Cabin Equipment Interfaces Subcommittee Summary Report

Download Report

Transcript Cabin Equipment Interfaces Subcommittee Summary Report

Cabin Equipment Interfaces
Subcommittee (CEI) Meeting
Agenda
Dale Freeman, NWA, Chairman
February 21-23, 2000
New Orleans, Louisiana
CEI S/C Meeting Agenda


Introductions/Administrative Details
Objectives
•
•
•
•
•
Review Draft 3 of Supplement 3 to Part 1
Discuss Proposals for Draft Suppl to Spec 628, (Parts 2,3,4A,5&6)
Review Connector W/G Activities (Parts 4A, 5 & 6)
Review Draft 2 of Project Paper 628 (Part 7) Cabin Cooling
Review Input for Draft 3 of Project Paper 628 (Part 8) Availability
CEI S/C Meeting Agenda
(Day 1)
2000 CEI, CWG & WAEA TENTATIVE MEETING DATES/PLACES
COMMITTEE
CWG
STATUS
DONE
DATE
JAN 26-28
PROPOSED PLACE
IRVINE, CA
WAEA TC
WAEA SEAT INT’G
SCHEDULED
SCHEDULED
FEB 16
FEB 17-18
ATLANTA, GA (DL)
ATLANTA, GA (DL)
CEI
SCHEDULED
FEB 21-23
NEW ORLEANS, LI
AMC
AEEC MID TERM
SCHEDULED
SCHEDULED
APR 15-17
APR 18
HAMBURG, GE
HAMBURG, GE
WAEA WS/TV MKT
WAEA TC
CWG
SCHEDULED
PROPOSED
PROPOSED
MAY
MAY 19
MAY 23-25
LONDON, UK
TBD
SANTA BARBARA, CA
CEI
PROPOSED
JUN 27-29
EUROPE*
WAEA TC
PROPOSED
AUG 11
TBD
CWG
PROPOSED
AUG 29-31
SEATTLE, WA
WAEA ANNUAL CONF
SCHEDULED
SEP 19-22
ANAHEIM, CA
CEI
PROPOSED
OCT 3-5
IRVINE, CA
WAEA TC
PROPOSED
NOV 10
TBD
AEEC G/S
SCHEDULED
NOV 13-16 VIENNA, AUSTRIA
* European locations under considerations: Dublin, Ireland, Toulouse, France, Rome, Italy
CEI S/C Meeting Agenda
(Day 1 - cont’d)

Part 5
•

Draft 1 Presentation
H/O _____
- Boeing
Part 2 - Seat Interfaces
•
•
•

- Wiring Design/Installation
Feedback from Seat Integration Meeting
SVD Space Envelope
H/O _____
Preparation of Draft 5 of Suppl 1
- Boeing
- MAS/RCI/AIRBUS
- AEEC staff
Part 4A - Daisy Chain Topology
•
Discuss Inputs for Draft Supplement 1
• D-Sub Connector
H/O____
• Butt-Joint Connector
- CWG
- CWG
(B-J Connector - Intermountable/Intermateable)
(Ad Hoc W/G Report)
• Smoke/Toxicity/Flammability
• Proposal for Less wires on OvHd and CEC Networks
• F/O Qual Test Results
• Power Factor Correction and 30 mA on GFI
• Preparation of Draft 1 of Suppl 1 to P 4A
-Airbus/Boeing
- Boeing
- Tyco/AMP
- Sony
- AEEC staff
CEI S/C Meeting Agenda
(Day 2)

Review Connector W/G Activities
•
Overview of CWG Activities
•
- Chairman, H/O_____
Part 6 - Fiber Optic Requirements Doc
–
•
•
•

Update Draft 3/Circulate (Circulated by AEEC 99-193/CEI-148)
F/S/T in Part 4A or 5?
Procurement Specs/EIA Support
Should Part 6 become a Detail Spec?
Part 7 - Cabin Equip Cooling General Spec
•
Summarize and Discuss Changes to Draft 1
• Commentary on Enabling/Disabling Internal Fan
• System Shutdown Definition

H/O_____
- Boeing, H/O____
- Sony, H/O___
- Suppliers
Part 8 - Availability Measurement Guidelines
•
Commentary on use of BITE
• Discuss Changes to Draft 2 (Circulated by AEEC 99-169/CEI-146)
- Sextant
- Sextant,
H/O_______
CEI S/C Meeting Agenda
(Day 2/3)

Part 1 - Review D3 of Supplement 3 to Spec 628
(Circulated by AEEC 00-007/CEI-152),
•
•

H/O _____
Noise Limits Update
Common VMU mounting
- AEEC staff
-Airbus/Boeing, H/O_____
Part 3 - Inputs for D1 of Supplement 2, Spec 628
• Ad hoc RSUD Revised Scope Proposal
- Boeing/Honeywell,
H/O____

Project Paper 485 - Finalize for Mail Ballot
Adoption Consideration
•
•

Prepare Draft 4 for Adoption
Additional Work on 485
Review Newly Assigned Homework
- AEEC staff
- RCI/MAS
- AEEC Staff