Transcript Slide 1
BC Royalty Programs June 2006 Ministry of Energy, Mines and Petroleum Resources Page 1. Introduction • • • • • 1st Royalty program 2002 – CBM royalty program OGDS 2003 – Deep, Marginal and Summer royalty programs OGDS 2006 – Ultra-marginal royalty program Currently working on – Net profit program Last year 1427 wells drilled & 1Tcf row gas produced Royalty Program Comparison Reference Price > $120/m3 30 Royalty Rate, % 25 20 Low Productivity Royalty 15 Ultra-marginal Royalty Marginal Royalty 10 CBM Royalty 5 0 0 500 1,000 1,500 Rate, mcf/d Ministry of Energy, Mines and Petroleum Resources 2,000 2,500 3,000 Page 2. BC Royalty Programs Overview BC Royalty Programs Summer Royalty Program Deep Royalty Programs • Deep • Deep Discovery • Deep Re-entry Marginal Royalty Program Ultra-Marginal Royalty Program Low Productivity Royalty Program Condition: • Spud Date between April 01 & November 30 Conditions: • Vertical Well Depth > 2500m • Horizontal Well Depth > 2300m Conditions: • 12 month average Rate < 80 mcf/d/100m • Monthly Production below 880 mcf/d Condition: • 12 month average Rate < 40 mcf/d/100m Condition: • Production < 175 mcf/d Ministry of Energy, Mines and Petroleum Resources Coalbed Methane Condition: • Production < 600 mcf/d Net Profit Royalty Program Condition: • Under Construction Page 3. Summer Royalty Program • Condition – Spud date between April 01 and November 30 • Royalty Credit – 10% of the drilling and completion cost to a max. of $100,000 • Application – BC 25 Form (Summer Drilling Credit Application) Ministry of Energy, Mines and Petroleum Resources Page 4. Deep Royalty Program • Mechanism: – • Royalty Credit designed to recognize the increase costs Requirement – Applicable only for Wells deeper than True Vertical Depth • • 2500 m for vertical wells 2300 m for horizontal wells – Horizontal Well factor • Implementation – Spud date after December 01, 2003 • Application – BC - 11 Notice of Commencement or Suspension of Operations – OGC review – No transfer of royalty credits Ministry of Energy, Mines and Petroleum Resources Page 5. Deep Vertical Well Calculation • Calculations – Use tables (BHL east/west line & gas composition) – Royalty Credit = (CV + AD)* PS • CV = Cumulative Value; AD = • Example Incremental (Depth * $); PS = Interest – West special sour well at 3785m working interest 35% – CV at 3500m= $2.4 million – AD: (3785-3500)*$700 = $199,500 – Royalty Credit: ($2,400,000+$199,500)*0.35 =$909,825 – Ministry of Energy, Mines and Petroleum Resources Page 6. Deep Royalty Ministry of Energy, Mines and Petroleum Resources Page 7. Deep Royalty Horizontal Well Depth Calculation • Horizontal Well Depth – MDTP+HLF*(TMD-MDTP) • Horizontal Length Factor (HLF) Calculation – MDTP is between 2300m & 2875m – HLF=(30-0.035*(MDTP2300))/100 – MDTP >2875m HLF= 0.1 • Total Measured Depth (TMD) Calculation – Depth reported from the End of Well report • Example – MDTP = 2600m & TMD = 2800m – HLF: 30-0.035*(26002300))/100=0.195 – Horizontal Well depth: 2600+0.195*(28002600)=2639m Ministry of Energy, Mines and Petroleum Resources Page 8. Deep Royalty Re-Entry Well • • Qualification – Application to Alter a Well must be submitted and approved before reentry – TVD of the re-entry > 2300m – Re-entry date after December 01, 2003 Application – BC - 11 Notice of Commencement or Suspension of Operations – OGC review – No transfer of royalty credits to another well Ministry of Energy, Mines and Petroleum Resources Page 9. Deep Re-Entry Well • Calculation – Determine incremental distance – Use Tables – Formula (CV+AD)*SP • Example – TMDold= 5000m; TMDnew= 4550m & Well location is on the west – CV: 300m = $150,000 – IV: $500/m – AD: (450m-300m)*$500/m= $75,000 – Re-entry Credit • $150,000+$75,000 = $225,000 Ministry of Energy, Mines and Petroleum Resources Page 10. Deep Discovery Well Exemption • • • Qualifying Criteria – New gas pool – TVD > 4000m – Rig release date after November 2003 – New well surface location must be at least 20km away from the location of any well in a recognized pool of the same formation Royalty Credit – Three year royalty holiday or 283,000,000m3 (~10bcf) Application – No application necessary – OGC