INTRODUCTION TO CTCI CORPORATION

Download Report

Transcript INTRODUCTION TO CTCI CORPORATION

CTCI
Corporate Presentation
 Our Vision
To become a leading global provider of engineering services
and innovative technologies
JAN 2008
Safety Map
-- 2 --
Emergency Phone
Numbers
Police Station
110
Fire/ Ambulance
119
Building Management
ext. 1458
Supervisor in charge
ext. 7511/ ext. 1365
Security Guard
ext. 1458
Evacuation Plan
Evacuation assembly area is
designated at the pedestrian island
on Sec. 2, Tun Hwa South Road,
opposite CTCI Tower.
-- 3 --
Our Goals
A Leading Global EPC Service Provider
Commitment to Customer Value
Net Sales of US$ 3 B by 2010
-- 4 --
CTCI’S Strengths
Full Knowledge of Major Licensors and EPC Firms.
Strategic Alliance with Selected Technology
Providers.
An International EPC Contractor with Local
Facilities and Resources.
Own sufficient subsidiaries around the world to
support project execution.
-- 5 --
Value to the Client
CTCI confirms its full commitment to the
Client with the highest standards of quality,
safety and protection of the environment.
CTCI confirms its performance to fulfill the
Client’s requirement for all customers, and
responsibility to society.
-- 6 --
Corporate Overview
(1/2)
History
1959 – China Technical Consultants, Inc. (C.T.C.I.) established
1979 – CTCI Corporation founded by C.T.C.I. and two
financial organizations
(C.T.C.I. now renamed as CTCI Foundation)
1993 – A public listed company in TSE
Paid-in Capital ……………NT$6,167M (approx. US$189M)
Shareholder’s Total Equity…………….……US$271M
FY 2006 New Orders………………………..US$1,910M
CTCI Group Consolidated………US$2,166M
FY 2006 Turnover……………………………..US$717M
CTCI Group Consolidated………US$1,031M
US$:NT$=1:32.57
-- 7 --
Corporate Overview
(2/2)
Number of Employees
CTCI Corporation 2,700 +
CTCI Worldwide
4,400 +
CTCI Offices
Taipei
Headquarters
Kaohsiung
Regional Operation Center
Affiliated Companies
Domestic
15
Overseas
20
-- 8 --
Performance
(2002-2006)
( Year ended December 31)
Million
US$
Turnover
New Orders
Backlog
2821
2500
2,109
2166
1,844
2000
1762
1554
1500
972
1000
523
541
02
03
1031
809
956
723
676
491
500
04
05
06
02
03
04
05
06
02
03
04
05
06
-- 9 --
Business Areas
Hydrocarbon
Infra., Environ.&Power
Gas Processing
Infrastructure
Petroleum Refining
Transportation
Petrochemical
Communication
Chemical
Environment
Terminal
Metal Mills
Environmental &
Resources
O&M and Management
of Waste to Energy
Plants
O&M and Management
of Power Plants
Waste Management
Brewery & Winery
Power Plants
Waste & Energy
Recycling
Waste To Energy
Project Development of
Waste & Energy
-- 10 --
Activities and Services
Feasibility Study & Planning
Project Management
Engineering Design
Procurement
Fabrication
Construction
Commissioning
Maintenance
-- 11 --
Organization Chart
• Corporate Admin. Dept.
• Chief Financial Officer (CFO)
- Accounting Dept.
- Finance Dept.
- Investment
Relationship Dept.
• H. R. Dept.
• Admin. & General Services
Dept.
• Planning Dept.
• Legal Affairs Dept.
Executive
Management Office
(EMO)
Chairman
President
Management
& Strategy
Committee
Hydrocarbon
Business Operations
(HBO)
continued on next page……
(1/4)
•
•
•
•
•
•
•
Marketing & Sales Division
Project Division Ⅰ
Project Division Ⅱ
Project Division Ⅲ
Project Division Ⅳ
Project Service Dept.
Technology Center
•
•
•
•
M&S Dept. Ⅰ(Taiwan)
M&S Dept. Ⅱ (China)
M&S Dept. Ⅲ (S.E.A./ India)
M&S Dept. Ⅳ (M.E.)
• Project Control Dept.
• Estimating
• Contract Management
• Project Quality & HSE
Management
-- 12 --
Organization Chart
Chairman
President
Infrastructure,
Environment &
Power
Business
Operations
(IEPBO)
Management
& Strategy
Committee
(2/4)
• Marketing & Sales Division
• Power Projects Division
• Infrastructure &
Environment Projects
Division
• Project Service Div.
• Technology Center
• M&S Dept. Ⅰ(Taiwan)
• M&S Dept. Ⅱ (China)
• M&S Dept. Ⅲ
(S.E.A./ India)
• M&S Dept. Ⅳ (M.E.)
• Power Dept.
• Waste-to-Energy Dept.
• Air Pollution Control Dept.
• Infrastructure Dept.
• General Industrial Dept.
• Environment Dept.
•
•
•
•
Project Control Dept.
Estimating
Contract Management
Project Quality & HSE
Management
continued on next page……
-- 13 --
Organization Chart
(3/4)
• Information Technology Center
Chairman
President
EPC &
Technical
Service
(EPCTS)
Management
& Strategy
Committee
continued on next page……
• Research & Development Center
• Engineering Division
• Procurement Division
• Construction Division
• Process Engineering
Dept.
• Piping Engineering Dept.
• Mechanical & Equipment
Engineering Dept.
• Instrumentation &
Control System
Engineering Dept.
• Electrical Engineering
Dept.
• Civil & Building
Engineering Dept.
• Project Engineering
Managers
• Procurement Logistics
• Project Procurement
Managers
• Planning & Proposal
• Project Construction
Managers
• Construction HSE
-- 14 --
Organization Chart
Chairman
President
Management
& Strategy
Committee
•
•
•
•
•
•
•
(4/4)
Chief Technical Officer (CTO)
Chief Information Officer (CIO)
China Regional Representative
Auditing Dept.
Q.A. & Safety Dept.
Overseas Subsidiaries
Domestic Subsidiaries
Environment
& Resources
Business
Operations
(ERBO)
• Sino Environmental Service
Corp.
• Leading Energy Corp.
• Fortune Energy Corp.
• KD Holding Corp.
• Administration Center
• HD Resources
Management
Corp.
-- 15 --
Manpower
(as of DEC.2007)
Department
Manpower
Executive Management
Project Group
Engineering
12
607
1,112
Procurement
101
Construction
656
IT Center
44
Budget & Operation Administration
9
QA/QC
9
Finance & Accounting
Human Resource
50
6
Administration & General Service
75
Other Supporting
20
Total
2701
-- 16 --
CTCI Worldwide Network
Jingding, China
Shang Ding, China
CTCI Taipei HQ
CTCI Kaohsiung
CIPEC, Philippines
CTCI,
Abu Dhabi
CTCI, Thailand
CTCI Arabia, KSA
CTCI, Qatar
CIMAS, Vietnam
CTCI, Malaysia
-- 17 --
Major Subsidiaries & Affiliates
DOMESTIC
E & C Engineering Corp.
Advanced Control & Systems Inc.
Resources Engineering Services Inc.
CTCI Chemicals Corp.
CTCI Machinery Corp.
Sino Environmental Services Corp.
OVERSEAS
Jingding Engineering &Construction Co.
Ltd. Beijing, China
Shang Ding Engineering &Construction
Co. Ltd. Shanghai, China
CTCI (Thailand) Co., Ltd. Thailand
CIMAS Engineering Co., Ltd. Vietnam
KD Holding Corp.
CTCI Engineering & Construction Sdn.
Bhd. Malaysia
Leading Energy Corp.
CIPEC Construction, Inc., Philippine
HD Resources Management Corp.
CTCI Arabia Ltd. Saudi Arabia
Fortune Energy Corp.
CTCI Overseas Corporation Ltd.,Hong
KongCTAS Corporation, USA
CTAS Corporation, USA
-- 18 --
Financial Capability
(1/2)
Total Bank Credit (DEC 2007)
(US$M)
A.
B.
rating Moody’s A3/S&P A- or above
International Banks (13)
481
Taiwan Banks (15)
417
Sub-Total
898
rating below Moody’s A3/S&P ATaiwan Banks (22)
Grand Total
331
1,229
-- 19 --
Financial Capability
(2/2)
Available Bank Credit (DEC 2007)
(US$M)
Grand Total Bank Credit
1,229
Utilized Bank Credit
400
Available Bank Credit
829
-- 20 --
ISO 9001
-- 21 --
ISO 14001 & OHSAS 18001
-- 22 --
CTCI
Engineering

