Diapositive 1

Download Report

Transcript Diapositive 1

National Center for Scientific and
Technical Research
--------------------------------------------------------------------National Institute of Geophysics
NEAREST PROJECT
CNRST Contribution to WP5 activities
NEAREST meeting Barcelona
May 2008
Birouk A.
ING-CNRST
Plan


Seismic Data sharing and integration
Contribution of the CNRST to the
Tide gauge Network
NEAREST meeting Barcelona
May 2008
Workpackge N° 5
Data integration/ Integrated tsunami detection Network
Objectives:
Integration of data collected in real time, collection of waveforms from
different permanent landbased networks with the data collected by OBS array
and seafloor observatory
Description of work
Task 5.1: Establishment of 3 data collectors for real-time automatic
processing of data (one in Portugal, the other in Spain and a 3rd one
in Morocco)
Task 5.2: Waveform sharing between data collectors, integration of
seismic data including OBSs
Task 5.3: Integration of tide gauge data
Task 5.4: Integration of multiparameter data from seafloor
observatory
Task 5.5: Development of automatic procedures for rapid
determination of seismic parameters and definition of thresholds for
triggering the tsunami detection procedures
Task 5.6: Development of an effective tsunami detection methodology.
Definition of thresholds for issuing different levels of alarm messages
NEAREST meeting Barcelona
May 2008
Contribution of the CNRST to WP5:
Seismic Data sharing and integration: current state
CNRST-Rabat reception from IM of Lisbon since 20/5/08
PM_PVAQ BB station (since 20/5/08)
Digitiser: Guralp DM24
Sensor: Guralp CMG-3T (120 sec)
PM_PESTR BB station (since 20/5/08)
Digitiser: Guralp DM24
Sensor: Guralp CMG-3T (120 sec)
PM_PFVI BB station (since 18/11/08)
Digitiser: Guralp DM24
Sensor: Guralp CMG-3ESPc (120 sec)
IM of Lisbon reception from Rabat
RTC-Rabat VBB station (since 20/5/08)
Digitiser: Quanterra 680
Sensor: VBB Streikeisen STS-1 (320 sec)
One or two news BB stations wil be availaible in few months to IM and UGR nodes
Data sharing with UGR regional center of Spain (node):
not yet available because data acquisition system in Spanish node is based on another system not
compatible with Seiscomp. In few months this problem will be fixed and 2 BB stations will be availaible in
real time to Rabat node.
NEAREST meeting Barcelona
May 2008
RABAT RTC VBB
STATION
NEAREST meeting
Barcelona May 2008
Reception in real time of Seismic data in Rabat node
NEAREST meeting
Barcelona May 2008
REMOTE STATION: GENERAL OVERVIEW
OR
OR
NEAREST meeting
Barcelona May 2008
Le-3D
Data Acquisition & Processing System
DUAL HUB
Dual Modem
Antelope
NEAREST meeting
Barcelona May 2008
WP5: Rabat Data Collector
Acquisition and installation of near real time digital tide gauge

The development of the Early Warning System (EWS) Prototype is
based on the integration of




Actually there is a lack of coverage by real time tide gauge of the
southern part of Moroccan-Iberian region


land recorded seismic data
deep ocean water height
near-shore tide gauge data.
the localisation in morocco of a new real time tide gauge will fill the
lack and will improve greatly the reliability of the Tsunami early
warning System prototype
CNRST contribution to development of TEWS by acquiring a digital
tide gauge



Near shore Sea level data transmitted in near real time to Rabat
data collector
Availability Data in near real time to others data collector
Installation planned in less than 3 months in Moroccan Atlantic cost
NEAREST meeting Barcelona
May 2008
WP5: Rabat Data Collector
Acquisition and installation of near real time digital tide gauge

Manufacturers contacted:

Sensor:
•
•
•

Acquisition System (logger):
•
•
•
•

OTT MESSTECHNIK GmbH & Co. KG
KROHN
VEGA
OTT MESSTECHNIK GmbH & Co. KG
KROHN
ELTA
Campbell Scientific
Best Quality/price ratio by OTT MESSTECHNIK GmbH


Sensor: Kalesto type Radar technology
Acquisition System : OTT DuoSens
•
•
•
•
•

analogical inputs: 2 (voltage,curent,PT100)
digital inputs: 2 impulse, 1 SDI-12 and RS-485;
Control : RS-232 or Infrared IrDA;
Sampling: 5s-24h;
Transmission: dial-up line ,GSM, GPRS, ADSL and satellite
acquisition and processing: Hydra 3 software:
NEAREST meeting Barcelona
May 2008
TIDE GAUGE DATA INTEGRATION TO RABAT DATA COLLECTOR
Tide gauge
Logger
ADSL MODEM
VPN
TELECOM OPER
ADSL MODEM
Morocco land seismic
BB stations node
(CNRST)
Spain land seismic
BB stations node
(UGR)
NEAREST meeting
Barcelona May 2008
-Tide Gauge Acquisition
cost: ~ 20.000 Euro
-Tide Gauge Installation
cost:~ 1500 Euro
-Tide Gauge oparating
Cost: ~ 120 Euro / month
Portugal land seismic
BB stations node
(IM)
Near real time Internet link
ADSL transmission
Water level sensor
KALESTO-OTT Radar sensor
NEAREST meeting
Barcelona May 2008
Tide gauge acquisition System
NEAREST meeting
Barcelona May 2008
Communcations possibilities of
Tide gauge acquisition System
NEAREST meeting
Barcelona May 2008
Moroccan tide gauge network
ANP: 10 Tide gauges:
-VEGAPULS 65 Radar Sensor
-AURORE 200 datalogger.
Martec/Serpe-IESM
-Data is recorded every 10
minutes but presently only a
Flash memory is used
-Data sent as an attachment to
an email on a monthly or 3
monthly period from all ports
ANCFCC: 2 Tide gauges
- Mors HT200 Acoustic
- No information availaible on
data storage and transmission
Moroccan tide gauge network operated since 2003 by DPDPM and ANCFCC.
(Ref: Intergouvernmental Oceanographic Commission (IOC), 2007. Global Sea Level
Observing System
(GLOSS), Technical Visit Report, 4th - 12th February 2007)
NEAREST
meeting
Barcelona May 2008
Harbours prospection for installation of tide gauge: Sidi Abed
Marina (nearby Rabat)
NEAREST meeting
Barcelona May 2008
Harbours prospection for installation of tide gauge:
Mohamadia Harbour
NEAREST meeting
Barcelona May 2008
Moroccan tide gauge network
Exemple of tide gauge installation, Agadir Harbour
NEAREST meeting
Barcelona May 2008
CNRST- ANP BEGINNING OF
COOPERATION

Possibilities of cooperation on tsunami hazard assesment
(accses to ANP tide database)

Installation of CNRST TG in Harbour managed by ANP

data exchange in real time between CNRST and ANP

CNRST can take in charge upgrading of data transmission
possibilities of the current tide gauge in tangier

it will result in two real time TG for the benefit of our
NEAREST project
NEAREST meeting Barcelona
May 2008