Authoring Instructional Materials (AIM):
• Government-owned & managed system used by the Navy to design, develop,
update, manage, and integrate training content
• Provides automated conformance to standards (NAVEDTRA 130A/131A, ILE, &
RIT II) resulting in efficient, cost effective development & maintenance of learning
content
• Links learning requirements to performance standards
• Links learning content to Interactive Electronic Tech Manuals (IETMs) (**S1000D
& other formats)
• Automates identification and notification of potential learning content update
requirements based on performance standard & tech data changes
• Streamlines integration of changes into previous learning content baseline with
minimum impact (because built on relational database)
• Supports multiple output methods (paper, PDF, HTML, & SCORM conformant XML
formats)
AIM is a mature application & service provider supporting the development &
sustainment of 300,000+ instructional hours of formal Navy training content
SUB-TOTAL
SUB-TOTAL
673
542
889
76%
CNATT
670
81%
51,360
76,838
67%
209,417
358,572
58%
SLC
SUB-TOTAL
242
455
53%
23,171
29,683
81%
CENTER TOTAL
1,457
2,014
72%
283,948
465,093
61%
Big “3” Example
be
A
ct
iv
ity
ro
f
by co
tr urs
ad e
To
iti s s
ta
on u
ln
al pp
um
A or
IM te
b
d
Pe
er
of
co rce
co
ur nt
ur
se of
se
s A
s
no (AI IM
n- M- cu
A cu rri
IM r c
To
cu ricu ulu
ta
ln
rr lu m
ic m
um
ul a
um n
be
d
r
)
tr of
ai A
ni IM
ng
To
c
ta
ho ur
r
co l n
u
rs icu
ur um
lu
se b
m
s er
(
o
no AI f
n- M- ho
A cu ur
Pe
IM r s
rc
cu ricu for
en
rr lu al
to
ic m l
ul a
fA
um n
IM
d
)
ho cu
ur rri
s cu
lu
m
um
N
g
in
in
Tr
a
AIM-based Learning Content Usage*
CSCS
Others include:
•NSWC
•SPAWAR
•NMPT&E
•NNSY
•CPPD
•CNE
•CID
•CEODD
•CSS
*Data captured in 4th Quarter of FY07
AIM Management Organization
Functional Area
Functional
Functional Area
Area
Manager
Manager
Manager
OPNAV – N12
OPNAV
OPNAV
OPNAV
–– N00T
N79
(proposed)
Executive Steering
Committee
(ESC)
Functional
Requirements
Board (FRB)
Configuration Control
Board (CCB)/
Resource Sponsorship:
Surface/Air/Sub/NETC
Program
Manager
OPNAV Orlando
N75
NAWCTSD
Columbus TechnologiesPrime Support Contractor
System Support
Office (SSO)
NAWCTSD Orlando
AIM Historical Perspective
•
CNET drafts Operational Requirement (OR)
1981
•
NPRDC Conducts R&D
1981-87
•
NPRDC Awards R&D Contract
1987
•
CNO Establish Project Manager
1989
•
AIM MNS/Milestone 0 Approved
1990
•
Milestone I/II approved
1992
•
Initial version of AIM (UNIX) distributed
1993
•
Milestone III approved (Implementation)
1994
•
AIM System Support Office (SSO) at NAWCTSD Established
1994
•
AIM I Implementation
1996
•
AIM II Implementation
1997
•
Program Management Shift to NAWCTSD
1997
•
•
•
•
•
IETM Interface
SCORM Output Utility
SQL Server
Word as editor; IMI Library
AIM first GOTS SCORM Adopter
1998
2001
2002
2003
2004
•
•
•
•
•
Prototype LO Module; NMCI certification**
Navy ILE ILT authoring/maintenance tool**
Prototype Content Planning Module (CPM)**
NMCI Certification & Distribution of AIM LO Module**
CPM Operational**
**Key Components of Modernized AIM
2005
2006
2007
2008
2008
Program of
Record with
history of
continuous
improvement and
successful
adaptability in
meeting the
user’s changing
requirements and
technology
advances.
AIM Current Software Status
•
AIM I/II Rel 3.3
– Superseded Rel 3.2.1
– NMCI certified in May 08
– Pushed to NMCI end users in Jun-Jul 08
– Includes first version of Learning Object (LO) Module
– Central site Citrix Metaframe enhancements
– CMS Web service interface to CeTARS
• Content Planning Module (CPM) 3.0
– GAT conducted May 08
– Operational s/w posted Jun 08
AIM Software Plans - Modernization
• AIM I/II Rel 4.0
–
LO Module



Initial GAT conducted Jun 08
Significant additional functionality being coded now; in
work for Mar 09 delivery for testing
Anticipated NMCI push Jun 09
–
CPM
–
Significant additional functionality being coded now; in
work for Mar 09 delivery for testing
 Anticipated operational Jun 09
Interim builds available to support ongoing ILE projects
–
FRB-prioritized ACRs incorporated in LP/TG modules

AIM Software Plans – Modernization
(contd)
• AIM I/II Rel 4.1
– LO Module
 requirements define by FRB feedback on FRM
 planned delivery for GAT and NMCI testing in Mar ‘10
 anticipated NMCI push in Jun ‘10
– CPM
 requirements defined by FRB feedback on Functional Reqts
Matrix
 planned delivery for GAT testing in Mar ‘10
 Operational in Jun ‘10
– Interim builds available to support ongoing ILE projects
– FRB-prioritized ACRs incorporated in LP/TG modules
AIM Modernization Timeline
MODERNIZATION PLAN
Traditional
SYSTEM
Baseline through
April 2008
AIM I/II Rel 3.2.1
REQUIREMENTS
NAVEDTRA 130/131
(per FRB guidance)
Current
Situation
Transitional
System
Proposed
Solution
AIM I/II Rel 3.3
w/ LO Module
Distributed by
NMCI
May-June 2008
Transition to
AIM Modernization
AIM I/II Rel 4.0
May-Jun 2009
MODERNIZED
AIM SYSTEM
AIM I/II Rel 4.1
May-Jun 2010
ILE FUNCTIONAL
REQTS
(per ILE Content Dvlp
Hdbk, etc.)
ILE, DOD, CIO
TECH REQTS
(SOA, EDE,
.NET)
ILE
FUNCTIONAL
REQTS
(per FRB,,
etc.)
R&D
EFFORTS
(ISTDAS, etc)
Software Demo &
Discussion