Engineering
Engineering
Engineering
-- 23 --
Engineering Design
Process Design
Piping Design
Civil and Building Design
Instrumentation & Control System
Electrical Design
Mechanical and Equipment Design
Project Engineering Management
-- 24 --
Engineering Manpower (1/3)
(Resources)
Office Allocation
Engineering Hub
Beijing
Taipei
908
Kaohsiung
170
Global Engineering Satellites
Beijing
Bangkok
Hanoi
Hanoi
Taipei
Total
252
99
147
1,579
Bangkok
Kaohsiung
(as of Aug. 31, 2007)
-- 25 --
Engineering Manpower (2/3)
(Discipline Allocation)
(as of Aug. 31, 2007)
Department
Manpower
Process
107
Piping
543
Civil & Building
320
Instrumentation & Control System
178
Electrical
170
Mechanical & Equipment
201
Project Engineering Mgr
60
Total
1,579
-- 26 --
Engineering Manpower (3/3)
(Capacity)
Total Engineering Man-hour Spent
Million
MH
4.5
3.87
3.81
4.0
3.5
4.31
4.2
3.3
3.0
0
2002
2003
2004
2005
2006
(Fiscal Year)
-- 27 --
Multi-Discipline Engineering Design Work Flow
Process
Simulation
Process Flow
Diagram
Mechanical
Design/Rating
Process Equipment
Design
Intelligent
P&ID
2D
Schematic
Database
Equipment
Modeling
Instrument
Design
Electrical
Design
Instrument
Layout
Electrical
Layout
MTO
Plot Plan
Piping Stress
Analysis
Foundation Design
Structural Modeling
Structural Analysis
and Design
Piping Design/
Piping Modeling
3D
Design
Database
Interference
Detection
Model (Design)
Review
QTO
Piping Arrangement
Production
Isometric Production
-- 28 --
CAD/CAE Linked to Project MIS
Req
Vendor Doc
Doc
Outside
ENG. Doc
Contracted
Scope of
Work
Dwg
PMS
EDMS
CAD/CAE
MT
EMS
O
MMS
Database
EMS: Engineering Management System
EDMS: Engineering Document Management System
CAD/CAE: Computer Aided Design/Engineering
PMS: Procurement Management System
QT
O
CMS
QTO
MMS: Material Management System
CMS: Construction Management System
MTO: Material Take Off
QTO: Construction Quantity Take Off
-- 29 --
Material Management
Construction Engineering
Procurement Team
Project
Material Management System
Engineering
Department
Procurement
Department
Requisition
Approval
Requisition
Plan
Engineering
Design
Budgeting and
Cost Control
Check
M.T.O./SUM
 Establish MTO
Database
 Generate Material
Reports
Stock
Availability
Material
Requisitioning
Generate Bulk
Materials
Equipment
Requisitions
Material
Receiving
Material Coding
System
Site Material
Dispatching/
Returning
Material
Management
and
Warehousing
Material Codes
Checking/Adding
Material Purchasing
Inquiry、 Bid Evaluation、
P.O.、Delivery
Inventory Management System
-- 30 --
Enterprise Network
SESC / Taipei
JDEC / Beijing
Sites / Taipei
SDEC
Shanghai
E&C / Taipei
HQ / Taipei
ACS / Taipei
CTCI-T
Bangkok
RES / Taipei
Sites / Taiwan
Dedicated Circuit
Router
Video Conference
VoIP Telephony
Data Communication
Eng. / Kaohsiung
CTCI Machinery Corp.
/ Kaohsiung
Internet Connection
-- 31 --
CTCI
Procurement

Procurement
Procurement
Procurement
-- 32 --
Procurement Activities & Services
Market Survey
Inquiry and Purchasing
Inspection and Expediting
Shipping, Delivery and Claim
Permits
Banking Affairs
Customs Clearance
Insurance
Tariffs
Subcontracting
-- 33 --
Procurement Power of CTCI Group
Total Procurement Amount
(US$M)
800
763
A Continuous Large
Procurement Amount makes
CTCI a “Powerful” Purchaser
700
682
Direct Access to Vendor’s
Top Management
600
652
CTCI can Procure Equipment
& Materials at very
Competitive Prices
500
400
368
337
300
02
03
04
05
06
(Fiscal Year)
-- 34 --
CTCI

CTCI Machinery Corporation
CTCI Machinery
CTCI
Machinery Corporation
Corporation
CTCI Machinery Corporation
-- 35 --
CTCI Machinery Corporation Certification
American Mechanical Society of Engineers
U (certified since 1982)
U2 (certified since 1982)
S (certified since 1992)
PP (certified since 1992)
The National Board of Boiler and Pressure Vessel Inspectors
NB (certified since 1992)
R (certified since 1992)
China State Bureau of Quality and Technical Supervision
Safety Quality License (certified since 1999)
-- 36 --
CTCI Machinery Corporation Capacity
Towers & Drums
300 Tons/Month
Heat Exchangers
200 Tons/Month
Steel Structures
600 Tons/Month
Piping Prefabrication
30000 Dia.-in/Month
-- 37 --
CTCI Machinery Corporation Excellence
Zirconium & Zirconium-based Alloys
Aluminium & Aluminium-based Alloys
Titanium & Titanium-based Alloys
Duplex Stainless Steel
Copper & Copper-based Alloys
Copper-Nickel
Nickel
Monel
Inconel & Incoloy
Hastelloy
-- 38 --
CTCI
Construction

Constructio
Construction
n
Construction
-- 39 --
Construction Activities & Services
Equipment Installation & Rigging
Piping Fabrication & Erection
Steel Structure Fabrication & Erection
Electrical Installation & Wiring
Instrument Installation, Piping & Wiring
Civil & Architectural
Painting & Insulation
Construction Management
Pre-commissioning
-- 40 --
Construction Capability of CTCI Group
Total Construction Man-hour
Million
MH
38.1
40.0
Construction Management
37.5
All Disciplines
30.0
South Asia in Proven
24
Experience in Management
21.7
20.0
of International Workers –
15.7
Chinese, Thai, Filipino,
Vietnamese
10.0
0
02
03
04
05
06
(Fiscal Year)
-- 41 --
Construction Management
Site Organization
Quality Control & Assurance
Manpower Mobilization & Control
Safety & Security
Temporary Facilities & Utilities
Material Control & Warehousing
Construction Schedule Control
Cost Control
Construction Equipment
Computer Application
Construction Procedure Planning
Document Control
Procurement & Subcontracting
Welding Control
Office Administration
Pre-commissioning
-- 42 --
CTCI

