Transcript Slide 1

Easy Bill-correction Framework (EBF)
Implementation at NYPA
Helen Yang
New York Power Authority
Kelly McEnhill
SAP
© 2008 Eventure Events. All rights reserved.
Overview
• First successful implementation of SAP IS-U/CCS and
Easy Bill-correction Framework (EBF) with legacy billing
data migration.
• NYPA case study:
–
–
–
–
–
–
Business Challenge and Requirement
Why EBF
EBF within CCS
How to implement EBF
Benefits
Lessons Learned
• Speakers:
– Helen Yang, Director, IT Product Support, NYPA
– Kelly McEnhill, Sr. IS-U/CCS Consultant, SAP
About New York Power Authority
• America's largest state-owned power organization
• Provides some of the lowest-cost electricity in
New York State
• Operates 18 generating facilities and more than
1,400 circuit-miles of transmission lines
• Sells power to
– government agencies
– community-owned electric systems and rural electric
cooperatives
– job-producing companies
– private utilities for resale—without profit—to their
customers; and to neighboring states, under federal
requirements
SAP IS-U/CCS Implementation
• Consolidated 4 customer billing systems
– South East New York (SENY) Customer Billing System
– Wholesale Customer Billing System
– WTC Economic Recovery Customer Billing System
– Loan Ledger System
• Project overview
– Timeframe: Oct 2006 – Feb 2008 (16 Months)
– Go-Live: Feb 2008
– Result: Project completed on time within budget
– Post Go-Live: Successfully completed 9 billing cycles
from January to October.
Bill Correction Challenges
• South East New York is NYPA’s major customer segment:
– 138 customers (e.g., biggest customer, New York City, receives monthly
bill of over $50 million)
– Over 12,000 accounts with over 5000 contracts under NYC
– Over 15,000 meters and ~28,000 meter readings per month
• SENY customer billing is based on meter readings provided by 3rd
party via 21 trip files and other data files (e.g., street lights).
• Challenges:
– High volume of prior months meter reading adjustments (6000 to 8000
MR adjustments, 1/3 of total MRs).
– Complex adjustment rules and scenarios (e.g., Sandwich Adjustment,
correction of prior period reads with actual reads among months of
estimated reads)
– Account for adjustments back to 7 years
– No parallel billing with legacy system after go-live
– Resource constraint for manual verification of meter readings and bill
corrections
Bill Correction Requirements
• Must be EASY
– One place to perform bill correction
– One bill to display adjustments and new balance
• Must be AUTOMATIC
– Retrieve and validate historical meter readings for up to 2 years
(95% of all adjustments are within 2-year adjustment window)
– Process bill adjustments
• Must allow for complex Adjustment Rules such as
“Sandwich Adjustments”
• Cost-Benefit Approach
– Data migration effort (2 vs. 7 years of historical data)
– System performance impact (2 vs. 7 years of historical data)
Why EBF?
• Option 1: Keep legacy system live for bill adjustment
– A common practice for most companies
– Very time consuming
– Redundant processes
• Option 2: Use manual process
– Good for small amount of bill corrections
– Good for simple bill corrections
• Option 3: Migrate historical data to Business Warehouse or SQL
database
– Major development effort
– Redundant processes
• Option 4: Adopt Easy Bill-correction Framework
–
–
–
–
Automation
One billing engine, one bill print, integrated processes
Historical billing data and meter reading data migrated into SAP
Configured historical trip schedules and prices
EBF within CCS
EBF Process Flow: Conversion EBF
NYPA specific table
• Utilizes Standard Migration Object
• Custom Tables: EBF Bill Documents and Display
only Original Meter History Table
EBF within CCS
Automatic Process Flow: Conversion
• Utilizes Standard Migration Objects
• Historical Requirements: Meter History, Pricing
and Device Information
EBF within CCS
EBF Process Flow: Reversal
EBF Tables
• ERCH and ZEBF tables utilized in EBF cancel document
• Cancel of EBF generates standard Manual Bill document
EBF within CCS
Automatic Process Flow: Standard
• Adjusted meter readings billed at historical prices
• New SAP Automatic Billing document for same
period
EBF within CCS
Process Flow: Results
• Manual bill doc with full negatives from EBF cancel
• SAP Automatic bill doc containing ALL new charges
• Combining at Invoicing gives a DELTA amount.
• Interfacing to FI-CA, BI and Bill Print
How to implement EBF?
EBF Conversion Strategy
Standard SAP Migration Object with Flexibility to
include Additional Fields
How to implement EBF?
Database Structure
• Converted 2 years of historical meter reading data for
both active and inactive meters
• Converted 2 years of latest balance/amount ($)
How to implement EBF?
Configuration Elements
• IMG:
• Basic Setting:
• Definition of
Correction Method:
• Steps & Pre-selection Values:
How to implement EBF?
EBF Billing Document
• Utilizes Standard Look & Feel w/ Normal Bill
• Monthly EBF Doc per Legacy Bill Doc
• Itemized Lines for Itemized Charges
How to implement EBF?
Processing Corrections
Mass Corrections via Interface with Meter Post via
Function Module Call
Individual via Front Office Call
How to implement EBF?
EBF Reversal
• Reverses individual records as Manual Bill Doc
• Posts to Offsetting Sub-transaction
• Opens Meter Read to Post New Read
• Re-bill utilizing Normal Billing Functionality
How to implement EBF?
Adjusted Billing Document with Multiple
Reversals in Legacy Period
• Normal Billing Functionality as Adjustment
• Reverses Old and Bills Corrections New
How to implement EBF?
Impacts on Interface with Other Functions
EBF Specific Attributes Customizable for Interface
Collaboration on Bill Document
• Sub-transactions for FI-CA
• Line Item Types for Bill Print
• Statistical Groups for Business Warehouse
@ NYPA:
Utilization of Standard Billing Attributes allow Interface
Synchronization among EBF & other Functions
EBF Benefits
• Enabled historical bill correction in one place
– SAP IS-U/CCS
• Automated complex and high volume billing
adjustments
• Retired legacy systems after go-live
• Mitigated risks in business change
management
Lessons Learned
• Implementing Easy Bill-correction Framework is not an EASY job.
Blueprint
Configuration
Realization
Data Cutover for Go-Live
Normal IS-U/CCS Implementation
1
2
1
Clear define
business
requirement
2
Require
comprehensive
BR Analysis
5
6
7
3
4
3
4
Evaluate
Alternative
solutions from
different angles
POC – take the
first cut to move
8
9
5
Determine historical data migration
scope
6
Determine integrated data migration
approach for both MASTER and EBF
data
7
Require Legacy system and data expert to
extract, process, and test/verify Data …
8
Require SAP IS-U/CCS Billing and DM
expert to perform EBF configuration, load
data, and test/verify data
9
Conduct different data runs in different
client/sandbox in order to gain time
10
10
Define integrated
Data Migration
Schedule with
both MASTER and
EBF data and take
at least one drill
before the cutover.
Data cutover
must be
ACCURATE!!!
Questions?
THANK YOU!
谢谢!
Helen Yang
Kelly McEnhill
New York Power Authority
SAP
[email protected]
[email protected]
© 2008 Eventure Events. All rights reserved.