Transcript Slide 1
NATIONAL ENERGY SITUATION AND STUDY OF BIOMASS POTENTIAL FOR SUSTAINABLE ELECTRIC POWER GENERATION INDONESIAN CASE Aryadi Suwono Professor of Mechanical Engineering Energy Conversion Research Group Institute Technology of Bandung Makuhari, Oct 13, 2006 OUTLINE • INDONNESIAN ENERGY SITUATION AND POLICY • STUDY ON BIOMASS ENERGY POTENSIAL FOR ELECTRICAL POWER GENERATION INDONNESIAN ENERGY SITUATION AND POLICY ENERGY DATA UPDATE TYPE ENERGY SOURCE THEORETICAL RESOURCE PROVEN RESERVE PRODUCTION RES/PROD RATIO Oil 86.9 billion barrels 5.8 billion barrels 0.5 billion barrels/year 11 Years Natural Gas 384.7 TSCF 90 TSCF 2.9 TSCF/year 30 Years Coal 50 billion tones 5 0.1 billion tones/year 50 Years TYPE OF ENERGY SOURCE THEORETICAL RESOURCE billion tones EQUIVALENT UTILIZATION Hydro 75,670 MW 845 Millions BOE 6,851 GWh Geothermal 27,000 MW 219 Million BOE 2,593.5 GWh Mini/Micro hydro INSTALLED CAPACITY 4,200 MW 800 MW 712 MW 206 MW Biomass 49,810 MW 302 MW Solar 4.8 kWh/m2/day Wind 9,287 MW 5 MW 0.5 MW BALANSE OF FOSSIL ENERGY PETROLEUM 2004 (MBOEPD) EKSPOR PRODUKSI 514 1125 PASOKAN DALAM NEGERI 611 NATURAL GAS 2004 (BSCFPD) EKSPOR PRODUKSI 4.88 8.35 DOMESTIK 3.47 COAL 2004 (MILLION JUTA TON PER YEAR) EKSPOR PRODUKSI 131,72 92,50 DOMESTIK 32,91 IMPOR 487 OIL REFINERY AND TRANSPORTATION THAILAND Manila LAOS Transit Terminal Bangkok CAMBODIA Ban Mabtapud Phnom Penh Philipines Ho Chi Minh City Songkhla Lhokseumawe Bangkot Jerneh Kota Kinibalu Guntong Penang Kerteh P. Brandan: 5 MBOPD WEST MALAYSIA Port Klang Medan Oil Refinery Sea Lawit Banda Aceh Tanker China Erawan Khanon Pipeline Distributi South VIETNAM West Natuna Duyong Mogpu Natuna Alpha BRUNEI Bandara Seri Begawan Kuala Lumpur Bintulu EAST MALAYSIA Port Dickson Dumai Dumai : 120 MBOPD Duri SINGAPORE Ternate Bintan Batam Bontang Attaka Tunu Bekapai KALIMANTAN Samarinda Padang Balikpapan Jambi HALMAHERA Sorong Kasim : 10 MBOPD Balikpapan : 260 MBOPD SULAWESI S.Pakning : 50 MBOPD Grissik Pacific Manado Kuching Musi 135.20 MBOPD Palembang Banjarmasin BURU IRIA SERAM Ujung Pandang Jakarta Bandung TOTAL REFINERY CAPACITY I Pagerungan N D O N E S I A 1,057,000 BOPD Balongan : 125 MBOPD Semarang Cepu : 3.80 MBOPD MADURA Bangkalan J A V A Surabaya Cilacap: 348 MBOPD Yogyakarta Indian Ocean SUMBAWA FLORES BALI LOMBOK SUMBA TIMOR AUSTRALIA NATURAL GAS RESERVE AND PIPING THAILAND Manila LAOS Bangkok CAMBODIA Ban Mabtapud Phnom Penh Philipines Ho Chi Minh City Songkhla Lawit Planned Pipelin Jerneh Kota Kinibalu Guntong Penang Lhokseumawe Kerteh WEST MALAYSIA 728 Port Klang Medan China Bangkot 3,896 Banda Aceh Existing Pipelin Sea Erawan Khanon South VIETNAM West Natuna Duyong Mogpu Natuna BRUNEI Bandara Seri Begawan Kuala Lumpur 52,081 Port Dickson Dumai Duri Alpha 31,814 TRAN Ternate Bintan Bontang LNG Plant & Export Terminal KALIMANTAN Padang Samarinda Balikpapan 14,260 Palembang 14,782 Sorong 3,654 SULAWESI Banjarmasin BURU 5,190 Cirebon IRIA SERAM Ujung Pandang Ardjuna Fields Jakarta HALMAHERA Attaka Tunu Bekapai Jambi Grissik Pacific Manado Kuching SINGAPORE Batam 3,220 Bintulu EAST MALAYSIA Semarang 4,289 MADURA JAVA Surabaya 0,11 Indian Ocean I Pagerungan N D O N E S I A Bangkalan BALI SUMBAWA FLORES LOMBOK SUMBA TOTAL RESERVES 2P : 134,015.5 BSCF TIMOR Resources 3,00 AUSTRALIA GAS RESERVE 2P (BSCF) TRANS ASEAN GAS PIPELINE (TAGP) MYANMAR LAOS LEGENDS CHINA Existing Pipeline Future Pipline Possible Interrconnections THAILAND Philippine Sea CAMBODIA VIETNAM Gulf of Thailand Andaman