Global General Contractor
Global General Contractor
Global General Contractor
Global General Contractor
-- 43 --
Reference w/Process Licensors (1/6)
Product/Process
Process Licensor
 Oil & Gas……1
Crude Distillation (Topping)
ABB Lummus
Vacuum Distillation (VDU)
ABB Lummus, ExxonMobil
Catalytic Reforming
ABB Lummus, Engelhard, IFP, UOP
HDS
IFP, Union Oil, Haldor Topsoe
RDS
Chevron, Gulf, Union Oil, UOP
Delayed Coking
ABB Lummus
Visbreaker
ABB Lummus
FCC / RFCC
S&W, Exxon, KBR, UOP
continued on next page……
-- 44 --
Reference w/Process Licensors (2/6)
Product/Process
Process Licensor
 Oil & Gas……2
Hydrocracking
UOP, Union Oil
Alkylation
Exxon, Phillips, Stratco
Isomerization
UOP
Lube Oil
Badger, Chevron, Gulf, ExxonMobil
SRU
Comprimo, Pritchard, Parsons, Amoco,
Technip KTI
Gasification
Texaco
TAME
IFP
Sweetening
Merichem, UOP
Synthesis Gas
Haldor Topsoe, Texaco
continued on next page……
-- 45 --
Reference w/Process Licensors (3/6)
Product/Process
Process Licensor
 Petrochemicals……1
Acetaldehyde
Aldehyde
Acrylonitrile
BP
Aromatics
UOP
Bis-Phenol A
Chiyoda, Idemitsu
Butadiene Extraction
Nippon Zeon, ABB Lummus
Caprolactam (CPL)
Stamicarbon
Cumeme
CD Tech, UOP
EB / SM
Mobil / Badger, ABB Lummus / UOP
EDC / VCM
Solvay, Geon
EO / EG
Shell, UCC, SD, Atochem
continued on next page……
-- 46 --
Reference w/Process Licensors (4/6)
Product/Process
Process Licensor
 Petrochemicals……2
FA (Formic Acid)
BASF
MEK (Methyl Ethyl Ketone)
Arco
MMA (Methyl Mathacrylic)
Comprimo, ICI, MRC
MTBE
Arco, IFP, UOP
Olefins
S&W, KBR, ABB Lummus
Propylene (OCT)
ABB Lummus
PDH
UOP
Phenol
KBR, UOP, GE
PA (Phthalic Anhydride)
BASF
PTA
BP, Invista, Tecnimont, Hitachi
SBR
B.F. Goodrich
Vinyl Acetate
Bayer
continued on next page……
-- 47 --
Reference w/Process Licensors (5/6)
Product/Process
Process Licensor
 Polymers
LLDPE / HDPE
Borealis, Mitsui Chemicals, Nissan,
Quantum, UCC
LDPE
BASF, Gulf
PP
Basell, BASF, Hercules
PS
KHI, Nova
PVC
Oxychem, FPC, Westlake
ABS
Monsanto, JSR, Toray, Kumho
SAN
Monsanto, Mitsui Chemicals
continued on next page……
-- 48 --
Reference w/Process Licensors (6/6)
Product/Process
Process Licensor
 Others
Acetic Acid
BP
AG Chemicals
Rohm & Haas
Chlor-Alkali
Asahi Glass, Asahi Kasei, Ineos
Ion Exchange Resin
Rohm & Haas, Mitsubishi Chemical
Polyol
Dow Chemical
Wax
Unocal
Municipal IncineratoR
Martin
-- 49 --
Reference w/Major E&C Firms
- Hydrocarbon Related
ABB Lummus
Bechtel
Foster Wheeler
McDermort
SNC-Lavalin
Aker Kvaerner
Lurgi
Technip
Tecnimont
Chiyoda
Mitsubishi Heavy Ind.
Badger Technologies
Fluor
Halliburton KBR
Parsons
Stone & Webster
Linde
Sembcorp Simon-Carves
Tecnicas Reunidas
Uhde
JGC
Toyo Engineering
-- 50 --
Reference w/Major Int’l Clients
- Hydrocarbon Related
Air Products
Arco
BASF
Bayer
BP
Ciba Specialty
DuPont
Huntsman (ICI PU Business)
Lucite (ICI MMA business)
Occidental Chemical
Rhone-Poulenc
Shell
Ube Industries
Air Liquide
Asahi Kasel
Basell (Montell)
BOC
ChevronPhillips
Dow Chemical
ExxonMobil
Ineos (ICI Chlor Business)
Monsanto
PPG
Rohm & Haas
Solvay
-- 51 --
Reference w/Major E&C Firms
- Infra., Environ. & Power Related
Alstom
Electrowatt
Parsons Brinkerhoff
Pacific Consultant International
Systra
Sofretu
TYLin International
-- 52 --
Reference w/Major Int’l Clients
- Infra., Environ. & Power Related
Alstom
Jet Tech
ABB
MHI
ADI
MBEL
B&W
Volund
CH2M HILL
TSK
Chube Electric
Toshiba
Hitachi
Siemens
IHIGE
-- 53 --
CTCI

Major Project Reference
Major Project Reference
Major Project Reference
Major Project Reference
-- 54 --
Experience Summary
- Refinery
No. of Project
Crude Distillation (Topping)
12
Vacuum Distillation
6
Reformer/CCR
6
FCC/RFCC
7
Hydrocracker
5
HDS/RDS
28
SRU/SRU Tail Gas Treating
29
Alkylation/Isomerization
8
MTBE/TAME
5
Visbreaking/Delayed Coking
4
Lube Oil/Condensate processing
6
Synthesis Gas
TOTAL
14
130
-- 55 --
Experience Summary
- Petrochemical
No. of Project
Olefins
17
Aromatics
8
Butadiene Extraction
5
Acetaldehyde
1
Carbon Black
5
EDC/VCM
2
EO/EG
8
Methyl Methacrylate (MMA)
7
Acrylonitrile (AN)
1
EB/SM
5
Cumene/Phenol/Bis-Phenol A
9
CPL
2
PTA
20
Other
50
Total
140
-- 56 --
Experience Summary
- Polymer
No. of Project
Polyethylene (LLDPE/LDPE/HDPE)
Polyvinyl Chloride (PVC)
Polypropylene (PP)
Polystyrene (PS)
ABS/SAN
11
5
11
2
11
SBR/BR/TPE
6
Spandex/PTMG
3
Acryllc Fiber Polyester
2
Total
51
-- 57 --
Experience Summary
- Power
No. of Project
Co-generation
15
Combined Cycle
23
Fossil
11
Nuclear
15
Power Transmission & Distribution 17
Total
81
-- 58 --
Experience Summary
- General Industry
No. of Project
Glass Industry
Air Separation Unit (ASU)
Pulp & Paper
Electronics Business
2
15
2
30
Iron Making
9
Steel Making
7
Hot Rolling Mill
5
Cold Rolling Mill
8
Non-Ferrous
3
Utility
10
Storage and Terminal
25
Pipeline
11
Total
127
-- 59 --
Experience Summary
- Transportation
No. of Project
High Speed Railway
28
Massive Rapid Transit (MRT)
37
Freeway, Tunnel and Road Work
19
Others
11
Total
95
-- 60 --
Experience Summary
- Environmental
No. of Project
SCR De Nox
83
Flue Gas Desulfurization (FGD)
8
Electrostatic Precipitator (EP)
8
Water and Waste Water Treatment
17
Solid/Liquid Waste Treatment (Incinerator)
34
Environment Impact Assessment
19
Air Quality Management / Planning
5
Noise Abatement and Vibration Control
l5
Soil and Ground Water Remediation
15
Industrial & Environmental Safety Monitoring
16
Total
220
-- 61 --
CTCI
CTCI Operation

