I.M.H. Kft.
Capacity offer and
reference list
Certificated by MSZ EN ISO 9001:2001 standard
Certificatory: ÉMI TÜV. Bayern Kft. Certificate number: MS0224-023
Cg.01-09-863357
1
Table of contents
- Introduction
- Contacts
- Reference works in abroad
- Reference works at home
- Our company’s quality certificates
- Introduction of the references by
illustrations
2
Introduction
Company name: I.M.H. Kft.
Established: 1991.03.14.
Managing director: Szabó Ferenc Tel.: +36 30 946 6711
Centres: H-1072. Budapest, Rákóczi út 26. – Head office
H-2400. Dunaújváros, Kossuth Lajos út 16. – Engineering office
H-2457. Adony, Mátyás Király út 1.sz. – workshop
Main activities:
- Technological piping works,
- prepare, local assembling,
- power plant equipments installing
(condenser,gas engine,piping works),
- pressure tanks, maufacturing and installing,
- steel constuction manufacturing and installing.
- special machines manufacturing
Main execute subjects:
-
Power plant
Paper mill
Food mill
Public utilities and slop water plant
The IMH Kft come in to being et 1991, in Hungaryan owner ship. The head office can found in
Budapest Engineering office in Dunaújváros. The workshop is operating in Adony. The
workshop is a building with 800m2 area, near no6. road to Budapest direction before Mol
petrol station. IMH has 100 person employe. We have job in many country in Europe. Our
main job area have in Hungary but we have job in Belgium, Germany and France.
IMH’s team:
-
3 person Mechanical Engineer
8 person site manager, technican
Certificated welders
Technologic fitters
mechanic, serviser
3
Contacts
Adress: H-2401. Dunaújváros, Pf.:380
Telefon: +36 25 410 612 / +36 25 402 250
Fax: +36 25 403 759
Homepage: www.imhkft.hu
E-mail: [email protected]
Szabó Ferenc - Managing director
+36 30 946 6711
Körömi Tibor - Projekt manager
+36 30 902 9195
[email protected]
Juhász Gábor – Projekt manager
+36 30 947 1909
[email protected]
Cserepes Tibor - Projekt manager
+36 -30-5591-863
[email protected]
Szabóné Fetzer Ágnes – Economic manager
+36 30 947 1904
[email protected]
Dánielné Dobai Sára – Financial administrator
+36 25 410 612
[email protected]
4
A few reference projects in
Germany:
1. BAYRISCHE ZELLSTOFF GmbH – KELHEIM
A partial process installation in the new Organocell Paper
Mill from September 1991. We installed the pipeline bridge
system and the water line system (DN 80) completely as
well as the medium and small pressure steam pipeline system (DN 400500). The complete installation of the tanks, the laying of the whole steam
and condensate system was performed by us as well as the outfitting of
the digester and boiler buildings (pumps and connected systems) with the
installation of ca. 20 km stainless steel pipelines as the subcontractor of
Firma Krtalic GmbH.
2. STADTWERKE MÜNCHEN
The welding and fitting of the main carbon steel pipeline and the prefabrication and the
installation of the steel construction of the transfer shafts for the district heating network
system of Munich was carried out by us in cooperation with the company Broschier.
(DN 900, DN 800, DN 500, DN 300 pipes)
3. KÖNNERN DIAMANT SUGAR MILL
The pipeline installation tested to 100 % by X-ray of the boiler building in the sugar mill
was made together with Mannesmann GmbH. Furthermore the steam system, the cooling
water system, the pressure enhancing system and the steam connection of the turbines
were installed.
4. HOECHST AG – Kelheim
The prefabrication, installation and start-up of the complete carbon and stainless steel
pipeline system in the viscose factory with US-character. Installation and connection of
the process machines. Modification and connection of the old system to the new one.
5, Pro Papier-Burg
Steam and condensate pipe systems modification.
A few domestic references:
1. DREHER BREWERIES BUDAPEST
Works on the new steam and condensate pipeline network in the brewing house (DN 300).
Complete installation and welding of the stainless steel piping in the cellars 9-13 as well
as the laying of the complete piping for beer and the modification and designing of the
stainless steel systems in the brewing house, diameters DN 15 – DN 300.
Rebuild and process piping of the complete Ászok-cellar and
Welhoener-cellar as general contractor.
2. HUNGAROVIN Zrt. – Törley Sparkling Wine Factory
Total erection of the new sparkling wine department in accordance with
the new requirements of the food industry and laying
of the liquor pipeline to connect. Automating of the
grape processing department in Etyek.
