CHECKPOINTS OF THE PROCESS
Download
Report
Transcript CHECKPOINTS OF THE PROCESS
CHECKPOINTS OF THE PROCESS
PRASHANT SINGH
1706225
ROHIT GARG
1706237
It is always important to have
visible milestones in the life
cycle where various
stakeholders meet, face to
face ,to discuss progress and
plans
Purpose of the milestones in the
lifecycle :
• Demonstrate how well a project is performing.
• Synchronize stakeholders expectations.
• Achieve concurrence on three evolving
perspectives: the requirements ,the design, and
the plan.
• Synchronize related artifacts into a consistent
and balanced state.
• Identify the important risks,issues,and out-oftolerance conditions.
• Perform a global assessment for the whole
lifecycle ,not just the current situation of an
individual perspective or intermediate
product.
Three types of joint management
reviews are conducted throughout the
process:
• Major milestones
• Minor milestones
• Status assessments
MAJOR MILESTONES
• These system wide events are held at the end
of each development phase.
• They provide visibility to system wide issues.
• Synchronize the management and engineering
perspectives.
• Verify that the aims of the phase have been
achieved .
Life-Cycle Objectives Milestone
• Occurs at the end of the inception phase.
• Present to all stakeholders a recommendation
on how to proceed with development
,including a plan, estimated cost and schedule
,and expected benefits and cost savings.
LIFE CYCLE ARCHITECTURE MILESTONE
• Occurs at the end of the elaboration phase.
• Demonstrate an executable architecture to all
the stakeholders.
• A more detailed plan for construction phase is
presented for approval.
• Critical issues relative to requirements and
operational concept are addressed.
INITIAL OPERATIONAL CAPABILITY
MILESTONE
• Occurs late in the construction phase.
• Assess the readiness of the software to begin the
transition into customer/user sites
• Authorize the start of acceptance testing .
• Issues are addressed concerning installation
instructions, software versions descriptions ,user
and operator manuals ability of the development
organization to support user sites.
• Software quality metrics are reviewed to
determine .
• The readiness of the test environment and the
test software for acceptance testing is
assessed.
PRODUCT RELEASE MILESTONE
• Occurs at the end of the transition phase.
• Assess the completion of the software .
• Results of the acceptance testing are
reviewed.
• Open issues are addressed.
• Software quality metrics are reviewed.
MINOR MILESTONE
• These iteration-focused events .
• Conducted to review the content of an
iteration in detail .
• Authorize continued work.
MILESTONE OF AN ITERATION
• Iteration Readiness Review.
• Iteration Assessment Review.
PERIODIC STATUS ASSESSMENTS
• Serve as project snapshots
• A mechanism for open addressing
,communicating and resolving management
issues ,technical issues, and project risks.
• Objective data derived directly from on-going
activities and evolving product configurations.
• A mechanism for disseminating
process,progress,quality trends,practices,and
experience information to and from all
stakeholders in an open forum.