In Taiwan
-- 62 --
CTCI’s Experience in Taiwan
(From Jan.2000 to Jun.2007)
FCFC, Aroma 3 Project
FPCC, Lube Base Oil (LBO) Project
▲
CPC, Alkylation Project
CPC Tao-Yuan Refinery
CPC,LNG Receiving Terminal Project
FPCC, Refinery Complex Project
FPCC, RCC Project
FPCC, Diesel HDS Project
FPC, MMA Project
CAPCO, No.6 PTA Project
▲
FPCC, Olefin 3 Project
Tai-Chung Harbor
▲FPG
▲
Complex
GGPC Complex
CPC Kao-Hsiung Refinery▲
Ta-Lin Petrochemical Complex ▲
CPC, Diesel HDS Project
CPC, Jet Fuel Treating Project
CPC, N-Paraffins Project
CPDC, Caprolactam III Project
GGPC EIS Service Project
▲
Ta-Sheh, Jen-Wu Petrochemical Complex
▲ Lin-Yuan Petrochemical Complex
TSMC, EB-1 EBMax Project
OUCC, EC Project
OUCC, EA Project
OUCC, EO/EG Project
TPCC, AMS Recovery Project
Major Reference – Taiwan
Client
Chinese Petroleum
(1/4)
Location
Project
Scope Completion
Tai-Chung
Northern LNG
EPC
Progressing
EPC
Progressing
C
Progressing
E
Progressing
Corporation
Receiving Terminal
Formosa Petrochemical
Mai-Liao,
KHU Fired Heaters
Corporation
Yun-Lin
29.67 MMKcal/Hr
Formosa Petrochemical
Mai-Liao,
Lube Base Oil
Corporation
Yun-Lin
9,000 BPSD
Formosa Chemicals
Lon-Der,
IPA Plant
& Fibre Corporation
Yi-Lan
300,000 MTA
Formosa Petrochemical
Mai-Liao,
LNS/SLP-3/LPF-2
E
2007
Corporation
Yun-Lin
Formosa Petrochemical
Mai-Liao,
PRU-2/OCT
E
2007
Corporation
Yun-Lin
JGC Formosa Chemicals
Mai-Liao,
ARO-3 Plant
E+C
2007
& Fibre Corporation
Yun-Lin
1,271,000 MTA
continued on next page……
-- 64 --
Major Reference – Taiwan
Client
(2/4)
Location
Project
Scope Completion
Formosa Chemicals
Mai-Liao,
ARO-3 Fired Heaters EPC
& Fibre Corporation
Yun-Lin
480.68 MMKCal/Hr
Formosa Chemicals
Mai-Liao,
SM-3 Fired Heaters
& Fibre Corporation
Yun-Lin
66.4 MMKcal/Hr
Formosa Petrochemical
Mai-Liao,
Olefin 3 Plant
Corporation
Yun-Lin
1,200,000 MTA
Taiwan Styrene
Lin-Yuan,
Monomer Corporation
Kao-Hsiung
Formosa Chemicals
2007
EPC
2007
E+C
2007
EB-1 EBMax Project
EPC
2006
Mai-Liao,
Phenol Revamping
E+C
2005
& Fibre Corporation
Yun-Lin
400,000 MTA
Formosa BP Chemicals
Mai-Liao,
Acetic Acid
E
2005
Corporation
Yun-Lin
300,000 MTA
JGC Corporation
CPC Tao-Yuan
Alkylation
EPC
2003
Refinery
8,600 BPSD
continued on next page……
-- 65 --
Major Reference – Taiwan
Client
Chinese Petroleum
(3/4)
Location
Project
Scope Completion
Kao-Hsiung
Diesel HDS
EPC
2003
EPC
2003
EPC
2003
EPC
2003
E
2002
C
2002
C
2002
Corporation
20,000 BPSD
Chinese Petroleum
Ta-Lin,
Jet Fuel Treating
Corporation
Kao-Hsiung
18,000 BPSD
Chinese Petroleum
Ta-Lin,
N-Paraffins
Corporation
Kao-Hsiung
130,000 MTA
China American
Tai-Chung
No.6 PTA Project
Petrochemical Co., Ltd
Chang Chun
700,000 MTA
Kao-Hsiung
Petrochemical Co., Ltd
Phenol Project
200,000 MTA
Formosa Petrochemical
Mia-Liao,
Olefin-1 Revamping
Corporation
Yun-Lin
700,000 MTA
Formosa Asahi
Mai-Liao,
PTMG II Expansion
Spandex Co., Ltd
Yun-Lin
14,000 MTA
continued on next page……
-- 66 --
Major Reference – Taiwan
Client
(4/4)
Location
Project
Scope Completion
Nan-Ya Plastics
Mai-Liao,
BPA II Project
C
2001
Corporation
Yun-Lin
100,000 MTA
Oriental Union
Lin-Yuan,
EC Project
EPC
2001
Chemical Corporation
Kao-Hsiung
40,000 MTA
Oriental Union
Lin-Yuan,
EA Project
EPC
2000
Chemical Corporation
Kao-Hsiung
40,000 MTA
Oriental Union
Lin-Yuan,
EO/EG Project
EPC
2000
Chemical Corporation
Kao-Hsiung
180,000 MTA
China Petrochemical
Kao-Hsiung
Caprolactam Project EPC
2000
Development Corporation
120,000 MTA
Taiwan Prosperity
Lin-Yuan,
AMS Recovery
Chemical Corporation
Kao-Hsiung
130,000 MTA
EPC
2000
-- 67 --
CTCI
CTCI Operation