Sea PHILIPPINES South China Sea 5 Straits of Malacca 6 2 3 PACIFIC OCEAN 4 Celebes Sea 1 MALAYSIA INDONESIA INDONESIA Java Sea Banda Sea INDIAN OCEAN Trans-ASEAN Interconnections 1. Dumai to Malacca 2. West Natuna to Duyong 3. East Natuna to Bangkok via Duyong and Bongkot 4. East Natuna to Luzon via Brunei 5. Block B to Bangkok via Bongkot 6. Pauh to Arun COAL RESERVE AND TERMINAL MAXIMUM HANDLING CAPACITY (DWT) Tanjung Redep* 5.000 Tanjung Bara 200.000 B l o r o* 8.000 Loa Tebu* 8.000 COAL RESERVE (%) THERETICAL = 58 BILLION TON PROVEN = 6.9 billion ton MEASURED = 12.4 billion ton TOTAL = 19.3 billion ton R/P = 147 years Balikpapan 60.000 Tanah Merah 20.000 5.0 9.3 12.2 KALIMANTAN 10.6 55.1 IRIAN J SULAWESI JAVA Tarahan 40.000 Pulau Baai 35.000 Kertapati 10.000 Teluk Bayur 35.000 Catatan : * River Terminal North Pulau Laut 150.000 IBT – 70.000 Sembilang* 7.500 Air Tawar* 7.500 Banjarmasin* 10.000 South Pulau Laut S a t u i* 5.000 Kelanis* 10.000 200.000 ELECTRIC POWER GENERATION AND TRANSMISION GRID THAILAND Manila LAOS Bangkok CAMBODIA Ban Mabtapud Philipines Bangkot Jerneh Kota Kinibalu Guntong Penang Lhokseumawe Kerteh WEST MALAYSIA Port Klang Medan Power Plant Sea Lawit Banda Aceh China Erawan Songkhla Planned Transm VIETNAM Ho Chi Minh City Khanon Existing Transm South Phnom Penh West Natuna Duyong Mogpu Natuna Alpha BRUNEI Bandara Seri Begawan Kuala Lumpur Bintulu EAST MALAYSIA Port Dickson Dumai Duri SINGAPORE Bintan Batam Total Sumatera : 3,200 MW Ternate Total Kalimantan : 800Bontang MW HALMAHERA Sorong Attaka Tunu Bekapai KALIMANTAN Samarinda Padang Pacific Manado Kuching Balikpapan Total Sulawesi : 650 MW Jambi SULAWESI Grissik Banjarmasin Palembang IRIA BURU SERAM Ujung Pandang Jakarta Semarang JAVA I Pagerungan N D O N E S I A MADURA Surabaya Total Jawa Bali : 18,500 MW Indian Ocean Bangkalan BALI SUMBAWA TOTALCAPACITY 24,000 MW FLORES LOMBOK SUMBA TIMOR AUSTRALIA ROADMAP OF NUCLEAR ENERGY DEVELOPEMENT 2000-2025 Establishment “Owner” Sosializatio of NPP 2000 Energy Planning with Inclusion of Nuclear Energy Konstruksi PLTN-2 Tender NPP 3&4 Tender NPP 1&2 2005 Decission Go for NPP Konstruksi PLTN-4 Operate NPP-4 Operate NPP-2 2010 Erection NPP-1 2015 2020 2025 Operate NPP-3 Operate NPP-1 Erection NPP-3 TARGET OF NATIONAL ENERGY MIX IN 2025 ENERGI (PRIMER) MIX NASIONAL TAHUN 2003 Gas bumi 26.5% Batubara 14.1% PLTA 3.4% Panas bumi 1.4% EBT Lainnya 0.2% ENERGI MIX NASIONAL TAHUN 2025 (SKENARIO BaU) ENERGI MIX NASIONAL TAHUN 2025 (SKENARIO OPTIMALISASI) Minyak bumi 54.4% Batubara 34.6% PLTMH 0.216% PLTA 1.9% Biofuel 1.335% Batubara 32.7% Tenaga surya 0.020% Panas bumi 1.1% Gas bumi 20.6% PLTMH 0.1% OPTIMALISASI PENGELOLAAN ENERGI PLTA 2.4% Panas bumi 3.8% Other 4.4% Tenaga angin 0.028% Fuel cell 0.000% Biomassa 0.766% Gas bumi 30.6% Nuklir 1.993% Minyak bumi 26.2% Minyak bumi 41.7% STUDY ON BIOMASS ENERGY POTENSIAL FOR ELECTRICAL POWER GENERATION BACKGROUND • Increasing demand of electricity, presently electrification ratio 0.53 • Need for decreasing the consumption of fossil fuel • High potentially available renewable energy sources: • Approx. 160.000 MW (excluding solar energy) • Only 5200 MW has been utilized • Approx. 