LINK 2000+ - ATN Conference

Download Report

Transcript LINK 2000+ - ATN Conference

ATN 2001, London - 18 Sep 01
PETAL II Extension
Architecture, Integration and
Testing
Prepared by Martin Adnams/Isabelle Herail
1
ATN 2001, London - 18 Sep 01
PIIe End to End Target
Avionics
vdr
CMU
ATN
MCDU
AAL
B767
R ES
Rockwell Collins
vgs
ARINC
VDL M2
CPDLC Service
VIA
ATN and VDL Mode 2
VDL M2
ATN
R
MAASTRICHT UAC Control Centre
WAN
ATN
R
LAN
ATN
End
System
Eurocontrol
RPC
LAN
FEP/
Datalink
Server
FDPS
2
MAAS UAC
PIIe Region
ATN 2001, London - 18 Sep 01
The Players and the Systems
PETAL INTEGRATION TEAM (PIT)
Eurocontrol
Maastricht UAC (ATN/CPDLC
OPERATIONAL System)
Brétigny Experimental Centre
(ATN/CPDLC TEST Systems)
Experimental aircraft (QinetiQ BAC1-11)
American Airlines
4 Boeing 767ER with STC
Dynamic Test Pilots + Frank
Rockwell Collins
Avionics (CMU, VDR, MCDU)
Cedar Rapids Test Facility
ARINC
VDL Mode 2 and ATN routers
Annapolis Test and OPS centre
STNA
REIMS ACC Shadow Mode Operations
(ATN/CPDLC)
FAA
Build 1 – Miami Centre
4
ATN 2001, London - 18 Sep 01
The Best Laid Plans ….





Integrated Schedule - PIT Maintained
Stream 1 - Test PIIe Service End to End via
ATN, Fly BAC 1-11 with Satcom against MAAS
Stream 2 - Same Again, Add the new element,
VDL Mode 2
Stream 3 - Same Again, Add Production
Avionics from Rockwell-Collins
Certification Flight AAL 767
 Non Revenue Flights
 Revenue Flights
5
ATN 2001, London - 18 Sep 01
What Really Happened
“PLANNING IS VITAL, PLANS ARE IRRELEVANT”
CERT
Non-Revs Europe
Testing
Effort
Stream 2
Stream 3
Stream 1
1st Op Flight
Crunched
Rev Flights
ATN/VDL Testing
1998
Sep 00
Mar 01
May 01 Jul 01 Oct 2001
6
ATN 2001, London - 18 Sep 01
A Tight Schedule
EUROPE
USA
AAL
767s
RC
Cedar
Non Rev - 26 Jun
OPS - 27 Jul
g-g
REV - 20 Aug
R
CMU+AGTS
ATN/V8208
Mar 01
VDL/AGTS AOA/AVLC
Feb 01
VAN
BAC1-11
CMU+VDR
CMU+VDR
DERA
AAL
a-g
R
Dallas/Tulsa
767s
Pre-CERT
Tests
CERT
FLIGHT
through
April
end MAY
01
FAA
MIAMI
MAAS
g-g
R
ARINC
Annap.
Ongoing
g-g
R
Tests - 02 May
ARINC-Euro, ATN interop
Mar 01
g-g
R
STNA
Tls
g-g
R
Flying - 10 May
EEC
Bretigny
ARINC ATN/VDL
May 01
7
ATN 2001, London - 18 Sep 01
What is Left To Do





Detailed analysis of logs/traces from 20+
hours BAC1-11 flights and 21 AAL Non-REV
flights out of CDG
Lessons Learned will be documented
– Network Tuning is essential
Those that affect standards will be injected
into AEEC/ICAO/RTCA
There are Technical Issues to resolve
– Unexpected NOCOMM (coverage/handoff)
– Performance optimisation
Resolution is NOT in the scope of PIIe
8
ATN 2001, London - 18 Sep 01
What Was Achieved

An Integrated Operational System with
MAASTRICHT UAC supporting AAL
Commercial Flights