In China
-- 68 --
Jingding Engrg. & Const. Co., Ltd.
- Corporate Overview
Established in
1993
Capital
RMB 14M
Turnover (2006)
USD 6M
Share Holders
CTCI Overseas, HK
100%
Offices
Beijing
Head Offices
Number of Employees
410
New Orders (2006)
RMB 82M
Turnover (2006)
RMB 47M
Current Backlog (2006)
RMB 64M
-- 69 --
Jingding Engrg. & Const. Co., Ltd.
- Manpower Resources
Local
Expatriate
Management
14
2
Project Group
24
3
348
15
140
37
80
35
35
6
1
Engineering
- Process
- Piping
- Equipment
- Civil & Structure
- Instrument
- Electrical
- IT center
Procurement
8
Construction
16
1
410
7
TOTAL
-- 70 --
Jingding Engrg. & Const. Co., Ltd.
- Certificates
The First Class Design Institute for
Petrochemical and Chemical Industries
(No. 0109011)
Pressure Vessel Design
(No. RSP ZSH(三) – 050)
-- 71 --
-- 72 --
-- 73 --
Jingding Engrg. & Const. Co., Ltd.
- Business License (No.000335)
-- 74 --
Shang Ding Engrg. & Const. Co., Ltd.
- Corporate Overview
Established in
2003
Capital
RMB 52M
Share Holders
CTCI Overseas, HK
52%
E&C Engineering Corp.
48%
Offices
Shanghai
Number of Employees
172
New Orders (2005)
RMB 119M
Turnover (2005)
RMB 109M
Current Backlog (2005)
RMB 367M
-- 75 --
Shang Ding Engrg. & Const. Co., Ltd.
- Certificates
Class A EPC General Contractor for Mechanical & Electrical
Construction
Class A EPC General Contractor for Environmental Engineering
Class B EPC General Contractor for Building Construction
Class B EPC General Contractor for Petrochemical Industries
Class B EPC General Contractor for Infrastructure
Class B General Contractor for Electrical Construction
Class B General Contractor for Municipal Engineering
-- 76 --
-- 77 --
Shang Ding Engrg. & Const. Co., Ltd.
- Business License (No.034332)
-- 78 --
Shang Ding Engrg. & Const. Co., Ltd.
- Business Areas
Infrastructure
Water / Wastewater Treatment
Air Pollution Control
Waste-To-Energy
Power Plants
High Tech
High Tech Industries
Biotech
MEP for Hospital
Information Technology & Automation
Integration of Computer, Communication and Control
Environmental Monitoring
Transportation Control
High Tech Products Agent
Software Engineering
-- 79 --
CTCI’s Experience in China
1
O2 Generation System - Jilin
24 PMMA Project - Zhenjiang
2
SAN II Project - Zhenjiang
25 PFA Plant - Zhenjiang
EPC LSTK
3
Ag Plant - Nantong
26 SBR Project - Nantong
ENG’G
4
PVC Plant - Suzhou
27 Ethylene Plant Expansion – Shanghai
COST ESTIMATE
5
IER Project - Shanghai
28 PVC Plant – Ningbo
CONSTR. MGT
6
PU System House - Shanghai
29 PTA Plant - Ningbo
7
LPG Terminal - Quanzhou
30 ABS Plant - Ningbo
8
CP-1 Power Plant DeNox System
-Zhangzhou
Dry Film Resin Plant - Zhongshan
31 PTA Plant - Xiamen, Fujian
9
32 Relocation of O2 Plant – Guangdong
10 PTA Plant - Zhuhai
33 MMA Project – Shanghai
11 PPAM Plant - Hong Kong
34 PVC Plant – Zibo
12 PTA Plant -Xiamen, Fujian
35 IIP Project – Shanghai
13 ABS II Plant – Zhenjiang
West-East Natural Gas Pipeline –
14
Nanjing
36 PTA Plant – Shanghai
38
16 C1 Project – Nanjing
39
19 MMA Project – Shanghai
20 SAR Project – Shanghai
Beijing
40
41
42
43
21 Liquid Waste Incinerator –Huizhou
44
22 PVDC Project – Nantong
45
23 LNG Project - Shanghai
46
47
JDEC
SDEC
34
16
37 PTA Plant Revamping – Xiamen, Fujian 14 15
15 LDPE Project – Nanjing
17 EO/EG Project – Huizhou
18 AF Project – Ningbo
1
40
CTCI Overseas
Liaison Office
22
41 42 33
Nanjing  44 3 26 35 19 20
ABS III Plant – Zhenjiang
48
2 3813 4 Shanghai
EB/ SM Plant – Dushanzi, Xinjiang
36 5 6 27 46
45
24
25
TiO2 Plant – Shangdong
18 28 29 30 23
BR Plant – Nantong
7 35
CTCI H.Q.
8 Xiamen
SEBS Plant – Nantong
17 32 31 12 21
47
FCC Plant – Qinzhou, Guangxi
9 Guangzhou
 Taipei
43
Carbon Black Plant - Zhangjiagang 10 26Hong
11 Kong
Chromium Sulfate Project - Suzhou

Multi - Product Resins - Shanghai
Kaohsiung
Epoxy Plant – Panyu, Guangdong
48
Additive Project - Shanghai
Major Reference – China
Client
ZGPC Chemical
Stone & Webster
E.I. du Pont (DuPont)
TSRC (Nantong)
TSRC (Nantong)
Shanghai LNG Company
(1/8)
Location
Project
Zhanjiang,
ABS III Plant
Jiangsu
100,000 MTA
Dushanzi
EB/SM Plant
Xinjiang
320,000 MTA
Dongying,
TiO2 Plant
Shangdong
200,000 MTA
Nantong,
BR Plant
Jiangsu
72,000 MTA
Nantong,
SEBS Plant
Jiangsu
20,000 MTA
Shanghai
Shanghai LNG
Scope
Completion
ED
Ongoing
EB
Ongoing
EPsCM
Ongoing
EB
Ongoing
EB & ED
Ongoing
EPC
Ongoing
3,000,000 MTA
continued on next page……
-- 81 --
Major Reference – China
__Client
(2/8)
Location
Project
Scope
Completion
PetroChina
Qiangzhou,
FCC Plant
FEED
Ongoing
Guangxi
Guangxi
3,500,000 MTA
Oriental
Pudong,
PTA Plant
EPsCM
2006
Petrochemical
Shanghai
600,000 MTA
ED
2006
ED
2006
EPsCM
2006
Petrochemical
Company
Formosa Petrochemical Ningbo,
PP Plant
Corp.
Zhejiang
300,000 MTA
Formosa Chemicals
Ningbo,
ABSII Plant
Zhejiang
125,000 MTA
BASF/Huntsman
Caojing,
Integrated
3 JVs
Shanghai
Isocyanates
& Fibers Crop.
Project
continued on next page……
-- 82 --
Major Reference – China
(3/8)
Client
Location
Project
BASF-YPC
Nanjing,
C1 Units
Jiangsu
- FA:50,000 MTA
- PA:30,000 MTA
- MA:30,000 MTA
- DMF:30,000 MTA
Ningbo Rayon
Ningbo,
Acrylic Fiber
Acrylic Fiber
Zhejiang
Project 50,000 MTA
Lucite
Caojing,
MMA Plant
Shanghai
90,000 MTA
Shanghai Secco
Caojing,
SAR Plant
Petrochemical
Shanghai
278,000 MTA
CNOOC and Shell
Huizhou,
Liquid Waste
Petrochemicals
Guangdong
Incinerator
Formosa Chemicals Ningbo,
IPA Plant
& Fibers
600,000 MTA
Zhejiang
Scope
Completion
EPC
2005
EPC
2005
EPC
2005
EPC
2005
EPC
2005
ED
2005
continued on next page……
-- 83 --
Major Reference – China
Client
(4/8)
Location
Project
Scope Completion
Formosa
Zhangzhou,
CP-1 Power
EPC
2005
Petrochemical
Fujian
Plant DeNox System
Petrochemical
Fujian
Revamp to
E
2005
EPC
2005
EPC
2005
EPC
2005
1,200,000 MTA
Nantong SKT New
Nantong,
PVDC Project
Materials
Jiangsu
10,000 MTA
BASF-YPC
Nanjing,
LDPE Plant
Jiangsu
400,000 MTA
CNOOC and Shell
Huizhou,
EO/EG Plant
Petrochemicals
Guangdong
320,000 MTA
Formosa Plastics
Ningbo,
PVC Plant
E
2004
Xiang Lu
Xiamen,
PTA Plant
EB
2004
continued on next page……
-- 84 --
Major Reference – China
(5/8)
Location
Project
China Petroleum
Nanjing,
West-East
Pipeline Engineering
Jiangsu
Natural Gas
Pipeline Tunnel
Crossing River
Project
Lucite
Caojing,
MMA Plant
Shanghai
90,000 MTA
SAR Plant
278,000 MTA
Phase I
Zibo,
S-PVC Plant
EB
2003
Shangdong
400,000 MTA
Formosa Chemicals
Ningbo,
ABS Plant
E
2003
& Fibers
Zhejiang
120,000 MTA
ZGPC Chemical
Zhengjiang,
ABS II Plant
EPC
2002
Jiangsu
30,000 MTA
___Client
Qilu Petrochemical
Scope
Completion
EPC
2003
E
2003
continued on next page……
-- 85 --
Major Reference – China
(6/8)
Location
Project
Xiang Lu
Xiamen,
PTA Plant
Petrochemical
Fujian
900,000 MTA
Rohm & Haas
Nantong,
Ag Chemical
Nantong Chemical
Jiangsu
Plant 8,000 MTA
___Client
Scope
Completion
EPC
2002
EPC
2001
EB
2001
E
2001
EPC
2000
EPC
1999
(incl’d EB for OSBL)
Shanghai
Shanghai
Petrochemical
LCY Chemical
ZGPC Chemical
Rohm & Haas
Ethylene Plant
Revamping &
Expansion to
700,000 MTA
Zhengjiang,
PFA Plant
Jiangsu
15,000 MTA
Zhenjiang,
SAN-II Plant
Jiangsu
30,000 MTA
Shanghai
IER Plant
Shanghai Chemical
13,710 MTA
(incl’d EB for OSBL)
continued on next page……
-- 86 --
Major Reference – China
(7/8)
Client
Location
Project
Suzhou Huasu
Suzhou,
PVC Plant
Plastics
Jiangsu
100,000 MTA
LCY Chemical
Zhenjiang,
PMMA Plant
Jiangsu
25,000 MTA
Hong Kong
PPAM Plant
Montell-TPP China
Advanced Polymer
Scope
Completion
E-C
1999
EB
1999
EPC
1999
EPC
1998
6,000 MTA
Fujian Huaxing
Quanzhou,
LPG Terminal
Petrochemical
Fujian
2 x 25,000 M3
Shanghai CIBA Gao
Shanghai
Additive Project
CM
1997
Shanghai
PU System
EPC
1996
EPC
1995
Qiao Chemical
ICI Polyurethane
House
Jihua Petrochemical
Jilin
Oxygen
Generation System
continued on next page……
-- 87 --
Major Reference – China
(8/8)
Client
Location
Project
Taiwan Synthetic
Nantong
SBR Plant
Rubber Chemical
Jiangsu
100,000 MTA
Air Products
Shekou
Relocation of
Guangdong
Oxygen Plan
Legend:
EB – Basic Engineering
P – Supply
C – Construction
Scope
Completion
EB
1995
E
1992
ED – Detailed Engineering
Ps - Procurement Service
CM - Construction Management
-- 88 --
CTCI
CTCI Operation

