
IV. Iberian Gas Hub: update on the study on models for integration of the Spanish
and Portuguese gas markets (for information by NRAs)
12:45-13:15
V. Balancing: implementation of the NC in the three countries (for information by
NRAs)
13:15-13:45
VI. Infrastructures
VI.1 Project candidates of PCIs in the Region (for information by TSOs)
VI.2 Status of the adoption process of the second list of PCIs (for information
by NRAs)
13:45-14:15
VII. Security of Supply
VII.1European Commission public consultation on revision of the SoS
Regulation (for information by NRAs)
VII.2Role of LNG in South Region SoS (for information by NRAs)
14:15-14:30
VIII.AOB and next meetings
19

CONCLUSIONS
KEY ACTIONS IN THE SOUTH REGION
 A common methodology, agreed by ENAGAS, TIGF and REN to
calculate the capacity at both VIPs in the Region.
 Publication of capacities to be sold in the annual auction on 3 March
(maximising bundled capacities) at both VIPs
 A harmonized OSBB methodology for the Region, agreed by
ENAGAS, TIGF and REN
 An update on the progress on Bal NC implementation in the three
countries, by NRAs.
 Sharing information on existing infrastructure projects and potential
new schemes: hydraulic data to be exchanged by TSOs in order to
simulate new interconnection capacities.
20
 VII. AOB and next meetings
SOUTH GRI Agenda - 2015
L
5
12
19
26
L
6
13
20
27
M
6
13
20
27
M
7
14
21
28
JANUARY
J
V
1
2
7
8
9
14
15
16
21
22
23
28
29
30
X
APRIL
J
1
2
8
9
15
16
22
23
29
30
X
V
3
10
17
24
S
3
10
17
24
31
S
4
11
18
25
D
4
11
18
25
D
5
12
19
26
L
2
9
16
23
L
4
11
18
25
M
3
10
17
24
M
5
12
19
26
FEBRUARY
X
J
V
4
11
18
25
X
6
13
20
27
5
12
19
26
MAY
J
7
14
21
28
6
13
20
27
V
1
8
15
22
29
S
7
14
21
28
S
2
9
16
23
30
D
1
8
15
22
D
3
10
17
24
31
L
2
9
16
23
30
L
1
8
15
22
29
M
3
10
17
24
31
M
2
9
16
23
30
X
MARCH
J
V
4
11
18
25
X
3
10
17
24
5
12
19
26
JUNE
J
4
11
18
25
6
13
20
27
V
5
12
19
26
S
7
14
21
28
S
6
13
20
27
Next meetings:
•SG meeting on 16 March
•IG meeting in May?
21
D
1
8
15
22
29
D
7
14
21
28