Informations on the implementation of the PAC 31st meeting

Download Report

Transcript Informations on the implementation of the PAC 31st meeting

PAC on PARTICLE PHYSICS
32nd meeting, Jan 14-15, 2010
Recommandations and work towards the
optimisation of the research programme
Egle Tomasi-Gustafsson
Scientific Council, Dubna, 18/II/2010
18/II/2010
Egle Tomasi-Gustafsson
1
II. General recommendations on the implementation of the
“Programme of the Scientific Research and Development of
JINR” in the field of particle physics (2003–2009) and on
the JINR Programme of Particle Physics Research proposed
for 2010–2012
The PAC takes note of the reports presented by A. Sorin,
Deputy Director of the Bogoliubov Laboratory of Theoretical
Physics, V. Kekelidze, Director of the Veksler and Baldin
Laboratory of High Energy Physics, A. Olshevskiy, Director of
the Dzhelepov Laboratory of Nuclear Problems, and by
V. Ivanov, Director of the Laboratory of Information
Technologies. The PAC endorses the proposed main lines of
the JINR Programme of Particle and Relativistic Nuclear
Physics Research for the period 2010–2012 in accordance
with the new seven-year JINR development plan.
18/II/2010
Egle Tomasi-Gustafsson
2
III. Recommendations on the progress towards
realization of the Nuclotron-M project
The PAC takes note of the report on the status of
the Nuclotron-M project, presented by JINR Deputy
Chief Engineer G. Trubnikov, and appreciates the
significant progress in upgrading the VBLHEP
accelerator complex and the rigorous
implementation of the work schedule. The PAC is
pleased to note that during the autumn run the
obligations concerning the research programme
were fulfilled and the stable operation of the
accelerator complex at high intensity was
demonstrated.
Beam for physics
18/II/2010
Egle Tomasi-Gustafsson
3
Position
Required
Achiev. by 2007
Status by 2009
%
Ion source
124Xe44+ (2T)+new 6T
56Fe28+
84Kr28+ & 124Xe44+
95
Linac
Vacuum+optimization
New modulator and DT
No
No
Ready
Under manufacturing
80
10
RF system
Noise reduction
Automatization
Adiabatic capture
Feedback with beam
1
no
no
No
1/15
partially
yes
No
95
70
80
10
Ring vacuum, Torr
5*10^-10
5*10^-7
2*10^-9
85
Field (energy)
2T (6 AGeV)
1T (2.2 AGeV)
1.4 (3.8 AGeV)
70
Intensity
10^11 (d), 10^8 (i)
2*10^10 (d)
5*1010 (d), 5*107 (Li)
50
Power supply
Serial connection of
magnets, new EES,
MF control
old (< 1Tesla)
|| connection
1 Gs prescision
Serial connection
ESS - 90% ready
0.1 Gs
70
90
99
New quench
protection system
200 sensors
200 old
New prototype tested
30 - for run
30
Slow extraction
system (efficiency)
Extraction at 6 AGeV
Max energy 2.2
AGeV (95%)
Prototype for 6 AGeV
ready (95%)
80
Control, diagnostics Beam losses <10%
70-80% losses
30-40% losses
50
Cryogenics
Safety + stability
Worked-out
Ready
99
18/II/2010
Run
stability
6 months/year
2 runs x 1month
4
70
Egle Tomasi-Gustafsson
3 runs x
1month
Injector (LU-20) modernization
It was planned for 2009:
- dismounting of the linac vessel and
geodethy of all 59 druft tubes –
performed (3 month);
- new power supplies for corrector
magnets; commissioning of the new
synchronization system for all linac
control channels – done;
September 2009
- exchange of some vacuum chamber
parts of the injection channel (new fast
vacuum shutters) – done;
Achieved deutron current from laser
source >5 mA (before was 3 mA)
- 2-3 dedicated beam runs – 4 done;
G.Trubnikov
18/II/2010
Egle Tomasi-Gustafsson
5
Beam slow extraction system at maximum energy
(V. Volkov)
Works on design of new high voltage power supply for the electro-static septum in the LHEP
design bureau were completed in autumn 2008. Prototype of such system was constructed and
successfully tested up to 140 kV (existing septum power supply allows up to 110 kV only – it
corresponds to 2,3 GeV/n extracted beam).
Now all the elements of new power supply had been manufactured at LHEP workshops and
this system is assembled – 03 Jan 2010: tested up to 220 kV. We plan to install it in the slow
extraction sector in order to provide experiments on beam extraction at energy 4 GeV/n during
next Nuclotron run.
