Nov 13 Product Roadmap

Download Report

Transcript Nov 13 Product Roadmap

Broadband Product Road Map
2013/14 H1
2014/15
2013/14 H2
20C
Migration from 20C IPstream to 21C Wholesale Broadband Connect
IPstream ‘Stop Sell’
IPstream retirement within WBC footprint & Datastream in total
21C
WBC rollout to further 195 sites
95th Percentile billing on WBMC launched
Ofcom Broadband Market Review Outcome
Out of hours migration product available
Asset report: map users to network element
Launch 40G host links
WBMC launch metro-node handover
WBMC Daytime bandwidth offer
TR101 Upstream line synch info delivered
“Preponing” (copper and fibre)
Openreach KCI notes via B2B & Portal
Automatic ordering for bandwidth modify
WBMC reseller model
MSE Trials
Fibre
Further WBC expansion (To be agreed)
Multi-Service Edge Rollout and Migration
Consume BB regenerator
Review of cool Broadband
Multi-Service Edge Further rollout
Self install and PCP only trials
BBAC speed ranges
FTTC: Provide on cease
FTTP Full Commercial launch inc 220Mb
Wires only self install
FTTC: More focused appointments
Fibre on Demand Trial
KCI improvements
Sim 2 for PCP only FTTC
Vectoring Trials
SIM 2 for FTTC
Bulk Checker automation
Availability Checker usability improvement
Automatic Expedites
Fibre on Demand: ECC notification
FTTP 1XX, 40/15, 330/20 Stop Sell
FOD distance based charging & full launch
End of commercial rollout
FTTC SIM provide Expedite
Flexible appointing for FTTC LTC orders
EMP Mitigation and Consumption
BD UK areas roll out
1
Implement Ofcom Consumer switching
Future activities are aspirational and not fully committed
We’re deploying a new Multi-service edge (MSE) BRAS to meet
growing demand. We have 1 million end users on MSE.
What are BT doing?
When?
Who is affected?
What does it
mean for you?
Further information
2
• Growth in bandwidth demand from increased volume and usage requires us to
expand the BT Wholesale 21CN Broadband Platform.
• We are introducing a new Broadband Remote Access server (BRAS) called Multiservice Edge (MSE)
•
•
•
•
We’re deploying, and migrating end users to, 457 MSEs by March 2014
Over 219 deployed so far.
Over 1 million end users on MSE
New orders go onto the MSE in areas where an MSE is deployed.
• Every CP is affected whether you buy WBC, WBMC Dedicated or WBMC Shared
• Copper or Fibre
• As planned, your end users are being migrated overnight with service outages.
• We were moving Customer VLANs and Service VLANs.
• Outages are currently averaging <1min on CVLANs and 16 mins on SVLANs
• See briefings: BB450-12, BB589-12, BB795-13 and BB 796-13 and previous ISP
forum presentations all to be found at btwholesale.com.
• Please contact [email protected]