Budgeting for ARC Discovery Projects commencing in 2007

Download Report

Transcript Budgeting for ARC Discovery Projects commencing in 2007

Budgeting for
ARC Discovery Projects
commencing in 2008
Introduction
Martina Stiemer
Management Accountant
Office of Financial Services
X7369
[email protected]
OFS Budget Officers
Lokiluyana Wijesena ELS, ICS, L&P
Stephanie Grollimund SCMP, Humanities, ACES
Margaret Frith
MGSM, EFS
ARC Discovery Projects
commening 2008
Overview
ARC Discovery Projects
commening 2008
Purpose of Discovery Grants
• Support excellent fundamental research by individuals
and teams
• Assist researchers to undertake their research in
conditions most conducive to achieving best results
• Expand Australia's knowledge base and research
capability
• Encourage research training in high-quality research
environments
ARC Discovery Projects
commening 2008
Eligibility Criteria
• All CIs, PIs and ARC Fellows nominated on a Proposal
must satisfy the eligibility criteria for their nominated role.
• Con-current projects
(section 3.6.1.2 Funding Rules)
• Researcher roles
(section 5.1 Funding Rules)
Chief Investigator
Partner Investigator
ARC Fellows
• Cross-scheme eligibility (section 6 Funding Rules)
ARC Discovery Projects
commening 2008
Application Process
Application process
• 5pm Monday 18 December 2006
Eligibility Rulings Requests
•
5pm Friday 9th February 2007
Receipt of applications to MQ
Research Office
•
Mid June 2007
Assessments available for
written rejoinder
•
Late June 2007
Due date for one-page
rejoinders
•
August 2007
Assessment of applications for
funding
•
October/November 2007
Ministerial approval of funding
recommendations and
applicants advised of outcome
ARC Discovery Projects
commening 2008
Application Process
• Changes from last year (Handout)
– 2 concurrent Discovery projects
• GAMS
• Part C Budgets (Handout)
ARC Discovery Projects
commening 2008
Funding
• Projects are funded between $20,000 - $500,000 per
calendar year
• Projects can be funded for 1 to 5 years
• ARC Fellowships (AFR, QE11 and APF) are funded
according to ARC salary scales and normally for 5 years
• APDs are normally awarded for 3 years but a 4 year
research/teaching option is available
ARC Discovery Projects
commening 2008
ARC Funding - Allowable
• Personnel (salaries and on-costs)
ARC Fellowships
Research Associates, technicians and laboratory
attendants
Postgraduate stipends with an ARC contribution
• Teaching relief for Chief Investigators only
(must be fully justified, and will be a special condition of grant)
• Equipment
• Maintenance
• Travel
ARC Discovery Projects
commening 2008
ARC Funding – Non Allowable
•
•
•
•
•
•
•
•
Capital works and general infrastructure
Salaries of Chief Investigators and Partner Investigators
General Teaching or Teaching Relief
Special Studies Programs
Research support for Partner Investigators
Tuition Fees – International, HECS or HELP
Computer Facilities for molecular analysis
Costs not directly related to a project
ARC Discovery Projects
commening 2008
ARC Funding – Non Allowable
Basic Facilities
Accommodation
• Access to workshop services
• Film and music editing facilities
• Access to basic library
• Standard reference materials/abstracting services
• Provision of computers and laptops and basic facilities such
as printers, standard software (except for high performance
computers or specialized applications)
• Use of telephones, fax, photocopiers, email, internet, mail
Publication Costs
• Including printing and page costs
ARC Discovery Projects
commening 2008
Direct Expenses
• ARC is seeking full costing information
– To enhance transparency and accountability
– To help determine the actual contributions to
be paid by the ARC and the other parties.
• Direct costs = all costs required to
complete the project
ARC Discovery Projects
commening 2008
Direct Expenses
• Personnel (ARC Funded)
• ARC salary scales
– No increments, assumed to start 1 January
– Fellowships
• Options for 3 year or 4 year research / teaching
– Phd Stipends
• Flat rate
ARC Discovery Projects
commening 2008
Direct Expenses
• Personnel (MQ Funded)
– Based on MQ salary rates (include
increments)
– Oncost rate used is 28%
– If personnel will be paid by partner or other
University base salary cost on partner
organisation/other university salary scales
ARC Discovery Projects
commening 2008
Direct Expenses
Salary
• Applicable salary rate x time fraction x 1+ on-cost rate = Total Salary Cost
Eg. Level B.2 in 2008, time fraction on project is 30%, on-cost rate is 28%
55,000 x 0.3 x 1.28 = $21,120
Casuals
• Estimate a full-time equivalent time fraction if employed for a lengthy period and