18/II/2010
Egle Tomasi-Gustafsson
6
G.Trubnikov
V. Recommendations on the progress towards
the NICA Technical Design Report
The PAC takes note of the report on the
preparation of the NICA Technical Design
Report, presented by JINR Deputy Chief
Engineer G. Trubnikov, and notes the
substantial progress in this work.
Версия 04/12/09
Ускорительно-накопительный комплекс NICA
(Nuclotron-based Ion Collider fAcility)
ТЕХНИЧЕСКИЙ ПРОЕКТ
том I
18/II/2010
Egle Tomasi-Gustafsson
7
Introduction:
Introduction:
NICANICA
Layout
scheme
& Main& Elements
layout
Collider 2T
C = 336 m
KRION-6T & HILac
Synchrophasotron yoke
“Old” linac
MPD
Beam
transfer
line
2.3 m
Nuclotron
4.0 m
Booster
18/II/2010
Egle Tomasi-Gustafsson
Existing beam lines
(Fixed target exp-s)
Spin Physics
Detector (SPD)
8
G.Trubnikov
MAC meeting (12-13 January 2010)
Machine Advisory Committee participants:
B.Sharkov (ITEP/FAIR)
P.Belochitskii (CERN)
S.Ivanov (IHEP, Protvino)
M.Steck (GSI)
A.Fedotov (BNL)
S.Nagaitsev (FNAL)
V.Lebedev (FNAL)
A.Zlobin (FNAL)
P.Zenkevich (ITEP)
T.Katayama (Japan)
18/II/2010
Egle Tomasi-Gustafsson
9
IV. Recommendation concerning the report from the Chairman
of the Nuclotron-M/NICA Machine Advisory Committee
The PAC takes note of the report by the Chairman of the
Machine Advisory Committee (MAC) for the Nuclotron-M/NICA
accelerator complex, Prof. B. Sharkov and recognizes the
significant progress in the realization of the Nuclotron-M
project. The PAC expresses its gratitude to the MAC Chairman,
members and experts for fulfilling an extremely important role
in the project realization. The PAC especially notes that the
expertise performed by the MAC has confirmed the feasibility
of the NICA project. The PAC recommends preparing a project
on realization of the next stage of the NICA complex
construction and presenting it at a future PAC meeting.
18/II/2010
Egle Tomasi-Gustafsson
10
VI. Recommendations on the progress towards the MPD
Conceptual Design Report
The PAC takes note of the report on the preparation of the
MPD Conceptual Design Report, presented by VBLHEP
Director V. Kekelidze.
The PAC notes with interest the progress of work on the MPD
conceptual design and supports the basic ideology of the
construction of the detector which will be unique in
acceptance and efficiency for the registration of charged
hadrons in the energy field under the study. The PAC supports
the strategy of stage-by-stage construction of this detector
and notes the substantial progress in scrutinizing all the basic
elements. The PAC recommends preparing a project of the
first-stage realization of the multipurpose set-up MPD — the
starting stage –– and presenting at the next meeting of the
PAC.
18/II/2010
Egle Tomasi-Gustafsson
11
VII. Recommendations on the progress
towards the NICA White Paper
The PAC takes note of the report by BLTP
Deputy Director A. Sorin on the ongoing
preparation of the white paper for the NICA
programme on the mixed phase and spin
physics. The PAC notes the progress achieved
in this direction and recommends continuation
of the work to elaborate a competitive
research programme in view of its
complementarity with studies planned at
CERN, RHIC, and FAIR.
18/II/2010
Egle Tomasi-Gustafsson
12
A. Sorin
Editorial board:
D. Blaschke
D. Kharzeev
A. Sissakian
A. Sorin
O. Teryaev
V. Toneev
I. Tserruya
40 scientific centers
86 authors
16 Countries (8 JINR members)
• Phases of dense QCD matter and
conditions for their possible realization
• Characteristic processes as indicators
of phase transformations
• Estimates of various observables for
events
• Comparison to other experiments
Round Table Discussion IV
Searching for the mixed phase of strongly interacting
QCD matter at the NICA: Physics at NICA (White Paper)
JINR (Dubna), September 9 - 12, 2009
http://theor.jinr.ru/meetings/2009/roundtable/
http://theor.jinr.ru/twiki-cgi/view/NICA/WebHome
18/II/2010
Egle Tomasi-Gustafsson
13
VIII. Recommendations for activities at JINR
related to the ILC
The PAC takes note of the report by JINR Chief
Engineer G. Shirkov on the progress for
ongoing developments at JINR related to the
ILC and recommends further participation in
this work.