A Major Milestone in Datalink made
possible by dedicated teams in American
Airlines, Rockwell-Collins, ARINC, STNA,
Eurocontrol Maastricht and Eurocontrol
Brétigny
9
ATN 2001, London - 18 Sep 01
Isabelle Herail
EEC Brétigny
10
ATN 2001, London - 18 Sep 01
EEC Integration Role
STREAM 1
PSF/MADAP over AMSS
VDL M2 in Europe
RC CMU/Ground ES
Bac 1-11/AAL 767 flights
END to END over X.25
EEC
ATN
LAB
Europe/ARINC USA
VDL M2
Dallas flights Certification
Network Intercon.
RC CMU/Ground ES
END to END over VDL M2
11
ATN 2001, London - 18 Sep 01
Petal IIe End to End - Stream 1
Avionics
AMSS
adsu
FMS
Arinc 429
DLT/HMI
PSF
TES
TAR/TTS
ATC
BAC 1-11
ges
CPDLC Service
VIA
ATN and AMSS
AMSS g-g
Network
a-g
R
Maastricht UAC Control Centre
WAN
ATC
g-g
R
ATN
ES
LAN
Eurocontrol
RPC
LAN
FEP/
Datalink
Server
FDPS
12
ATN 2001, London - 18 Sep 01
Stream1/End To End Testing
Ground
Air
PETAL/
FITAMS
DLT
TES
TAR-TTS
TES
TAR-TTS
DLT
PSF
TES
TAR/TTS
PSF
DERA BAC 1-11
Inmarsat
EEC Bretigny
A/GBIS
ProATN
MADAP
SITA X.25 WAN
CMU Simulator
P2FEP
Collins Cedar/Rapids
GBIS
ProATN
GES
ProATN
Maastricht UAC
HMI
Test . Appli.
GES
Aussaguel
GES
CHARME
GBIS
ProATN
STNA Toulouse
13
ATN 2001, London - 18 Sep 01
Air side Service Testing

End to End Service Tests Rockwell Collins
CMU/EEC Petal Ground Test Tool :Nov 00

End to End Service Tests Rockwell Collins
CMU/UAC Maastricht MADAP: Dec 00

End to End Service Level Tests Rockwell
Collins CMU/STNA application : March 01
14
ATN 2001, London - 18 Sep 01
Europe/US VDL M2 Link
UAC Maastricht
ARINC Lab, Annapolis
GG Bis
PROATN
GG1 Bis
R
R
APN
GG2 Bis
Other
UAC
ATN
systems
BT
TRANSPAC
SITA
R
Tunnel Adjacencies
GG Bis
PROATN
Other
EEC
ATN
systems
EEC, Bretigny
15
ATN 2001, London - 18 Sep 01
EEC Test Tools
to support Flight Trials

New Tool capability integrated in the
EEC Petal Ground Test Tool :
– Generation of short and long CPDLC
messages with automatic response from
the air side

Objectives:
– Tuning of ATN TP4 parameters
– Evaluation of Airborne side performances
16
ATN 2001, London - 18 Sep 01
Support to CERT - Dallas flights

Production Rockwell Collins CMU End to End
Testing:
– grounded AAL 767s in Dallas
– flight trials Dallas/Tulsa
– against EEC and UAC Maastricht : End
March/April 01

Prep Cert flights Dallas/Tulsa with EEC and
UAC Maastricht : End April/May 01

Certification Flight : 29th May 01
17
ATN 2001, London - 18 Sep 01
European Architecture
Cisco
PIIe Op
connect X25
x25
GG
Bis
PROATN
ES
GG Bis
PROATN
switch
P2FEP
FDPS
UAC/Maastricht
AGR
AGR
ARINC
Network
x25
X25
switch
GG Bis
PROATN
TAR/TTS
TES
Ground
Test
Tools
EEC/Bretigny
GG
Bis
x25
X25
switch
GG Bis
PROATN
Charme
ES
STNA/Toulouse
18
ATN 2001, London - 18 Sep 01
Validating ATN/VDL M2 in Europe
DERA




CMU/MCDU and VDR “palette mounted” in DERA Van
for VDL Checkout - May 01
20 hours flight with CMU/MCDU and VDR Installed on
BAC1-11 - From June 01 until start August 01
CPDLC exercised against EEC test tools plus
automatic traffic generation
Collecting output information from air and
ground sides for post analysis:
– VGS Hand-off’s ! VGS Coverage boundaries !
VGS Coverage overlap !
– Air side performances
19
ATN 2001, London - 18 Sep 01
NON-Revenues flights




Four AAL 767s Rockwell Collins CMU equipped
at CDG
21 flights from start of July until mid of August
01
CPDLC exercised against EEC test tools and
UAC Maastricht. Automatic traffic generation for
post analysis of air and ground registered traces
CPDLC Op. UAC Maastricht and STNA
(shadow mode) with external CPDLC transfers
exercised between both
20
ATN 2001, London - 18 Sep 01
ATN Progress !

Successful Non-Revenues flights continued by
US/Europe Revenues flights with UAC
Maastricht CPDLC exchanges in
inbound/outbound VDL M2 coverage

MAJOR progress in implementation of
Air/Ground Datalink thanks to real good coordination and motivation between all partners