In Thailand
-- 89 --
CTCI(Thailand)Co., Ltd.
Corporate Overview
Established in
1987
Capital
Baht
100
Million
Revenues (2006)
Baht
1,396
Million
476
Million
Revenues (up to March 2007) Baht
Number of Employees
400+
Shareholders
Thais
51%
CTCI Corporation 49%
Offices
Bangkok
Head Office and Engineering Office
Rayong
Eastern Province Operation Center (EPOC)
- Construction and Fabrication Base
-- 90 --
Major Reference in Thailand
Amata 170 MW CCPP
Piping Work
CTCIT Bangkok Office
Bangchak Product Quality
Improvement Project
Thai Oil New Gas Turbine
Lampang
PTTUT CUP 1
l
Bangchak Gas Oil HDS
Khon Kaen l
PPG Coatings Plant
TOC C2 Cold Train and C3 Train
Nakhon Sawan
Rayong Purifier Topping Unit
Diapolyacrylic PMMA Plant
Rohm & Haas PAA Plant
Bangkok
Nakong Pathong l

Bayer BPA & PC II Expansion
Mechanical Work
BanpanKong
l
Sriracha l
l
HMC PDH Plant
Thai MMA TBA #2 and
New MMA Tank
Vinythai VCM Plant
CTCIT EPOC Work Shop
TPC-OXY PVC Paste Resin Plant
Rayong
HMC PP-I Upgrading; PP-II; Year
2001 & 2002 Debottleneck
TIG ASU 400 TPD
Tuntex PTA Plant ISBL; Waste Gas
Venturi Scrubber; RVF
Maxxis Rubber Tire Plant
PPCL Phenol Project
MPKC (“Bayer”) ABS/SAN Plant
-- 91 --
Major Reference – Thailand
Client
Project
(1/7)
Scope
Completion
HMC
- PDH Project
EPC
Ongoing
Bangckak Petroleum
- Product Quality Improvement
EPC
Ongoing
PPCL
- PTT Phenol Project
EPC
Ongoing
PTT Chem Co.
- Cluster Flare Project
EPC
Ongoing
Thai Oil Co.
- GTG/HRSG Project
EPC
Ongoing
PTT Utility Co.
- CUP 1 Phase 4
EPC
Ongoing
PTT Utility Co.
- CUP 1 Phase 3
EPC
Ongoing
PTT Utility Co.
- CUP 1 Phase 1&2
EPC
2006
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
continued on next page……
-- 92 --
Major Reference – Thailand
Client
Project
Mitsubishi Corp.
- BLCP Power Plant Visitor Center
MAXXIS
- Rubber Tire Phase I Stage 2
TSL
(2/7)
Scope
Completion
EPC
2006
C
2006
- TSL Expansion
EPC
2005
Thai Olefins Co.,
- New Parallel C3
EPC
2005
SIEMENS
- Piping Work for IPT Power
EPC
2004
Plant for CT#2
Thai Caprolactam
- Oxime Dehydration Unit
EPC
2004
Thai Olefins Co.,
- Air Oxidation Unit
EPC
2004
Bangkok Industrial
Gases
- BIGIII Liquifier Upgrade
Project
EPC
2004
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
continued on next page……
-- 93 --
Major Reference – Thailand
Client
Project
SIEMENS
- Piping Work for IPT Power
(3/7)
Scope
Completion
EPC
2004
Plant
Thai Olefins Co.,
- New Parallel Cold Train
EPC
2004
Tuntex
- CTA-RVF Project
EPC
2004
MAXXIS International
- Rubber Tire Plant
C
2004
Thai Caprolactum Co.,
- New Train of NH3 Oxidizer
EPC
2003
HMC
- Deduster Project
EPC
2003
Cementhai / SMPC
- P-Xylene Tank Project
EPC
2003
Thai Industrial Gas
- Steel Structure and Pipe Line
C
2003
Thai Polyethylene Co.,
- R-1 Expansion Project
EPC
2002
Thai Polyethylene Co.,
- Low Polymer Transfer Line
EPC
2002
Legend:
E -on
Engineering;
P - Procurement; Ps - Procurement Service; C - Construction
continued
next page……
-- 94 --
Major Reference – Thailand
Client
Project
Peroxythai
- Distillation Upgrade
Tuntex
- Feasibility Study for Plant
(4/7)
Scope
Completion
EPC
2002
E
2002
Expansion
Thai Polyethylene Co.,
- LLDPE Modification Project
EPC
2002
Thai Olefins Co.,
- New Ethylene Recovery
EPC
2001
- Year 2002 Debottleneck
EPC
2001
- Year 2001 Debottleneck
EPC
2001
C
2001
Compressor Installation
HMC Polymers
Bayer Polymer
- BPA and PC II Expansion
- PC II Mechanical Work
Legend:
E – Engineering
P – Procurement
C – Construction
CM - Construction Management
Ps - Procurement Service
-- 95 --
Major Reference – Thailand
Client
Project
Thai MMA
(5/7)
Scope
Completion
New MMA Tank
EPC
2001
Thai MMA
TBA #2
EPC
2001
Diapolyacrylic
PMMA Plant Modification
EPC
2001
PPG Coatings
Coating Plant Modification
EPC
2001
Tuntex
PTA Plant Waste Gas
EPC
2000
Petrochemicals
Venturi Scrubber
Siam Styrene
SM Furnace Modification
C
2000
Admin. Bldg. Extension
EPC
2000
Rohm & Haas
Poly Acrylic Acid Plant
EPC
1999
Chemical
22,000 MTA
Monomer
The Aromatics
Thailand
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
-- 96 --
Major Reference – Thailand
Client
Scope
Completi
EPC
1998
170 MW CCPP Piping Work
EPC
1998
Thai Industrial Gases
ASU 400 TPD
EPC
1997
Rayong Purifier
Purifier Unit 17,000 BPSD
E
1997
Siam Styrene
SM Fire Heater
C
1996
EPC
1996
C
1996
EPC
1996
Rayong Purifier
Projec
(6/7)
Fired Heater for Purifier Unit
17,000 BPSD
Siemens Power Gen/
Amata-EGCO Power
Monomer
TPC-OXY
PVC Paste Resin Plant
25,000 MTA
Thai Oil
HCU-2 Piping Work
HMC Polymers
PP-II Plant 170,000 MTA
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
-- 97 --
Major Reference – Thailand
Client
Project
Grand Pacific
ABS/SAN Plant Expansion
Chemical
18,000 MTA
HMC Polymers
Vinythai
(7/7)
Scope
Completion
EPC
1995
PP-I Plant Upgrading
EPC
1995
VCM/Chlorine Plant 140,000
EPs
1995
ABS/SAN Plant 46,000 MTA
EPs
1995
Tuntex Petrochemicals
PTA Plant 350,000 MTA ISBL
EPC
1995
Thai Oil
Various Construction Work
C
1994
Bangchak Petroleum
Gas Oil HDS 18,000 BPSD
EPC
1993
Bangchak Petroleum
Plant No. 2 Modification
E
1992
Thai Oil
Sriracha Refinery Expansion
C
1989
MTA
Bayer Polymer
(was “MPKC”)
(TOC II)
Legend: E - Engineering; P - Procurement; Ps - Procurement Service; C - Construction
-- 98 --
CTCI
CTCI Operation