5
3. Vintner Plant BALATONBOGLÁR – wine processing
Laying of a stainless steel transfer pipeline (DN 80),
designing and performing of the cooling system to the wine
tanks. Erection of machines, process piping, welding in the
new grape processing department as general contractor.
Performing of all relevant works in the new office buildings,
social rooms and plant restaurant.
4. STOLLWERCK Chocolate Factory – Budapest
STOLLWERCK Cookie Factory – Székesfehérvár. Machine erection,
performing of process piping and welding works of stainless steel with a
German supervisor.
5. Power plant Százhalombatta
Complete assembling of the whole steel construction of the heat converting boiler G2, erection
of the boiler covering, complete erection works of the piping bridge and the chimney.
Prefabrication and erection of 310 tons of steel construction. Process piping at the Mol Rt.
6. Power plant II. – Csepel
Erection work of the underground water pipeline for fire extinguishing. Erection works of the
main and auxiliary cooling water system (D = 1800mm).
7. ALCOA KÖFÉM – Székesfehérvár
Welding works on DN 250, DN 300 gas pipeline.
8. HUNGRANA Kft. – Szabadegyháza
Performing of works on the cooling system, Works on stainless steel pipelines (from DN 15
up to DN 400) in the starch and sugar plant. Fabrication, erection, piping and insulation
works of stainless steel storage tank with 1500 m3 volume as general contractor.
9. VINÁRIUM Rt. – Budapest
Fabrication, erection of 10 stainless steel wine tanks with 10 m3 volume each.
10. DUNAFERR Energiaszolgáltató Kft. – Dunaújváros
Installation of steam heat tracing pipeline (5/4”) to the mazut pipeline connecting the mazut
plant with the fleet of pumps.
11. DUNAPACK Zrt. – Packaging paper mill
Modification of the water system of the PM 3: Installing of the pipeline sections WA25.03.02;
WA25.03.04; WA25.03.03. Erection of the complete vacuum system,
automating and replacing of piping of the steam and condensate system.
12. ZALAKERÁMIA Zrt. – Tófej
Fabrication and erection of the complete dust exhausting system for the
material preparationand tile production line. (hot – solid)
6
13. FŐVÁROSI GÁZMŰVEK ÓBUDAI GÁZGYÁRA
Heat supply of the of the 25/6 bar pressure reducing station
for gas, the process piping with erection of equipments of
the mentioned project.
14. MAGYAR SUZUKI Zrt. – Esztergom
Paint release system, transport belt system with transfer
arms, complete technology for a WAX cabinet, Engineering
and erection of a pneumatic car lifting system.
15. EXTRALKO Kft. – Zalaszentgrót
Erection of a reference yeast plant.
16. AUDI – Győr
Performing of the piping works for pressurized air, cooling water and cooled water in
the shop G10.
17. MOL Zrt.
Prefabrication, surface protection and erection of a steel construction
standing close to the road Nr. 3 – Weight 321 339 kg (Annex 1).
18. MOL Zrt.
Prefabrication and erection of a steel construction and process erection
works for the block Nr. 700.
19. Nuclear power plant – Paks
Steel construction works for reinforcement against earthquake.
20. Power plant II. – Csepel
Connection of pipelines (D=400-1800) to the pump stations.
21. DUNAPACK Zrt. – Csepel
Complete connection of the drum filter, prefabrication and mounting of its cover.
22. ILZER Rt. – Monor
Extension of the stainless steel fleet of tanks – prefabrication, erection and process piping
of 16 fermentation tanks, 40 m3 each.
23. HUNGAROVIN Zrt.
– Steel construction works of the tank shop in Bodrogkisfalud.
– Prefabrication and erection of a steel construction holding a horizontal tank in Budapest.
24. DUNAPACK Zrt.
Performing of the machine erection and piping works for Project KAC 2001.
25. Vintner Plant BALATONBOGLÁR
- Performing of the machine erection and piping works for the process
- Lining of the inlet shaft with stainless steel plates
- Erection of a complete grape processing line.
7
26. Gyál – Industry Park ProLogis
- Process piping.
- Installing of sprinkler pipelines.
27. Richter Gedeon Zrt.
Extension of the cooling station and mechanical piping on
the main site.
28. Győri Keksz Zrt. – Székesfehérvár
Modification of dough mass pipelines.
29. AHM Motor Zrt. – AUDI Győr
Prefabrication and installing of the process pipelines for the brake benches
V6-V10.
30. Tököl
Assembling of a new paper machine, prefabrication and installing of its process pipelines.
31. CEWA PHILAXIA
Machine mounting, piping of the new shops 1 and 2.
32. AHM Motor Zrt. – AUDI Győr
Installing of the oil pipeline between G1 – G10.
