The Practical & Financial Success
of the
Olathe Watershed Study
ASFPM
May 19, 2010
Presented by
Brenda Macke, P.E.
CDM
Today’s Presentation
Background
The Practical Success
The Financial Success
Next Steps/Current Status
Background
Johnson County, KS
20 incorporated cities
Population 451,086
(2000 census)
Total land area =
480 sq miles
Johnson County
Stormwater
Management Program
Background
1998 – 2002
7 Watershed Studies
Goals:
– Identify flooding
problems
– Develop solutions
– Generate new 100-yr
floodplain maps for
existing and fully
developed conditions
– Update FEMA regulatory
100-yr floodplain maps
2007 - City of Olathe
Investigating general
flooding complaints
Notifying property
owners of floodplain
updates
City of Olathe
GOAL: Coordinate
stormwater
management with
Johnson County to
maximize funding
Stormwater
Management
Advisory Council
(SMAC)
For projects that
qualify, SMAC
funds 75% of the
cost
The SMAC Process
SMAC’s Primary Goal: Funding projects that
eliminate structure and street flooding
Funded through a 0.1% sales tax in Johnson County
To be eligible for SMAC funding several steps must
be taken:
Quantify the extent of flooding in an initial SMAC packet
Complete a Preliminary Engineering Study
Evaluation by SMAC of Preliminary Engineering Study
Placement on SMAC funding list, based on estimated cost
of the project vs. flood reduction benefit
THE PRACTICAL SUCCESS
General Project Area
Example: Preliminary Engineering
Study Results
Location: 147th Terr & Brougham Dr
Total Planning Level Project Cost:
$1,400,000
Eligible for SMAC Funding:
$1,050,000
Proactive Public Participation
www.olathewatershed.org
Prioritize Preliminary Engineering Study
Solutions
THE FINANCIAL SUCCESS
2010 SMAC Funding
Cost Benefit Rating
City
Design &
Construction Cost
Estimate
1(a)
Shawnee
$2,348,000
70th & Flint, south of Yager
2,348
Shawnee
$434,300
77th & Bradshaw St
2,552
Shawnee
$459,400
77th & Richards Dr
3,031
Shawnee
$773,000
50th & Nieman
3,235
Spring Hill
$452,900
Nichols & Race St
4,242
Roeland Park
$1,315,000
Cooper Creek
4,471
Lenexa
$581,205
108th & Pflumm
5,826
Shawnee
$1,136000
57th & Cody
6,495
Overland Park
$3,215,000
95th & Riley
7,189
Shawnee
$2,228,500
55th Terr & Earnshaw
7,759
Overland Park
$1,707,000
99th & Metcalf
8,445
Lenexa
$844,500
101st Terr & Darnell
8,889
Olathe
$1,400,000
W 147th Terr & S
Brougham Dr
10,118
Overland Park
$3,440,000
151st Terr & Metcalf
10,825
Overland Park
$3,410,000
71st & Glenwood
14,615
Olathe
$1,900,000
W 151st St & S Quivira
Rd
Location
2010 SMAC Funding
LOCATION: 147th Terrace & Brougham Dr
Total Estimated
Project
Construction Cost =
$1,400,000
2010 SMAC Funding
LOCATION: Harmony View West (151st & Quivira)
Total Estimated
Project
Construction Cost =
$1,900,000
Summary: Olathe Stormwater
Cost & Resulting SMAC
Funding
Project Phase
City Cost
SMAC Funding
Watershed Preferred
Alternatives Study
$382,672
$238,618
Design & Construction –
147th Ter. & Brougham
Dr. Improvements
$350,000 (est.)
$1,050,000
Design & Construction –
Harmony View West
Improvements
$475,000 (est.)
$1,425,000
TOTAL COST
$1,207,672
$2,713,618
STORMWATER STUDY FUNDING
SUMMARY
$3,000,000
$2,475,000
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$382,672
$0
Cost to City to fund 9 Preliminary
Engineering Studies
Outside funding obtained to
construct 2 improvements
Next Steps / Current Status
Construct improvements utilizing 2010 SMAC
Funding
147th Terrace & Brougham
Harmony View West
Maximize funding
Complete 11 additional Preliminary Engineering Studies
and submit to SMAC.
– Estimated Total Fee = $450,000, City Share = $160,000
Investigate and apply for additional outside funding at a
state/federal level.
Engage the public through website and
neighborhood meetings.
Questions?