Transcript Document
Strategii si prioritati ale CN Transelectrica SA Seminar Thessaloniki 7/6/2015 1 Cuprins prezentare 1. Transelectrica astazi. Realizari strategice in dezvoltarea si modernizarea infrastructurii 2. Politica energetica nationala in context european. 7/6/2015 2 3. Transelectrica : strategia corporativa Transelectrica si structura institutionala a SEN Ministry of Economy and Commerce GENERATING COMPANIES HIDROELECTRICA ANRE The Regulatory Authority TRANSELECTRICA The National Grid Co. DISTRIBUTION AND/OR SUPPLY COMPANIES NUCLEARELECTRICA ELECTRICA DOBROGEA ( ENEL) C. E. ROVINARI Ownership unbundling C. E. CRAIOVA C. E. TURCENI TERMOELECTRICA OPCOM The market Operator ( a 100% TEL subsidiary ) ELECTRICA BANAT ( ENEL) ELECTRICA OLTENIA (CEZ ) E-ON MOLDOVA ELECTRICA MUNTENIA SUD ENEL ELECTRICA TRANSILVANIA NORD ELCEN BUCURESTI Captive Consumers ELCEN DEVA ELECTRICA TRANSILVANIA SUD SELF PRODUCERS & IPPs ELECTRICA MUNTENIA NORD Eligible Consumers Other Distributors and Suppliers 7/6/2015 Full legal unbundling 3 Transelectrica si structura pietei angro de electricitate ENERGY Bilateral Market ( Voluntary ) Centralized bilateral market Day Ahead Market ( Voluntary ) 7.74 % market share 2006 POWER Ancillary Services Market ( Voluntary ) Transelectrica Balancing Market ( Mandatory ) Capacity Allocation Market ( Voluntary ) - on Interconnection OHLs - Phisical notifications Imbalances ( BRP ) Rebalancing ( DU ) 7/6/2015 BRP- balancing responsible party DU- dispatchable unit 4 Structura pietei angro- participanti licentiati ANRE 25 Distribution operators (8 Electrica ) 4 Ancillary Services Suppliers 134 Suppliers 68 Producers Eligible Customers 7/6/2015 5 Transelectrica - RET – Transelectrica runs about 8,935 km of Over Head Lines (OHL) • 154.5 km with 750 kV • 4,637.6 km with 400 kV • 4,101.9 km with 220kV • 41.4 km with 110 kV – Transelectrica operates 79 substations in Romania • 1 with 750 kV • 33 with 400 kV • 45 with 220 kV – The total transmission capacity is 22,000 MW – Strong interconnection capacity and under further development • A modern and strong telecommunication network in optic fiber (aprox. 5,000 km) • A modern and strong dispatching infrastructure (EMS-SCADA) • A modern and strong metering system for the wholesale market 7/6/2015 6 De la retea traditionala la “ smart grid “ Towards a state of the art grid The grid today: (as a result of major CAPEX effort for essential projects) THE NEW DISPATCHING INFRASTRUCTURE, INCLUDING OPTIC FIBER BACKBONE THE NEW MARKET INFRASTRUCTURE • THE NEW TRADING PLATFORMS • THE NEW METERING INFRASTRUCTURE The grid: relatively large but with old technologies; Lack of proper CAPEX for modernization 7/6/2015 2000 REHABILITATION AND MODERNIZATION IN MAJOR IMPORTANT SUBSTATIONS DEVELOPMENT OF THE INTERCONECTION CAPACITY ON OHL 2006 7 •Moody’s Rating: as for Nov 30, 2006 "Proprietatea" Fund 13.5% Individuals 3.3% Other 10.0% Ministry of Economy and Commerce (Romanian State) 76.5% • Outlook: Stable • Corporate Family Rating: Baa3 Legal entities 6.7% –TEL was introduced into: • Dow Jones Wilshire Global Total Market Index • Dow Jones Wilshire Emerging Market Index 7/6/2015 8 2 Politica energetica nationala in context european • Siguranta energetica si infrastructura • Piata de electricitate 7/6/2015 9 Cartea verde europeana –martie 2006 : o strategie Europeana pentru energie sustenabila, competitiva si sigura Six Priority areas are underlined in the paper: •Competitiveness and the internal energy market •Diversification of the energy mix •Solidarity between nations •Sustainable development •Innovation and technology •External Policy: speak with a common voice. 7/6/2015 Centre de Géopolitique de l’Énergie et des Matières Premières 10 Pachetul energetic european – 10.01.2007 A Powerful communication A deepening of the vision More affirmative targets (20-20-20 to 2020) The question of unbundling A more radical competition policy The key role of ERGEG-Plus 7/6/2015 de l’Énergie et des Matières Premières Centre de Géopolitique 11 Cele trei provocari • •Internal Market •Interconnections (Trans-European networks) •European electricity and gas network •Research and innovation •Clean coal •Carbon sequestration •Alternative fuels •Energy efficiency •Nuclear Competitiveness “LISBON” FULLY BALANCED INTEGRATED Sustainable Development “KYOTO” AND MUTUALLY REINFORCED Security of supply „MOSCOW“ •Renewable energy •Energy efficiency •Nuclear •Research and innovation •Emission trading 7/6/2015 •International Dialogue •European stock management (oil/gas) •Refining capacity and energy storage •Diversification 12 12 Securitatea energetica si riscul investitional EU-27 INVESTMENT NEEDS up to 2030: €1.79 trillion RES-H,T 5% Generation 65% Coal 1% Electricity 77% Gas 12% Oil 5% Transmission 8% Distribution 27% Source: EUROSTAT 7/6/2015 13 ETSO si cresterea capacitatii de interconexiune • ETSO overview of administrative procedures for constructing 110 kV to 400 kV overhead lines shows • In