45.000 MW biomass energy potential • Willingness of Indonesian Government and PLN to utilize the renewable energy sources POTENTIAL OF NEW & RENEWABLE ENERGY SOURCES IN INDONESIA NO ENERGY SOURCES POTENTIAL INSTALLED CAPACITY % 1 Hydro (Incl. small scale) 75.450 MW 4.264 MW ± 5,6 % 2 Geothermal 20.000 MW 802 MW ± 4,1 % 3 Alternative Energy Equivalent 50.000 MW 302 MW Solar 4,8 kWh/m2/day Equivalent ± 5 MW Wind Equivalent 450 MW Equivalent ± 0,5 MW Biomass Sea wave 10 – 35 MW per Km coast length PLN FUTURE PLAN Tonny Agus, Deputy Director for Primary Energy, Workshop on Biomass for Sustainable Electric Power Generation, March 1, 2005 1. To empower current PLN renewable energy generator 2. To build renewable energy power plant based on current studis 3. To construct commercially potential renewable energy map 4. To study the renewable energy feasibility, technically and economically, to replace fossil fuel energy 5. To look for economically funding source RENEWABLE ENERGY DEVELOPMENT POLICY Tonny Agus, Deputy Director for Primary Energy, Workshop on Biomass for Sustainable Electric Power Generation, March 1, 2005 Ministry of Energy and Mineral Resources Regulation No.1122 K/30/MEM/2002 about Small Scale Power Plant (up to 1000 kW) has already been published -- updated to 15 MW Developer has to fulfill technical and operational requirement of local PLN If future development location has already been studied by PLN, further discussion with fair partnership spirit has to be held PLN is supporting the developer which will develop the small scale power plant potential as long as fulfilling the technical and operational requirement of PLN It is preferable for PLN that the capacity can be flexibly increased, for example from 1000 kW to 10.000 kW The consequence is that the Ministry Regulation may be revised. Ministry of Energy and Mineral Resources Regulation No. 1122.K/30/MEM/2002 About Small Scale Power Plant (scattered PSK) Operator : Small scale business (as shown in UU No.9, 1995 ) Energy Sources : Renewable Energy (wind, sun, mini/micro hydro, waste, geothermal, etc.) Capacity : max. 1 MW/power plant ------ currently is updated to 15 MW Location : reachable by PLN network on medium/low voltage (on-grid) Electric power selling price as shown in paragraph 13 Ministry of Energy and Mineral Resources Decree No. 1122.K/30/MEM/2002, are : a. 0.8 times HPP medium voltage if interconnected to Medium Voltage Network b. 0.6 times HPP low voltage if interconnected to Low Voltage Network STUDY ON BIOMASS AS ALTERNATIVE ENERGY FOR ELECTRIC POWER PLANT Survey on Biomass Energy Potential Workshop: Inputs from related institutions Output: Biomass Energy map Evaluation on financial assistant scheme Evaluation on Biomass Utilization Technology Data and information Collection Comparative Study Analysis Design requirement of Biomass Power Generation plant (PLTBM) Business Plan of PLTBM Policy and Regulation Required Data base for FS Coconut waste Rice waste Oil palm Sugar cane waste Wood waste Total biomass potential Potential of electricity from biomass Highest of biomass for electricity Highest of biomass for electricity Comparison of Exisiting Electric Power Generation and Biomass Electric Energy Potential Potensi Pembangkitan Listrik Biomassa Pembangkitan Listrik PLN 2002 70000 60000 50000 GWh 40000 30000 20000 10000 0 Maluku Papua Bali NTB NTT Sulaw esi Kalimantan Sumatera Jaw a Comparison of Existing Install Capacity and Biomass Electric Energy Potential Potensi Kapasitas Listrik Biomassa Kapasitas Terpasang PLTA 2002 Kapasitas Terpasang PLTGU 2002 Kapasitas Terpasang PLTD 2002 Kapasitas Terpasang PLTG 2002 Kapasitas Terpasang PLTU 2002 Kapasitas Terpasang PLTP 2002 6000 5000 MW 4000 3000 2000 1000 0 Maluku Papua Bali NTB NTT Sulaw esi Kalimantan Sumatera Jaw a THANK YOU