PowerPoint Presentation Template

Download Report

Transcript PowerPoint Presentation Template

Northstowe A Proposed New Town in Cambridgshire

South Cambridgeshire

District Council

South Cambridgeshire

District Council

History

• Proposed new town of Northstowe, promoted by Gallagher Estates and the new Homes and Communities Agency • The development is to be an “exemplar” in sustainability and has been labelled a “proto type Eco-Town”

Northstowe - Statistics Total development area: 432 hectares, divided into: • 189 hectares for residential development (population of 24,000, accommodated within 9,500 new homes) • 14 hectares of employment floorspace • 23 hectares for town and local centres • 22 hectares for schools (6 primary and 1 secondary) • The remainder of the land will primarily be open space with proposed sports grounds and play areas.

South Cambridgeshire

District Council

Midlands and the North

Northstowe Constraints

South Cambridgeshire

District Council

Ipswich and Felixstowe London and the South East

South Cambridgeshire

District Council

Northstowe - Low Emissions

SCDC will aim to: • Accelerate uptake of low emission fuels and technologies alongside design options, travel planning and public transport infrastructure proposals

Mitigation Measures

Highways Agency proposed improvements to the A14 • Widening • Parallel link road • Re-alignment Current status: informal consultation period prior to publication of draft orders expected Spring 2009 Expected construction phase: 2010 - 2015

South Cambridgeshire

District Council

Public Transport Initiative

Completion of the Cambridgeshire Guided Busway (CGB)      Proposed to link Huntingdon to Cambridge City Centre, following parallel route to the A14 along disused railway Stops will be located at all major settlements along the route Northstowe to be built to make full use of the CGB with 5 dedicated stops through the development Expected to cause a reduction in private vehicle journeys and improve the A14 Expected to open Spring 2009

South Cambridgeshire

District Council

Proposed Section 106

• Air quality monitoring within the existing, neighbouring communities • Creation of a community website focussed on pollution issues arising from the development

South Cambridgeshire

District Council

South Cambridgeshire

District Council

Proposed Section 106 cont.

• Provision of high quality cycle, pedestrian and equestrian routes • Travel plan framework and dedicated co ordinator • Interim measures to maintain A14 level of service • Construction traffic agreement

South Cambridgeshire

District Council

Proposed Section 106 cont.

• Transport telemetric system - development of real time passenger information • Provision of charging points for electric vehicles primarily for street cleansing trucks and mechanical sweepers

South Cambridgeshire

District Council

Development Timescales

• Revised Application expected - Jan 2010 • Grant outline permission – July 2010 (subject to s.106) • Design Code & first detail application – November 2010 • First Occupation - Summer 2011 (?)