theory : 5 years when there is no obstacle or opposition • In most cases : 10 years without major opposition • With obstacles and opposition: up to 20 years or never • Despite simplified authorisation procedures in some MS, the main difficulties remain • Veto powers of the Regions in the context of Public hearing; • Number of Entities in charge of • Permissions (Ministry, Regions, Local authorities, other public bodies) • Environmental Impact Assessment (Ministry, Regions) Have “only” TSOs been slow?? 7/6/2015 14 Transelectrica activity overview Transelectrica 400 kV interconnection OHL projects • 400 kV OHL Oradea – Bekescsaba • contacted, financed, under execution; • contracted time of completion: 03.2008; • 400 kV OHL Timisoara –Vrsac • system studies; • feasibility study scheduled in 2007; • linked with 400 kV upgrading of the existing 220 kV OHL in Banat area; • financing targeted for EU structural funds; • 400 kV OHL Suceava – Balti (R of Moldova) – Dniestrovsk (Ukraine) • linked with 400 kV OHL Gadalin Suceava; • Linked with Ukraine and R of Moldova admission process in UCTE; • Feasibility study to be financed ( 7/6/2015 EBRD grant ) and launched in 2007; 15 Dezvoltare si modernizare infrastructura RET EUR million 2006 2007 2008 2009 2010 2011 2012 2013 Annual CAPEX ( last BP ) 113.4 110.5 57.6 52.8 52.1 48.4 56.6 55.3 141 123 125 110 101 102 89 61 Values for the new BP • a new package of additional 16 electrical substations to be modernized and rehabilitated 220/110kV Barbosi, 400/220/110kV Bradu, 400/110kV Brasov, 220/110kV Craiova Nord, 400/110kV Domnesti, 400/110kV Gura Ialomitei, 220kv Isalnita, 400/220/110kV Lacu Sarat, 220kV Mintia, 400/110kV Pelicanu, 220 kV Resita, 400/110kV Smardan, 220/110kV Stejaru, 110kV Timisoara and 220/110kV Turnu Severin Est, 220/110kV Ostrov • enhanced transmission and interconnection capacity : Finalization of the new 400kV OHL Oradea Bekescaba ( Hungary ) Construction of the 400kV OHL Suceava - Gadalin and Suceava (RO) - Balti (Republic of Moldova) (2010) Transition to 400kv of the OHL Portile de Fier I – Resita – Timisoara – Arad (2011-2014) and construction of the 400 kV OHL Timisoara – Vrsac (Serbia ) 2 new OHLs for grid connection of Tarnita – Lapusesti pump storage facility ( 900 MW ) • 7/6/2015 undersea HVDC link between Romania and Turkey (not yet included in the business plan) 16 Strategia TEL : protectia infrastructurii critice • • • • • Evaluarea vulnerabilitatilor si managementul riscului Capacitatea de raspuns la amenintari. Managementul situatiilor de criza Planuri de continuitate a proceselor Comunicatii 7/6/2015 17 Piete competitive sunt esentiale - 1 • Security of supply requires – reliable networks, – adequate electricity generation capacity – a diversified portfolio of gas supplies • Competitive markets – Provide the best investment signals for networks, generation capacity, gas production and import pipelines – Encourage operational efficiency (eg maintenance at least disruptive periods) – Encourage energy efficiency and consumption at offpeak periods 7/6/2015 18 Piete competitive sunt esentiale - 2 • EU needs competitively priced energy to meet its Lisbon objectives • Competitive markets – Provide cost-reflective prices to end consumers – Encourage efficient investment and operation which drive costs down • Regulated tariffs – Obscure price signals, discourage investment or new entry to the market – Higher costs passed on to the future 7/6/2015 19 Cuplare piete F-B-NL utilizare capacitate 11-12.12 Pre- Market coupling F-B-NL 7/6/2015 Post- Market coupling F-B-NL 20 Cuplare piete si convergente preturi – F-B-NL Price convergence 7/6/2015 21 3 Transelectrica : strategia corporativa 7/6/2015 22 Transelectrica : prioritati ale strategiei corporative • Cresterea capacitatii de analiza si studii strategice de sistem in beneficiul autoritatilor centrale (Guvern, MEC, ANRE) • Sprijin filiale : dezvoltarea corporativa OPCOM pentru piata interna si cea regionala • Cresterea nivelului de coordonare si conlucrare cu ANRE • Perfectionarea guvernantei corporative • Cresterea prezentei Transelectrica pe piata de capital 7/6/2015 23 Government objectives Restructurarepolicy si Privatizare TRANSELECTRICA Operator de Transport si Sistem 2000 TRANSELECTRICA Operator de Transport si Sistem 2007 OPCOM OPCOM SMART Externalizarea activitatilor suport Organizarea activitatilor pe proiecte si centre de cost Managementul operational pe baza Planului de Afaceri Infiintarea filialei de telemasurare pe piata angos de energie electrica C. N. Transelectrica S.A. detine 100 % din capitalul filialelor sale. TELETRANS FORMENERG ICEMENERG Filiale cu activitati strans legate de activitatile de baza ale Transelectrica 7/6/2015 Filiale care urmeaza a fi privatizate incepand cu 2007 ICEMENERG Service 24 Transelectrica are capacitatea si disponibilitatea de a sustine activ si eficient la elaborarea si implementarea Politicii Energetice Nationale 7/6/2015 25 Va multumesc pentru atentie !