Motivation for Process Integration 1
To satisfy the increasing demand for development of
environmentally benign yet operable process
That means to:
• Select an environmentally friendly chemistry
• Minimize material waste
• Maximize energy (exergy) efficiency
• Ensure that the integrated plant is safely operable
8/8-2/9 2005
Process and Tools Integration
2
Motivation for Process Integration 2
New Process:
• Consider aspects of environmental impact (material and energy
recycle) and control as early during process design as possible
• Prevent potential problems rather than cure (which may not be
possible)
Existing Process:
• Consider aspects of environmental impact (material and
energy recycle) and control on existing design – i.e. Retrofit
8/8-2/9 2005
Process and Tools Integration
3
Motivation for Process Integration 3
No recycle of information flow (arrow) – Integration possible ?
Issue 1
Issue 2
Recycle of information flow – Integration possible?
Issue 1
8/8-2/9 2005
Issue 2
Process and Tools Integration
4
Motivation for Process Integration 4
To perform process integration tools are needed to
facilitate information flow
• Early during the design phase
• Throughout the process life cycle
Ideally an integrated tool is needed: ICAS
(Integrated Computer Aided System)
8/8-2/9 2005
Process and Tools Integration
5
Organization - Schedule
August 8: Introduction (hw, rag, tg, sbj)
August 9-11: Heat Integration (tg)
August 12 & 15: Mass Integration (hw)
August 16: Separation agents, Optimization (rag)
August 17: Operability and Control issues (sbj)
August 18: Sustainability, Safety and Hazards (rag)
August 19: Exam Problem Presentation and selection
Week 3 & 4: Exam problem solution
Lecturers: tg: Truls Gundersen, hw:Henrik Wenzel,
rag: Rafiqul Gani sbj: Sten Bay Jørgensen
8/8-2/9 2005
Process and Tools Integration
6
Organization - Day 1
Aug. 8’th
• Introduction & motivation (sbj)
• Mass integration (hw)
• Process integration (rag)
- Lunch at some point
• Tools integration (rag)
• Heat integration (tg)
• Operability and control (sbj)
8/8-2/9 2005
Process and Tools Integration
7
Organization – remaining days
Aug. 9’th – 18’th
8.30 – 12:00 lectures 13:00 – 16:30 tutorials
8/8-2/9 2005
Process and Tools Integration