33. UNILEVER-Diversey Lever
Fabrication of a stainless steel tank.
34. DREHER BREWERIES
- Prefabrication and erection of an external pipe bridge (stainless steel).
- Prefabrication and erection of an internal pipe bridge (stainless steel).
- Installing of stainless steel pipelines.
- Installing of water pipeline.
35. HUNGAROVIN Zrt.
Fabrication of a shop for fleet of tanks.
36. AGRO CHEMIE
Mounting works of the recrystallizing plant.
37. SIEMENS
Replacing of the channel for the boiler 12-13 underneath the draft II.
38. Művillgép Kft.
Moving works of a corrugator wet end from Budapest to Romania.
39. Neusiedler Rt. – Dunaújváros
- Prefabrication of the pipelines for the size press.
- Installation of the pipelines for the cationic size cooker.
- Prefabrication and installation of the new ventilation.
- Installation of the trim exhausting pipeline for the plotter paper
winder “Dusenbery”.
- Installation of the trim exhausting pipeline for the format cutter “WILL”.
40. DUNAPACK Zrt. – CSEPEL
- Prefabrication and installation of a chute.
- Replacing of drying cylinders.
- Modification of the kraft pulp line.
- Drive change wet end.
- COMBISORTER installation.
- Modification works on the waste system of PM 4.
8
41. DUNAPACK Zrt. – Dunaújváros
- Installation of the new ventilation system.
- Installation of the dosage systems for uric acid and
phosphoric acid in the waste water plant.
- Replacing of pipelines for the ALBIA cleaner plant.
- Repair of the process water pipeline for PM3.
42. Dr Bata Ltd.
Installation of the main pipeline for the new fungus plant.
complete
43. Richter Gedeon Zrt.
Installation of fleet of tanks for vegetable plant, installation of its
piping and its connection to the existing process.
44. Power plant in Kispest
Installation of storage tanks.
45. Neusiedler Rt – Dunaújváros
- Replacing of the headbox and its accessories, installation of the process pipelines.
- Installation of DUO-CLEANER under the hood.
- Installation and connection of the pulper discharge pumps.
- Installation of the PCC buffer tank along with its pipelines.
- Prefabrication and installation of pipelines for fresh water and reused process water.
46. DUNAPACK Zrt. – Csepel
- Controlled handling of sewages.
- Modifying of pump piping and the overflow of the funnel.
- Build-in of the ABS-agitator into the water vat of the funnel.
- Installation of the of the air outlet duct for PM6.
- Replacing of the steam and condensate system and its turn-off piping for PM6.
- Build-in of a new JOHNSON ORTHFLO suction box on the wire part of PM4.
47. DUNAPACK Zrt. – Dunaújváros
- Replacing of the headbox and its accessories, installation of the process pipelines.
- Process installation works of the double pump system.
- Fabrication of the pulping rotor VSAP50.
- Completing of the main stock pipe to the METSO headbox at the BIRD pressure sorter.
- Lining of concrete vat with stainless steel plates.
In the waste water plant:
- Adapting of the aeration basin 2 to the new process.
- Erection works, machine installations in the new sludge dewatering room.
48. R&M TS Duna Kft
- Prefabrication of thick wall stainless steel pipelines by isometric drawings.
- Prefabrication of 980 liter stainless steel tanks (2 pcs).
49. Hungarovin Zrt. – Henkell & Söhnlein Hungaria Kft.
Process piping for the sparkling wine storage and maturing shop and for the
sparkling wine processing and fill preparing shop.
50. Unicentrál Üzemszervíz Kft.
Process piping in the new plant of the printing office West in Veszprém.
51. Extension works in the print office in Veszprém
Machine installation and the relevant piping.
52. DUNACELL Kft. – Dunaújváros
Machine installation and piping works of the new
bleaching plant as general contractor.
9
53. Richter Gedeon Zrt.
Works on the aeration basin XXIV/2 on site in Dorog
applying steel quality 1.4301 as: DN 500
connection, its temporarily substitution, performing of its
reinforcement on site, process piping.
- Process erection works of the cooler building of the
Power Center. Prefabrication of supports and
brackets, other completion works (painting,
scaffolding, weld tests).
54. Gas engine – Székesfehérvár
Mechanical installation of 6 Jenbacher gas engines, electrical power
3,041 MWe, heat power 3,101 MW each.
55. Zenon Systems Kft.
- Process erection works of ultra-filtering plant with the capacity of
16 000 m3/day from the North-Hungarian Regional Water Works Ltd.
in Lázbérc.
- Piping works of industrial waste water plant with the capacity of 1 400 m3/day for
Tolnatej Rt. in Szekszárd.