18/II/2010
Egle Tomasi-Gustafsson
14
IX. Recommendations on the first experience of JINR
physicists in data taking in the LHC experiments
The PAC takes note of the reports on the first experience
of JINR physicists in data taking in the ALICE, ATLAS and
CMS experiments. The PAC congratulates these teams
for having fulfilled their obligations in the construction
of the detectors and the commissioning phase. The PAC
highly appreciates the presentation of the first physics
results which witness the overall good operation of the
detectors. The PAC recognizes the LIT important
contribution to the first data analysis phase.
18/II/2010
Egle Tomasi-Gustafsson
15
X. Recommendations for new projects (I)
The PAC suggests supporting JINR’s participation in the physics
research programmes at the LHC on the basis of a five-year term.
The PAC recommends approval of the projects “JINR’s participation
in the physics research at the LHC. ATLAS, ALICE, CMS” for
execution until the end of 2014.
The PAC recommends that sufficient resources be allocated for the
participation of JINR in the data taking and analysis, in order to
match the strong commitment deployed during the construction
phase with a corresponding effort during the physics and analysis
phase. The PAC looks forward to receiving regular reports on these
activities at its future meetings.
18/II/2010
Egle Tomasi-Gustafsson
16
X. Recommendations for new projects (II)
2. The PAC recommends approval of JINR’s participation in the
project “STAR at RHIC” until the end of 2012. The PAC supports
the participation in the beam energy scan and in the polarized
proton-proton data programme which will provide world-class
results and represent an important training ground for the NICA
collider project.
(Results: Z-scaling, strangeness, critical point)
3. The PAC appreciated the ongoing activity at JINR and
recommends approval of JINR’s participation in the project
“PANDA. Experiments at FAIR” until the end of 2014, considering
the time scale of the project.
(Magnet, DIRC and Muon mini-drift tubes)
18/II/2010
Egle Tomasi-Gustafsson
17
XI. Recommendations on the activities previously
approved for completion in 2009 and proposed for
continuation
1. The PAC takes note of the report on JINR’s
participation in the HADES project, and highly
appreciates the results obtained in this experiment
and recommends continuation of this activity until
the end of 2012.
2. The PAC takes note of the report on the theme
“Development of high-precision straw detectors”,
regards this work as promising and in great demand,
and recommends continuation of this activity until
the end of 2012. (ATLAS, COMPASS, OKA, SVD, NICA, CBM…)
18/II/2010
Egle Tomasi-Gustafsson
18
XII. Recommendations on the projects previously
approved for completion in 2009 (I)
•
NA48 project (report)
•
OKAPI project
continue the work under the theme
“Study of Rare Charged Kaon Decays in Experiments at the CERN
SPS (NA62 project)”.
•
•
NIS project : continue the research work under
the new project HyperNIS.
ALPOM project : continue the research work under
the new project ALPOM-2.
18/II/2010
Egle Tomasi-Gustafsson
19
• XII. Recommendations on the projects previously
approved for completion in 2009 (II)
•
•
•
•
•
•
•
•
•
STRELA completed data taking .
pHe3 project
.. continue the research work under the DSS project.
LNS project
DELTA-SIGMA : needs the polarized target and Nuclotron beams of
required parameters.
DELTA-2
MARUSYA
CLIC
“Development and introduction of compact electron and ion
accelerators for applied purposes”.
E391a
18/II/2010
Egle Tomasi-Gustafsson
20
XIII. Poster presentations by young scientists in the
field of particle physics research
The PAC appreciates the poster presentations by young
scientists and recommends that this form of
presentations be included in the agenda of the future
PAC meetings.
Next meeting : June 21-22
18/II/2010
Egle Tomasi-Gustafsson
21
Thank you for attention
18/II/2010
Благодарю вас за внимание
Egle Tomasi-Gustafsson
22
V.A.Bednyakov, ATLAS
First data: a perfect detector performance
Monitoring data quality to spot “problematic” channels
N.Javadov, I.Pisarev
data09_900GeV run 140571 (~13 hours)
time slices
time slices
data09_900GeV run 140541 (~11 hours)
HEC C noise (MeV)
HEC A pedestals (MeV)
Monitoring overall detector stability
18/II/2010
time slices
Egle Tomasi-Gustafsson
time slices
23
Physics exploitation of ALICE has started for good !
Phase 1: rediscovering the standard model
(QCD in the case of ALICE)
The average number of charged particles
created perpendicular to the beam
in pp collisions at 900 GeV is:
dN/dh = 3.10 ± 0.13 (stat) ± 0.22 (syst)
National Geographic News (4 Dec.)
‘….a machine called ALICE....
found that a (!) proton-proton collision
recorded on November 23
created the precise ratio of
omatter and antimatter particles
predicted from theory..’
