Transcript Document
ClimateMaster 2006 Rep Meeting ClimaDry™ Applications Jeff Hammond, Director of Marketing ClimaDry Applications What is ClimaDry™? WSHP Operating Modes • Cooling – Dehumidification as a byproduct – Typical SHR of 0.72 to 0.78 • Heating • Some WSHPs have Reheat for Humidity Control – Hot Gas Reheat – Condenser Water Reheat – New Energy Reheat • Electric or hot water – ClimaDry (patent pending) • Modulating condenser water regenerative reheat Standard WSHP Refrigerant Circuit Condenser RV Compressor Air Evaporator TXV Water Typical (ON/OFF) Hot Gas Reheat Circuit Traditional Condenser Water Reheat ClimaDry Condenser Water Reheat Low fan speed during dehumidification mode LAT sensor Reheat coil Space between reheat and evaporator coils to maximize moisture removal Evaporator coil ClimaDry Option Components ClimaDry Option Components Condenser Modulating reheat water valve (with integrated LAT controller) Condenser water regeneration pump ClimaDry Option Components • DXM Microprocessor Controller – Incorporates reheat control logic – Utilizes standard humidistat, dehumidistat or integrated thermostat to initiate reheat mode (selected by dip switches) – Uses low fan speed during dehumidification mode ClimaDry Features Patent Pending • 100% reheat – Taps full heat of rejection for reheat as needed – Provides neutral supply air temperature for assured comfort during dehumidification mode • Modulating reheat – precise control of supply air temperatures via integral proportional controller (72 +/- 3F adj) – compensates for variations of EAT or EWT • Simple – Integrated controls requiring only on/off dehumid call • DDC options are compatible – Standard ARI-rated refrigeration circuit – Standard cabinet with factory-installed components • Uses “free” waste heat for reheat – heat of rejection from building water loop ClimaDry versus the Competition ClimaDry Modulating control "Neutral" supply air temperature Simple refrigeration circuit Normal refrigeration pressures Hot Gas Reheat ON/OFF control Uncontrolled supply air temperature Complicated refrigeration circuit Unusual & varying refrigeration pressures Full Reheat Partial Reheat ARI rated performance Non-ARI product ClimaDry Applications Why Use ClimaDry™? U.S. Dew-point Temperatures Building Sensible heat Ratio in 7 Cities Sensible Heat Ratio Trend in Seven Cities (Sensible Design Day - 7/21) 1 Albuquerque 0.9 Sensible Heat Ratio (SHR) Fort Worth 0.8 Minneapolis Boston 0.7 Washington DC Atlanta 0.6 Miami 0.5 0.4 1975 1980 1985 1990 1995 ASHRAE Standard Year 2000 2005 Sensible Heat Ratio Trend in Seven Cities (Shoulder Design Day - 5/21) 1 Albuquerque 0.9 Sensible Heat Ratio (SHR) Fort Worth 0.8 Minneapolis Boston 0.7 Washington DC 0.6 Atlanta Miami 0.5 0.4 1975 1980 1985 1990 1995 ASHRAE StandardYear 2000 2005 ClimaDry Applications • ClimaDry can be applied to most common low SHR applications, such as . . . – – – – – – High occupancy loads (classrooms, etc.) High latent loads (locker rooms, spas) High infiltration loads (entry areas) Untreated make up air intake (low fractions) Humid climates Anywhere humidity is a problem ClimaDry Applications How is ClimaDry™ Sized? ClimaDry Reheat Operation • Return air is cooled and dehumidified by the evaporator coil • Supply air is reheated by the hydronic reheat coil to “neutral” conditions • Dehumidification capability is determined by the heat pump latent capacity rating: LC = TC - SC ClimaDry Operation GC Series Latent Capacity at 85°F (29.4°C) EWT Size Mbtuh lbs/hr kW kg/hr 18 4.7 4.4 1.4 2.0 24 6.1 5.7 1.8 2.6 30 6.8 6.4 2.0 2.9 36 9.6 9.0 2.8 4.1 41 9.7 9.1 2.8 4.1 42 11.0 10.3 3.2 4.7 48 12.7 11.9 3.7 5.4 60 15.2 14.2 4.5 6.4 ClimaDry Applications How is ClimaDry™ Controlled? ClimaDry Controls • DXM board has built-in microprocessor control for reheat operation • Cooling takes precedent • Reheat is engaged by … – – – – Dehumidistat Humidistat ClimateMaster ATP32U02 thermostat DDC controls • Units with PSC or ECM operate at lower airflow during ClimaDry operation • Supply air leaves at 72ºF (22ºC) +/- 3ºF (+/-2ºC) • Optional potentiometer allows further adjustment, +/- 3ºF (+/-2ºC) ClimaDry Control Notes • DXM board required • DIP switches allow choice of dehumidistat or humidistat • Not all integrated t-stats are created the same! – Some thermostats with dehumidification mode only allow dehumidification output in cooling mode (e.g. Carrier Thermidistat) – ClimateMaster ATP32U02 allows reheat operation even when cooling is not required • ClimaDry = Modulating Reheat with ON/OFF control input! ClimaDry Applications ClimaDry™ Installation ClimaDry Installation • All components are inside unit • Water piping is the same as any other ClimateMaster unit • Air bleed must be used to purge air from reheat coil • ClimaDry MUST NOT be used for 100% outside applications – Reheat coil could be subject to freezing conditions ClimaDry Applications ClimaDry™ Availability In March 1 Commercial Price List and EZ-Order ClimaDry Availability • GCV series – Standard range vertical units for Boiler/Tower applications • GLV series – Large tonnage (6-25 tons) vertical units for Boiler/Tower or Geothermal applications • GS, TS, TT series – – – – – Horizontal/Vertical Upflow/Vertical Downflow R22 (GS) or R-410A (TS/TT) Extended range (Blr/Twr & Geothermal) Ultra High Efficiencies 1.5 to 6 tons Questions? ClimateMaster 2006 Rep Meeting ClimaDry Applications Jeff Hammond, Director of Marketing