Kick Off Meeting

City of Pensacola April 18, 2011

• •

Study Purpose

• Determine the best solution for replacement of the existing bridges and secure FHWA approval of the location and concept design

Basis for performing the replacement bridge study

• Lack of modern safety provisions • No facilities for bikes and pedestrians • Does not meet current navigation requirements • Deteriorating conditions indicate that bridges are structurally obsolete • Determine the requirements to meet increasing traffic demands

Planning

• Candidate Projects Based on Preliminary Analysis and determination of need • Prioritize Projects • Funding Options/Availability Reviewed/Programming

Project Development & Environment Study

• Develop Preliminary Alternatives • Assessment of Potential Environmental & Community Impacts • Substantial Public Involvement Initiatives • Preferred Alternative(s) advance to Preliminary Engineering

Preliminary Design Final Design

• Develop up to 30% Design Plans • Additional Public Outreach • Agency Coordination • Proceed through Design, 60, 90 % plans • Permitting Process • Final Cost Estimates

Right-of-Way/ Acquisition

• Proceed with acquisition of necessary property

Construction

Project Development & Environment Study

• Evaluate Current Conditions – Data Collection • Environmental, Social, Engineering • Forecast Future Needs – Traffic • Evaluate Alternative Corridors & Select One • Develop Alternatives Within Selected Corridor • Perform Assessments of Potential Environmental & Community Impacts • Select an Alternative to advance into Preliminary Engineering

• Throughout the study conduct a comprehensive and continuous Public Involvement Program

Newsletters Community Stakeholders Website pensacolabaybridge.com

Neighborhood Associations Local Government Special Interest Groups Informal Public Meetings Local, State & Federal Officials Project Advisory Group (PAG) One – On – One Meetings

Contact US!!

www.PensacolaBayBridge.com

J. Brandon Bruner, PE Project Development Engineer FDOT, District 3 1074 Highway 90 Chipley, FL 32428 850-415-9625 [email protected]

Dan Kristoff, PE Project Manager RS&H 10748 Deerwood Park Blvd South Jacksonville, FL 32256-0597 Phone: 904-256-2139 [email protected]

Nick Arnio, PE, PTOE Deputy Project Manager RS&H 1701 Hermitage Blvd., Suite 101 Tallahassee, FL 32308 Phone: 850-558-2800 [email protected]