18/II/2010
Egle Tomasi-Gustafsson
24
A. Vodopianov
First CMS Physics Results: Charged
Multiplicity Average p
T
Charged Particle Multiplicity
correlated systematic error
CMS 2009 Preliminary
I.A.Golutvin, S.V.Shmatov, A.V.Zarubin
25
18/II/2010
Egle Tomasi-Gustafsson
Physics tasks for MultiPurpose Detector
 event-by-event fluctuation in hadron productions





(multiplicity, Pt etc.)
HBT correlations indicating the space-time size of the systems
involving π, K, p, Λ
directed & elliptic flows for various hadrons
multi-strange hyperon production:
yield & spectra (the probes of nuclear media phases)
photon & electron probes
search for P- & CP violation as a charge asymmetry
should be studied for different ions (from p to Au)
by scanning in b & energy (in the range SNN = 4 - 11 GeV/u)
V. Kekelidze
18/II/2010
Egle Tomasi-Gustafsson
26
3D view of the MPD (conceptual design)
3 stages of putting into operation
2-nd stage
IT,EC-subdetectors
Forward
spectrometer-B
3-d stage F-spectrometers
(optional ?)
1-st stage
SC Solenoid
barrel part (TPC, Ecal, TOF)
+ ZDC, BBC, S-SC, …
V. Kekelidze
18/II/2010
Toroid
Egle Tomasi-Gustafsson
27
Working Groups











TPC prototyping
Magnet
ECal
TOF
Straw wheels
ZCal
CPC
FFD
BBC
DAQ
IT
V. Kekelidze
- Yu.Zanevski et. al.
- A.Kovalenko, V.Borisov et.al.
- I.Tyapkin, A.Olchevsky et.al.
- V.Golovatyuk et.al.
- V.Peshekhonov et.al.
- A.Kurepin et.al.
- Yu.Kiryushin et.al.
- V.Yurevich et.al.
- R.Zulkarneev et.al.
- V.Slepnev, S.Bazylev et.al.
- Yu.Murin, V.Nikitin et.al.
The CBM-MPD SST consortium:
GSI - JINR – IHEP - …
in IT silicon module development
is well progressing
18/II/2010
Egle Tomasi-Gustafsson
28
JINR Remote Operation Centre
Monitoring of detector systems
Data Monitoring / Express
Analysis
Shift Operations (except for run
control)
Communications of JINR shifter
with personal at CMS Control
Room (SX5) and CMS Meyrin
centre
Communications between JINR
experts and CMS shifters
 Coordination of data processing
and data management
Training and Information
18/II/2010
Egle Tomasi-Gustafsson
29
I.A.Golutvin, S.V.Shmatov, A.V.Zarubin
29
V.A.Bednyakov
ATLAS jobs in RDIG
Since January 2009
18/II/2010
Egle Tomasi-Gustafsson
30
Development and creation of a high-intensity polarized deuteron source
(V. Fimushkin)
We continue collaboration works with INR (Troitsk) on the development of the new high-intensity
polarized deuteron source, and signed an addendum for work prolongation in 2009. We plan to complete
TDR documentation in this year and start construction of some elements at INR.
Simulation, modeling and design of different elements of the future source are in active phase at
LHEP.
Experimental hall for the future test bench with that source is prepared at LHEP building 203A,
preparation electrical and water-cooling works were performed.
It is planned to purchase part of necessary vacuum equipment (TMN pumps) for the SPD realization
in 2009 – done.
18/II/2010
Egle Tomasi-Gustafsson
31
G.Trubnikov
New diagnostics (elliptical pick-up stations)
Aug’09
New (elliptical) pick-up station
prototype for Nuclotron
(GSI design).
Elliptical pick-up designed and
constructed at LHEP workshops
ready for cryotraining
18/II/2010
Egle Tomasi-Gustafsson
G.Trubnikov
32
Upgrade of the cryogenic supply system (Prof. N. Agapov)
HELIIMASH Chief Engineer
and LHEP Chief Engineer
“Wet”
turboexpanders (frequency 300000 turns/min)
18/II/2010
Egle Tomasi-Gustafsson
- 6 units were fixed by now
33
6. Cryogenic system
Modernized in framework of the Nuclotron-M project
23.12.09: We succesfully agreed with HELIIMASH to give the property
on screw compressor to JINR (scale of 1MEuro). We will put into
Reserve the piston compressors (youngest is made in 1978)
18/II/2010
Egle Tomasi-Gustafsson
34
G.Trubnikov
Engineering infrastructure development
- Large volume
of infrastructure
(fixing and
construction
works) was
performed in
2009
18/II/2010
Egle Tomasi-Gustafsson
35