In Vietnam
-- 99 --
CIMAS Engineering Co., Ltd.
Corporate Overview
Established in
July 2001
Registered Capital
USD 5M
Share Holders
- CTCI Overseas, HK
50%
- LILAMA, Vietnam
33%
- Sincerity Eng’g., Taiwan
17%
Office
Hanoi
Number of Employees
157
New Orders (2006)
USD 6.6M
Turnover (2006)
USD 2.5M
Current Backlog
USD 7.0M
-- 100 -
Major Reference in Vietnam
Kim Lien & Truc Bach Waste
Water Treatment
Piping Design
Van Tri Waste Water
Treatment Plant
Piping Design
Da Nhim Rehabilitation
Field Engineer
7km Phu My-Go Dau pipeline
Instrument Design
Ca Mau 1 & 2 Power Plant
Piping
Design,Procure,Construction
Na Duong Power Plant (2x50MW)
Electrical Design
Dung Quat Refinery Package 2&3
Detail Design
Dung Quat Refinery-Building
Works
Design
Phu My 3 Power Plant
Piping Design & Field Engineer
Condensate Processing Plant
Piping, Civil Design
& Field Engineer
-- 101 -
Major Reference – Vietnam
__Client
Project
(1/3)
Scope
Completion
MHI
Da Nhim Rehabilitation
E
Ongoing
TPGM
Dung Quat Refinery Project
E
Ongoing
(Building Work for P1, P2 & P3)
MHI/MC
Omon 1A Thermal Power Plant
E
Ongoing
Siemens
Ca Mau I&II CCPP Piping Work
EPC
Ongoing
Petro-Vietnam
Condensate Process Plant
EPC
2006
E
2005
Petroleum
Development Co.
EBARA
Kim Lien & Truc Bach
Waste Water Treatment
-- 102 -
Major Reference – Vietnam
Client
ECC 45-1
Project
7 Km Pipeline-Phu My Go Dau
(2/3)
Scope
Completion
E
2004
EPC
2004
E
2003
(Low Pressure Pipeline)
Siemens
Phu My 3 CCPP Piping Work
EBARA
Van Tri Waste Water
Treatment Plant
LILAMA
Na Duong 2x50MW Power Plant
E
2003
ZNSM
Package 2 & 3
Dzung Quat Refinery
E
Put on hold
Legend:
E – Engineering
P – Supply
C – Construction
Ps - Procurement Service
CM - Construction Management
-- 103 -
CTCI

CTCI Reference
In Singapore,
Malaysia, Indonesia
& The Philippines
-- 104 -
Major Reference in Malaysia
Teluk Gong Panglima Power
CCGT Piping Project
Kuala Lumpur

Titan Butadiene/Propylene Plant
Melaka
Malaysian Refining Co.
PSR-II Melaka Refinery
Titan PP Plant
l
Johor Bahru
l
Titan OSBL Pipelines Project
-- 105 -
Major Reference in the Philippines
Petron / Gas Oil Hydrotreater #3
and Isomerization Unit
Bataan
 Manila

Batangas
San Lorenzo 500 MW Piping
-- 106 -
Major Reference in Singapore
PUB / Senoko Power Station
Fuel Oil Tank Facility
Esso / Power System Expansion
SRC /
Visbreaker Project &
Catalytic

