SPC Australasia
“One Single ,Uniform coating for the entire pipeline using LPE – Liquid Polymer coatings “
Paper presented at the ACA ( Australian Corrosion Association ) Perth 2004
Jeevan Menon
BSc,BE
SPC
SPC Australasia
Slide 2/20 Typically several different types of coatings are used in a pipeline project (where different coating Parameters are needed). These different sections of a pipeline are:
the Mainline coating the Bends and fittings the HDD sections the Field Joint coating and the Coating repairs on site
.
This creates issues of compatibility , Coating Standardization and increased coating costs .
SPC
SPC Australasia
Slide 3/20 Liquid Polymer epoxy (LPE) coatings exhibit characteristics which can be designed to suit the application. Typically for an ideal Pipeline coating to cater for all the pipeline sections ,the following Parameters are essential : 1.
2.
3.
4.
5.
6.
Hardness Corrosion protection of the steel Flexibility Abrasion resistance Impact resistance User friendly application – Spraying with Plural Gun , - Spraying with standard Airless - Manual application with brush or roller
SPC
SPC Australasia
Bitumen (Bit)
Pipeline Coatings
Coal-Tar Enamel (CTE) Cold-Applied Tapes (CAT) 2-Layer Polyethylene (2LPE) Fusion Bonded Epoxy (FBE) 3-Layer Polyethylene (3LPE) 3-Layer Polypropylene (3LPP) Liquid Polymer Epoxies Offshore
Onshore Offshore Onshore Onshore / Offshore Onshore / Offshore Onshore / Offshore Onshore /Offshore Onshore/Offshore
Negative Buoyancy (Concrete Weight Coated) Insulated Pipe (PU foamed pipe with Jacket) Deep Water Solutions (Thermotite)
Offshore Onshore / Offshore Offshore
SPC
SPC Australasia
Slide 4/20 Review of Pipeline coatings used in Australia : Yellow Jacket – ( 2 layer HDPE coating ) a soft mastic with a PE Outer jacket FBE ( Fusion Bonded Epoxy) Powder Trilaminate or Three layer PE coating consisting of: -1 st Layer – FBE -2 nd Layer – Tie adhesive -3 rd Layer –PE jacket
SPC
SPC Australasia
3LPE Pipe line coating
Outer Layer – PE coating Tie adhesive layer Inner Layer –FBE FBE Steel Pipe PE coating -Mechanical FBE Powder – Corrosion
Three layer Polyethylene Coating 3LPE , Trilaminate
PE Layer Tie Adhesive
SPC
SPC Australasia
Slide 5/20 Using Fusion Bonded Epoxy (FBE) Powder Coating as a bench mark , lets compare the performance of these Liquid Polymer Epoxy( LPE) coatings-using existing pipeline coating Standards FBE Performance Standards:
AS 3862
Australian Std. “External fusion-bonded epoxy coating for steel pipes” (Australia)
NACE RP0394
“Application, Performance, & Quality Control of Plant-applied, Fusion-bonded Epoxy External Pipe Coating” (NACE International based in USA)
CSA Z245.20
“External Fusion Bond Epoxy Coating for Steel Pipe” (Canada)
SPC
SPC Australasia
Slide 6/20
Hot Water Soak Adhesion
Requirements of FBE Standards :
AS (60 °C / 28 days) - # 1-3 rating - hard to peel with knife
SP2888 Soak at 75 °C - 28 days
NACE (24 hrs) - hard to peel with knife CSA (95 °C/24hrs)- hard to peel with knife
SP2888 liquid Polymer Coating
• •
Results:
• 95°C / 24 hrs: - coating does not soften - coating cannot be removed 75 °C / 28 days: - coating cannot be removed •SP2888 cannot be removed even after exposure to 28 days @75C
SPC
SPC Australasia
Bend Flexibility
• Requirements of FBE Stds.: • NACE (at -18°C): Slide 7/20 > 2.5 degrees/pipe diam. •SP2888 LPE Results •at 0°C •at -18°C > 2.5 degrees/pipe diam.
> 2.5 degrees/pipe diam. SP 2888 LPE is much more flexible than FBE Note: AS3862 requirement of 3.75 degrees for Field Pipe bending is not relevant
SPC
SPC Australasia
Impact Resistance
•
Requirements of FBE Stds. at 23 °C
•AS: •NACE: •CSA: >1.5 J (13 in-lb) >1.5 J >1.5 J •
SP2888 LPE Results
• at 23°C : >3.0 J (26 in-lb) Slide 8/20
SP2888 Impact > 3.0 Joules
• at 0°C : >3.0 J (26 in-lb) SP2888 has twice the impact resistance of FBE
SPC
SPC Australasia
Cathodic Disbondment
Slide9/20 •
Requirements of FBE Stds. at 65 °C :
• AS: < 8mm / 24 hrs • NACE: • CSA: < 8mm / 24 hrs < 10mm / 48 hrs •
SP2888 LPE Results:
• 65°C / 48hrs: <5.5mm
SP2888 CD at 65 °C - 48 hrs
• 80°C /28days: <10 mm SP2888 LPE has better disbondment characteristics than FBE
SPC
SPC Australasia
Application Coating Yellow Jacket( 2 layer HDPE) coating FBE Powder coating Yes Yes 3LPE Yes Liquid Polymer Epoxy Yes No *No No Yes No No No Yes No **No No Yes No No No Yes *FBE as a single coating is not suitable for HDD applications ** FBE on the joints is expensive and not user friendly
SPC
SPC Australasia
•
Summary
Slide 11/20
Liquid Polymer Epoxy (LPE) Coatings exceeds FBE coating performance requirements . One single coating is used as : a Mainline coating
–
For Bends and fittings
–
HDD
–
Field Joint coating and repairs Can be applied on site with
standard
Equipment SPC
SPC Australasia
Slide 12/20
Latest developments in LPE technology.