56. Dunafin Kft. – Dunaújváros
- Installation of cooling water, steam & condensate, pressurized air, warm water and
drinking water systems.
- Prefabrication of drain piping.
57. VIB Systems GmbH – Dunaújváros
Installation of steam supply piping for steam blowing.
58. BVG GmbH – Dunaújváros
Fabrication and erection of stainless steel tanks for starch dosage and the installation of
the complete piping.
59, FAG bearing factory-Debrecen
Heaten and coolen systems piping works.
60,Mátra power plant Zrt.-Visonta
Block 4 and 5 Heating sstem piping works.
61, Székesfehérvár
Gas engine power plant piping works at Bakonyi road.
62, Richter Gedeon Zrt.
-Piping works in Dorog an a 3500m3/day capacity ultrafilter plant for a pool XXIV/2
connection line by 1.4301 steel material DN500 size pipe installation and reinforcing.
-Energy center cooling engineroom technology assembling works. Pipie supporten system,
pipe clamp manufacturing works and industrialworks(paint, scaffolding, welding
examination)
58, Gas engine- Székesfehérvár
6 pcs Jenbacher type, 3,041 MW electric and 3,101 MW Heat performance
Gas power plant mechanical assembling works.
59, Zenon Systems Kft.
- North-Hungaryan Region Water Authority Company’s ultrafilter plant
-(capacity 16000m3/day) technology execute works.
- The Tolnamilk factory’s 1400m3/day capacity industrial waste water claner
-piping works.
10
60, Biodiesel factory-Tatabánya
- Foam line built up.
- Technology pipeline built up.
61, Pét-Nitrogenfactory Zrt.
Dolomite pneumatic material transport executing works.
62, 31 ÁÉCS Kft.-Budapest
Mechanical execution works at 3000 m3 volume water tower.
63, Hankook-Yooyoung Engineering Hungary Kft.-Dunaújváros
- Curryng machines’s technology pipelines and pipe tunel execute works.
- 78 pcs Curing machines connection lines piping works.
- Ladders manufacturing to pipe tunel.
- 20 pcs TBM-Tire Building Machines pressur air connection lines piping works.
64, ISD Dunaferr Zrt.-Dunaújváros
Hotroll mil-Pushing furnace fresh air supply line piping works.
65, Dreher Zrt.-Budapest
- New watersoften building’s technology piping works.
- PET machine line CIP system installing
- CO2 system building up.
- Bottle plant’s new heating system build up with fresh air system.
66,Dunacell Zrt.-Dunaújváros
Whitening sytem piping work and equipments installing for straw processing.
67, Dreher Zrt.-Budapest
-Old water soften system demolution work and new water soften building’s technology piping
works.
68, Hamburger Hungária Kft.-Dunaújváros
- DN 250 steam pipeline, PM3 steam header piping works and PM7 new plant steam header
connection pipeworks.
- PM7 Steam and condense system technology pipe works.
- Power plant pipeline bridge A-B section steel construction works and installation.
- DN800 steam-DN150 condense line piping works.
- PM7 -Erection of centralized lubrication system.
11
Our company have the following
certificates:
- TMBF (Local Technology Safety Supervision Office)
premission:3/1998.(I.12.) IKIM decre 2§ rights.
- MSZ EN ISO 9001:2001
- 9/2001. (IV.5.) GM rendelet G és B+F modulok
- MSZ EN ISO 3834-2:2006
The references mentioned above are not complete they are only for
introducing purposes.
Sincerely your
Szabó Ferenc
General Manager
12
13
14
15
1, Bayerische Zellstopf Gmbh -Kelheim
1, DREHER Beer factory Zrt-Budapest
5, Százhalombatta-Power plant
16
8, Hungrana Kft.-Szabadegyháza
14, Magyar Suzuki Zrt. Esztergom
17
Henkel factory in Vác: Chilled – heated for cover stainless steel tank
manufacturing
GLOBUS Zrt.-Bp.:Technology Ketchup pipeline
21, DUNAPACK Zrt.-Csepel
18
24, DUNAPACK Zrt.-Csepel:
19
30, Paper machine in Tököl
20
39, Neusiedler Rt. –Dunaújváros
41, Dunapack Zrt. -Dunaújváros
21
48, Aerob pool 2 modification works
22
48, Silt dryer room executing works
23
53, DUNACELL Kft.- Dunaújváros
24
25
56, Gas engine power plant in Székesfehérvár
26
62, Hankook-Yooyoung Engineering Hungary Kft.-Dunaújváros
68, Hamburger Hungária Kft.-PM7 - Dunaújváros
27
28
29
69, REM-FWS Kft.-Kazincbarcika
30