will determine if qualification are met Ministry of Energy, Mines and Petroleum Resources Page 11. Marginal Royalty Program • Qualifying for the Marginal Royalty – Well Production Rate • 1st Qualifier – First 12 month average rate < 80 mcf/d/100m (23m3/d/m) • 2nd Qualifier – • Average Monthly Production Rate < 880 mcf/d (25 e3m3/d) Royalty Calculations – Base 9 Royalty: (9 * SP + 40 * (RP – SP))/RP; Min 9% & Max 27% • • – Low Productivity Reduction Factor (LPRF) • – Select Price (SP) = 50 $/m3; Reference Price 2006 (RP) = 285.7 $/m3 LPRF=((25-S)/25)2 Units = e3m3/d Calculation • 27% * (1 – LPRF) • Implementation – Production start after July 01, 2003 • Application – BC - 08 Monthly Production Statement Ministry of Energy, Mines and Petroleum Resources Page 12. Marginal Royalty Program Calculation • Example Total 12 month production (BC-S1): 7e6m3 – Production hours over that same period: 4000hrs – Well depth 2300m Eligibility Calculation – • • (7,000,000/4000)*24/2300 = 18.26m3/d/m – • The calculation is less than 23m3/d/m the well event qualifies as a marginal well event. Royalty Reduction Calculation – Average daily volume: 17,000 m3 – Reference Price: $180/m3 – Step 1 LPRF • ((25,000-17,000)/25,000)2 • LPRF = 0.1024 – Step 2 Marginal Royalty Rate • 27% * (1 – 0.1024) • Marginal Rate = 24.24% Ministry of Energy, Mines and Petroleum Resources Page 13. Ultra Marginal Royalty Program • Qualifying for the Ultra-Marginal Royalty – Development & Exploration Outpost Wells • 12 month average Rate < 40 mcf/d/100m (11m3/d/m) – Exploratory Wildcat Wells • 12 month average Rate < 60 mcf/d/100m (17m3/d/m) – Shallow Wells Only • Applicable only for Wells less than True Vertical Depth – – 2300 m for horizontal wells 2500 m for vertical wells Horizontal Well factor 100% of first 1000 meters and 50% of remainder Royalty Calculations – Base 9 Royalty: (9 * SP + 40 * (RP – SP))/RP (min 9% & max 27%) • • • – Low Productivity Reduction Factor (LPRF) • – • LPRF=((60-S)/60)1.5 Unit = e3m3 Calculation • • Select Price (SP) = 50 $/m3; Reference Price 2005 (RP) = 285.7 $/m3 27% * (1 – LPRF) Implementation – Spud date after January 01, 2006. Application – BC – 08 Monthly Production Statement Ministry of Energy, Mines and Petroleum Resources Page 14. Ultra-Marginal Royalty Calculation • • Example • • • • Horizontal Exploratory Wildcat well, 2300m deep Total 12 month production (BC-S1): 5e6m3 Production hours over that same period: 4000hrs Average daily volume: 20,000 m3 • Horizontal Length Calculation Eligibility Calculation – Step 1: Ultra-marginal well depth (UMD) – • UMD = MDTP+1000+(TMD-(MDTP+1000)/2) – – • TMD – MDTP = 2300 – 1200 = 1100m » Hz section > 1000m UMD: 1200+1000+((2300-(1200+1000))/2) = 2250m Step 2: Check Eligibility • (5,000,000/4000)*24/2250 = 13.3 m3/d/m • The calculation is less than 17m3/d/m the well event qualifies as a ultra-marginal well event. Ultra-Marginal Royalty Calculation – Step 3: Calculate Ultra-marginal Reduction Factor, URF • • – URF: ((60,000-S)/60,000)1.5 ((60,000-20,000)/60,000)1.5 = 0.544 Step 4: Calculate the Ultra-marginal Royalty Rate, UMRR • UMRR: 27% * (1 – 0.544) = 12.3% Ministry of Energy, Mines and Petroleum Resources Page 15. Coalbed Methane Royalty Program • Condition – Coalbed methane wells only • Royalty Credit – $50,000 drilling credit – Produced water management allowance (PCOS) – Royalty bank transferable to other CBM wells – Royalty Reduction • Low Productivity Reduction Factor – LPRF = ((17 – S)/17)2; Units: e3m3 • Calculation – 27% * (1 – LPRF) Ministry of Energy, Mines and Petroleum Resources Page 16. BC Oil & Gas Useful Links Related organizations: • • • • Oil and Gas Commission – Background: – http://www.ogc.gov.bc.ca/background.asp Ministry of Energy, Mines and Petroleum Resources – Oil and Gas Division Responsibilities: – http://www.em.gov.bc.ca/subwebs/oilandg as/overview/ogd.htm Ministry of Small Business and Revenue- Mineral, Oil and Gas Revenue Branch – http://www.rev.gov.bc.ca/mog/oil_gas/roy alty_handbook.htm Ministry of Energy, Mines and Petroleum Resources Titles Division: – http://www.em.gov.bc.ca/subwebs/Landsal e/default.htm Ministry of Energy, Mines and Petroleum Resources Page 17.