Development of an LPE oxidation / priming system that can be applied to high-density polyethylene (Trilaminate ) coatings without the requirement for grit blasting. Laboratory results have produced tensile adhesion results in excess of 2000 PSI (13.79 MPa) and excellent CD results
SPC
SPC Australasia
References: Main Line Coatings
2.1
JP ONE Asset Pipe line Thailand
33km x 14" - Coated in Thailand 2.2
Chevron Thailand M11 - M14
project Various 3.5 Km 2.3
Transcanada Pipelines( TCPL)- Canada
1998 - 26Km - 34" 1999- 30Km -42" 2000- 15Km -42" 2.4
Great Lakes pipeline -Canada-USA
1999 - 50 Km - 36" 2.5
Westcoast Energy Canada
- 5 Km -36" 2.6
TransCanada rehab of Trunk line
over 200km 36"-42" between 1998-2000
SPC
SPC Australasia
Transcanada Pipelines SPC
SPC Australasia
Major SPC liquid Epoxy installation list – Projects in Australasia May 2004
Tweed River McConnell Dowell
900metres x 16"Directional join
Century Zinc project Bechtel USA Myall Creek Project
monitoring upright Pipes 504 metres x6”(river) Crossings &HDD
Wide Bay Project
800 metres x 6"(road and river )
Duke's Eastern Gas pipeline NSW
repairs to the Coating damage
Duke Energy
–Tasmanian Pipeline
Craigieburn Bypass
–
GASNETVictoria
600 mm BendsSpray Grade -Mainline
Docklands relocation projectGASNET /ORIGIN Energy
Various lengths 30",18", 12" 8"and 4"
Moranbah Gas Project Worley QLD & Orrcon
as all induction bends and anchor flanges .508mm Pipes, induction Bends , HDD Pipes for Road and river crossings and two buried tanks
Spring Gully Gas project -Origin Energy
18 metre lengths of pipe x12” as well
Chevron Offshore and Onshore high temperature Risers and pipelines 150C –Thailand
3.5 km xSP8888 rated for 150C tested and approved by Chevron . Used for their M11- M14 Platforms SP8888 spray grade used for all risers , pipelines and induction bends SP8888 brushgrade used for the joints and coating repair
SPC
SPC Australasia
BP – Project BTC Pipeline 1200 km x 42” & 48 “ - 3LPE coated Pipe SP2888 Brushgrade for the joints
SPC
i i n
SPC Australasia
Comparison of coating Pipe in Thailand with SP2888 and 3LPE in
i i i i
Batam or Kuantan- Bangkok Ring Mains Soi Noi Project 30” x 18.34 Wt Pipe x 69630 metres
i i i i
3LPE (per lin metre) SP2888 ( Per lin metre) 37840 metres 2.5mm $37.32 18mil $38.23
31280 metres 3.5mm $50.93 25mil $40.23
510 Metres 3.5mm $50.93 25mil $40.23
.
.
.
.
Bare Pipe receiving $1.67
$0 At Batam/Kuantan Coated Pipe Loadout $2.25
Coated Pipe Freight $24.33
i i i i
$0 $0 Total Cost
$167.43
Cost Savings of approx 29.11% 6 3 $118.68
SPC
SPC Australasia
Slide 13/20 Moranbah Gas project –Worley 508mm coated in Brisbane SP2888
SPC
SPC Australasia
Slide 14/20 Moranbah Gas project –Worley 508mm HDD coated in Brisbane coated with SP2888
SPC
SPC Australasia
Slide 15/20 Coating repairs of Duke ‘s EGP Pipeline (FBE) with SP2888 brushgrade .
SPC
SPC Australasia
Slide 16/20 Docklands Project 30” Pipes sprayed in Melbourne
SPC
SPC Australasia
Slide 17/20 Tweed River project HDD String 900 metres x 16” SP2888 mainline coating with Brushgrade on the joints- Coated in Brisbane
SPC
SPC Australasia
Slide 18/20 SP2888 brushgrade used for buried Stoppel Flanges –GPU Gas Net Melbourne
SPC
SPC Australasia
SP8888 150 C for Chevron’s M12,M13&M14 Projects 6” , 8” and 12” Slide 19/20
SPC
SPC Australasia
SPC Brushgrade
Brush Grade Application
•
Pre-measured kits
•
Mix to achieve uniform color
•
4 minutes by hand
•
or 1 min. with drill stirrer SPC
SPC Australasia
SPC Brushgrade
Application by Roller
SPC
SPC Australasia
SPC Brushgrade
Brush Application
SPC