Transcript Document

Development of new
technologies for accelerators
and detectors for the Future
Colliders in Particle Physics
URL
2009-05-08 Barcelona
1
Working Plan for future Colliders
• Off-detector and transfer electronics
– Module controller (UB)
ILC Santiago 2008
• Design of this module is to be done closely with
interconnection and data transfer.
– Interconnection and data transfer.
• Data transfer rate from ASIC to module controller and finally
to readout and off-detector electronics can be as high as
20GB/s if occupancy is high and data sparsifying is not
possible [ILC-RDR2007].
• Physical connections: optical fiber or LVDS serialization.
– Objective: reduce noise, cabling and connectors.
– Study of EMC and signal integrity required.
• Task is closely related to System Integration and Engineering.
2009-05-08 Barcelona
2
Working Plan for future Colliders
• Off-detector and transfer electronics
– DAQ:
ILC Santiago 2008
• Design and test of a stand-alone portable setup.
– Same setup for Lab and testbeam.
• FPGA-based dedicated boards connected to PC for analysis.
– VHDL FPGA firmware.
– Acquisition and analysis software on PC.
– Testbeam preparation:
• Adaptation boards for signal format/level conversion.
• Overcome limitations of available facilities.
• Real-time data analysis to allow in-site test decisions to better
profit from available beam characteristics.
2009-05-08 Barcelona
3
Working Plan for future Colliders
• DHP for Belle II
DHP Meeting UB 2008
– SEU protection for memory cells (Hamming
correction or others…)
• FPGAs -> URL
• ASIC -> MPI (Andreas)
– Interface DHP-DHH and DHH-back-end electronics
• To be done in close contact with KEK (URL)
• Gigabit TX (physical, coding, FEC…)
– FPGAs -> URL
– ASIC -> U.Bonn
2009-05-08 Barcelona
4
Working Plan for future Colliders
• Project Status:
DEPFET officially approved for Belle II !!!
KEK Meeting 2008
– But geometry of beam pipe and cooling system not
decided yet
• Will affect number and size of modules
• …which in turn will affect data rate
– Must not make strong assumptions, find flexible
solution that can be adapted to either outcome
• E.g. serializing ratio, channel coding
– Fortunately, we are in the FPGA part
2009-05-08 Barcelona
5
Working Plan for future Colliders
Ringberg 2009
• Better understanding of mechanical issues,
cooling.
• But nothing fixed yet, number of pixels and
readout time not decided  data rate
unknown.
• Must be very flexible, foresee different options.
2009-05-08 Barcelona
6
Current Status @URL
• System level integration on Belle II @KEK
– Physics and overall
• Participation on meetings and following discussions
– Radiation dose study
• Will affect FPGA family selection, code selection, etc…
• Testbeam @ CERN (July’2009 ?)
– Willing to participate.
• Great opportunity to connect to DEPFET people and take a
global system picture.
• But… very few manpower on our group.
2009-05-08 Barcelona
7
Current Status @URL
• Gigabit TX
– First Tests on LVDS TX
• Very FPGA dependent (Stratix w/o DPA, Stratix II ok, Stratix
II+ GX version may be required).
• Parameter tuning is critic: lots of things to be understood.
1 Gbps on Stratix II GX done
2009-05-08 Barcelona
8
Current Status @URL
• Gigabit TX
– Development board acquisition
• Transceiver Signal Integrity Development Kit, Stratix II GX Edition
– Preparing lab setup for BER test (with perturbations)
– Protocols
• Serial RapidIO (up to 3.125Gbps)
• Gigabit Ethernet
• ...
2009-05-08 Barcelona
9
Current Status @URL
• SEU Protection & FEC codes
– SEU Protection for memory cells
• Hamming correction implementation cost on FPGAs
• FPGA vendor and family comparison considering
radiation dose, system performance, etc… (Altera, Actel,
Xilinx…)
– Coding and FEC cost and alternatives
2009-05-08 Barcelona
10
Current Status @URL
• System integration on FPGAs
– NIOS II evaluation and setup
• Useful on lab setups and
prototyping
– Firmware development
• Defining collaboration with U.Giessen
2009-05-08 Barcelona
11
The End
2009-05-08 Barcelona
12
Working Plan for future Colliders
• Planning
2010
2011
ILC Santiago 2008
2009
Test setup
• Lab setup
• EMC
• Digital links
• PCB Design
• VHDL firmware
• Signal integrity
• Test
2009-05-08 Barcelona
Interconnection and data transfer
DAQ (study, HW development, SW)
• Testbeam study
• PCB Design
• VHDL firmware
• Analysis SW
• Test
13