calculate as above for salaries.
Eg. 3 days per week for 26 weeks
FTE = 3/5 * 26/52 = 0.6 x 0.5 = 0.3
• Can use an hourly rate if employed for a short time
Eg. $50 x 70 hours x 1.28 = $4,480
ARC Discovery Projects
commening 2008
Direct Expenses
Presentation of Salaries in GAMS
• Salary costs are entered into Part C of GAMS
applications in standard format:
Position Title – Surname - Level @ Time Fraction + oncosts
Examples:
• CI – O’Neil – LB.1 @ 0.3 FTE +28% oncosts
• Research Assistant HEW5.2 @ 0.5 FTE +28% oncosts
• Research Associate LA.8 @ 0.5 FTE +28% oncosts
ARC Discovery Projects
commening 2008
Direct Expenses
Teaching Relief
• Only CIs are eligible
• Rate is $32,972 for maximum 6 months (pro rate if
requesting less than 6 months)
Example
• Position Title – Surname – Length of Teaching Relief
• CI – O’Neil – 6 months
ARC Discovery Projects
commening 2008
Direct Expenses
Equipment
• Hardware and software items greater than
$1000
• Include cost ex GST and any installation costs
• Base price on latest prices (avoid guestimates)
• If you require large costly pieces of equipment
consider applying for an ARC Linkage
Infrastructure, Equipment and Facilities Grant
(LIEF)
ARC Discovery Projects
commening 2008
Direct Expenses
Maintenance
• Consumables and equipment less than
$1000
• Don’t include computer equipment or data
entry personnel in this category, use
equipment or personnel
ARC Discovery Projects
commening 2008
Direct Expenses
Travel
– List costs clearly
– include number of travellers, origin and destination, airfares,
accommodation, daily allowances, field expense etc.
Example:
Sydney – Melbourne x 2 return trips x 4 project staff airfares
• Accommodation x 9 nights
• Meals & incidentals allowances 4 x 10 days @ 70 per day
• Travel to field site - Km allowance @52cents/km x 800kms
Sydney – New York x 1 return airfare
• Accommodation x 9 nights
• Meal & incidentals allowance 10 days @ 150 per day
ARC Discovery Projects
commening 2008
Direct Expenses
Other
– Any other direct costs that can’t be placed into
categories listed above.
– Eg Conference registration, translation services
GST
– Quote costs exclusive of GST.
– GST does not apply to the ARC funds transferred
directly from the ARC.
– GST on external purchases are not charged to
individual grant accounts.
ARC Discovery Projects
commening 2008
Indirect Expenses
• Infrastructure
– university charge not applicable to ARC Grant funds
• In-kind
– – non-cash contributions to project
• Indirect
– Estimate of infrastructure costs for full costing
purposes
– Calculation based on academic salaries Level A and
above. Do not include General Staff
– Multiplier
• 1.25 Lab based research
• 0.92 Non-Lab based research
ARC Discovery Projects
commening 2008
Indirect Expenses
• Standard format for presenting costs
• Position Title – Surname - Level @ Time
Fraction + oncosts x multiplier
Eg.
CI – O’Neil – LB.1 @ 0.3 FTE +28% oncosts x 1.25
Research Associate LA.8 @ 0.5 FTE +28% oncosts x 1.25
ARC Discovery Projects
commening 2008
Justification
• Explain why cost is required and what benefit it
brings to the research project.
• Break down justification under budget headings
ie.
–
–
–
–
–
–
Personnel
Teaching Relief
Equipment
Maintenance
Travel
Other
ARC Discovery Projects
commening 2008
Justification
ARC funded items (max 2 A4 pages)
• Personnel
– why is specific person/level of expertise required?
•
Fellowships
– why is a full-time commitment to project required or why has a teaching/research
option been chosen?
•
Teaching relief
– why is relief required to achieve a successful project outcome?
•
Major equipment
– Why is it required?
– Why is equipment not able to be accessed elsewhere and/or why is existing
equipment not suitable?
– Describe how it will be used and provide details of manufacturer, supplier, cost
and installation based on quotations. Actual quotations do not need to be
attached to application.
•
Travel – what is the purpose of the travel?
ARC Discovery Projects
commening 2008
Justification
Non-ARC Contributions (max 1 A4 page)
• How will University and other partner
organisation contribution support the
project.
• If Partner Investigators are listed explain
their contribution to the project.
ARC Discovery Projects
commening 2008
Resources
•
•
•
•
ARC Funding Rules
ARC Instructions to Applicants
MQ Salary Rates
ATO 05/06 reasonable travel rates
ARC Discovery Projects
commening 2008
Worked Example
Questions
Budgeting Contacts
• Divisional Finance Officers
• OFS Budget Officers
Lokiluyana Wijesena x7240 ELS, ICS, L&P
Stephanie Grollimund x7264 SCMP, Humanities, ACES
Margaret Frith x7210
MGSM, EFS