PUB / Senoko Power Station
Electrochlorination System
Seletar
Singapore
Jurong

PUB / Jurong Power Station
2x100MW Gas Turbine Construction Work
SRC / HCU-2 Project Piping Work
Esso /
Propane Recovery
from CVS
SRC / RCC Project Piping Work
Chevron / Lube Oil Additive
Engineering Work
-- 107 -
Reference – Singapore, Malaysia,
Indonesia & the Philippines (1/4)
Client
Project
Scope
Completion
 Singapore……1
Chevron Chemical
Lube Oil Additive
E
1997
Singapore Refinery
RCC Project Piping Work
C
1995
Singapore Refinery
HCU-2 Project Piping Work
C
1986
PUB
Jurong Power Station 2x100MW
C
1986
Gas Turbine Construction Work
continued on next page……
-- 108 -
Reference – Singapore, Malaysia,
Indonesia & the Philippines (2/4)
Client
Project
Scope
Completion
EPC
1985
 Singapore……2
PUB
Senoko Power Station
Electrochlorination System
Esso Refinery
Propane Recovery from CVS
EPC
1985
PUB
Senoko Power Station Fuel Oil
Tank Facility
Power System Expansion
EPC
1984
EPC
1983
Visbreaker Project & Catalytic
Reformer Piping Work
E-C
1983
Esso Refinery
Singapore Refinery
continued on next page……
-- 109 -
Reference – Singapore, Malaysia,
Indonesia & the Philippines (3/4)
Client
Project
Scope
Completion
 Malaysia
Titan Petchem (M)
Butadiene/Propylene Project,
Pasir Gudang
EPC
Ongoing
Teluk Gong Panglima
Power Co.
Panglima CCGT Piping Work,
Melaka
EPC
2002
Titan Petchem (M)
OSBL Pipelines, Pasir Gudang
EPC
2000
Titan Petchem (M)
PP Plant 100,000 MTA,
Pasir Gudang
E
1991
Malaysian Refining
PSR-II Melaka Refinery
E
1996
continued on next page……
-- 110 -
Reference – Singapore, Malaysia,
Indonesia & the Philippines (4/4)
Client
Project
Scope
Completion
EPC
2005
F.S.
2002
EPC
2002
 Philippine
Petron
Gas Oil Hydrotreater #3
22,000 BPSD and Isomerization
Unit 11,000 BPSD
Petron
Gas Oil Hydrotreater #3
22,000 BPSD
Basic Engrg.
First Gas Power
San Lorenzo 500 MW Piping
Work, Batangas
Legend:
E – Engineering
C – Construction
P – Procurement
Ps - Procurement Service
CM - Construction Management
-- 111 -
CTCI
CTCI Operation

In The Mid East
-- 112 -
Major Reference in Middle East
14
3
4
6
9
10
13
16
5
7
8
1
2
QATAR
11 12 15
UAE
1
Riyadh Refinery Plant Expansion-KSA
2
Riyadh Water Transmission System Pumping
Station -KSA
3
Aqaba Fertilizer Plant- Jordan
4
Yanbu Domestic Refinery-KSA
5
Yanbu Export Fuel Refinery-KSA
6
Yanbu Lube Oil Refining (Luberef II)-KSA
7
EG & Polymer Plant-KSA
8
Hydro-Chlorination Generation Unit-KSA
9
Ethylene Plant-KSA
10
EG & LLDPE Plant-KSA
LNG Plant-Qatar
12 Methanol & MTBE Plant-Qatar
11
13 Fertilizer Plant Urea Quality Improvement-KSA
14
ABS/SAN Plant - Iran
15 Ethylene Plant Expansion- Qatar
16
Saudi Kayan EO/EG Project- KSA
-- 113 -
Major Reference- Middle East
Petrochemical Field (1/3)
Client
Location
Project
Scope
Completion
Saudi Kayan
Petrochemical
Company
Jubail,
KSA
Saudi Kayan EO/EG
Project
EPC
Ongoing
Qatar Petrochemical
Co., (QAPCO)
Mesaieed,
Qatar
Ethylene Plant
Expansion
525,000 MTA to
720,000 MTA
S&W Process
EPC
Ongoing
Ghaed Bassir
Golpayegan, Iran ABS/SAN Plant
Petrochemical Co., Ltd
ABS: 35,000 MTA
SAN: 22,000 MTA
Kumho Process
EPCM
2004
Al Jubail Fertilizer Co.
(SAMAD)
EPsCa
2002
Jubail,
KSA
Fertilizer Plant Urea
Quality Improvement
630,000 MTA
Stamicarbon Process
continued on next page……
-- 114 -
Major Reference- Middle East
Petrochemical Field (2/3)
Client
Location
Project
Qatar Fuel Additives
Mesaieed,
Methanol & MTBE
Co., Ltd.
Qatar
Plant
(QAFAC)
Scope
Completion
E
1998
E
1996
MeOH: 830,000 MTA
MTBE: 600,000 MTA
MeOH:ICI Process
MTBE: UOP Process
Qatar Liquefied Gas
Ras Laffan
Co., Ltd.
Qatar
LNG Plant
(QATARGAS),
continued on next page……
-- 115 -
Major Reference- Middle East
Petrochemical Field (3/3)
Client
Location
Arabian Petrochemical Co. Jubail,
(Petrokemya)
KSA
Project
Ethylene Plant
500,000 MTA.
•
Eastern Petrochemical Co Jubail,
(SHARQ)
KSA
EG & LLDPE Plant
EG: 450,000 MTA
Shell Process
LLDPE: 300,000 MTA
UCC Process
EC
1985
•
Saudi Yanbu
Petrochemical Co.
(YANPET)
Yanbu,
KSA
EG & Polymer Plant
EG: 220,000 MTA
SD Process
HDPE/LLDPE:
300,000 MTA
UCC Process
C
1984
•
Jordan Fertilizer
Industry Co., Ltd.
Jordan
Aqaba Fertilizer Plant
C
1982
•
Scope Completion
C
1985
-- 116 -
Major Reference – Middle East
Refinery Field
Client
Location
Project
Petromin Lubricating
Yanbu,
Yanbu Lube Oil
Oil Co.
KSA
Refining (Luberef II)
25,400 BPSD
Mobil Process
•
Petromin Mobil Yanbu
Refinery Co. Ltd.
Yanbu,
KSA
Yanbu Export Fuel
Refinery
•
General Petroleum &
Mineral Organization
(Petromin)
Yanbu,
KSA
•
General Petroleum &
Mineral Organization
(Petromin)
•
Scope
Completion
E
1996
EC
1982
1984
Yanbu Domestic
Refinery
C
1982
Riyadh,
Riyadh Refinery
KSA
Plant Expansion
UOP Process
C
1980
-- 117 -
Major Reference – Middle East
Others
•
•
Client
Location
Project
Jeddah Oil Refinery
Jeddah,
Hydro-Chlorination
Co.
KSA
Generation Unit
Saline Water
Riyadh,
Riyadh Water
Conversion Corp.
KSA
Transmission
Scope
Completion
EPC
1984
E
1984
System Pumping
Station
Legend:
E – Engineering
Ps - Procurement Service
Ca – Construction Advisor
P – Supply
C - Construction
CM - Construction Management
-- 118 -
CTCI
CTCI Operation

In Other Areas
-- 119 -
Reference – Other Areas
Client
Location
Project
Formosa Plastics USA
USA
Westlake Group
(1/2)
Scope
Completion
OL-2 OSBL
E
1999
USA
IEM Revamping
E
1999
Formosa Plastics USA
USA
Gasoline HDS
E
1997
Karnaphuli Fertilizer
Bangladesh
Fertilizer Plant
E
1992
Formosa Plastics USA
USA
OL-1 OSBL
E
1991
Guam Oil & Refinery
Guam
Jet Fuel
Modification
E
1977
continued on next page……
-- 120 -
Reference – Other Areas
Client
B&W
Location
Project
USA
De-NOx SCR
(2/2)
Completion
E+P
for Power Plant
- Campbell, Michigan
- Lewis Creek, TX
- Karn, Michigan
- Huntington Beach
2004
2003
2002
2001
EPC
2002
E
1999
Westlake Group
USA
IEM Plant
Formosa Plastics
USA
USA
VCM Plant
Debottlenecking
Legend:
E - Engineering
C - Construction
Scope
P - Procurement
Ps - Procurement Service
CM - Construction Management
-- 121 -
CTCI
Thank You Very Much
