MillerCoors Golden
Brewery
Sustainability Improvement
.
Energy
Water
Waste to Landfill
Julie Smith, PE, MS
Plant Optimization Engineer
Utilities/Technical Services
Brewery Sustainability Improvement
Agenda
• Corporate Goals/Leadership
• Brewery Processes
• Brewery Utilities
• Opportunities
• Waste to Landfill
• Culture
Corporate Sustainability Goals
Energy Usage of 128 MJ/HL by 2015
Electricity
Steam
Vehicle Fuel
Water Usage of 3.5 HL/HL by 2012
Zero Waste to Landfill by 2015
CO2 Self-Sufficiency of 85% by 2015
50% Reduction in Green House Gas by 2020
Why Sustainability?
• Customer Demand
• Continue our Business
• Save Money
• Marketing
• Responsibility for Future Generations!
Brewery Process Overview
Malting
Brewing
Fermenting
Conditioning
Packaging
Warehousing
Golden Brewery Map
Golden Brewery Layout
Aging Cellars, Hop Storage
Power
Still
Turbine
Brewing
Packaging/Warehouse/Gov. Cellar
Malting/Kilns
YDP
Fermenting
Conditioning
Brewing Process
•
•
•
•
•
Mash In
Filter/Lauter
Boil Wort
Chill
Ferment
Fermenting
•
•
•
•
•
•
Yeast + Wort = Beer
Maintain Temperature
Residence Time
CO2
Yeast
To Aging
Conditioning
•
•
•
•
Aging
Filter
Blend
To Packaging
Packaging
•
•
•
•
•
•
•
Bottles, Cans and Kegs
Rinse
Fill
Label
Package
Palletize
To Warehouse
Warehouse
•
•
•
•
Store Product
Move Product
Temperature
Docks
Utilities for Brewery Operations
Power Plant – Co-Generation
Coal and Natural Gas Fired Boilers
• 800 LB Steam
1) Electricity
2) 400 LB Steam
3) 50 LB Steam
Ammonia
• Steam
• Electricity
Plant Air
• Steam
• Electricity
Water Treatment
• Electricity
Wastewater Treatment
• Electricity
CO2 Recovery
• Electricity
Utilities – Map of Valley
Utilities – Where does the Steam Go?
Resource Savings
Opportunities
Steam
Steam Savings Opportunities
“Low Hanging Fruit”
Leaks
Traps
Control Valves
Pressure Relief Valves
Process Optimization/Team Work
Compression Equipment Operation
Problem Solving
Metering - Short-Interval Control
Set Points
CIP Times
Quality/Efficiency
Projects
HVAC
Plant Air
Refrigeration
Brew Kettles
Plant Air Usage - 2011
Plant Air to Keg
West Header
East Header
MH 20 LB
Total
14,000,000
12,000,000
Plant Air, scfd
10,000,000
8,000,000
May 13 - 15 Clean
Break
July 4
6,000,000
4,000,000
2,000,000
0
Jan-11
Feb-11
Mar-11
Apr-11
May-11
Jun-11
Jul-11
July 29
Aug-11
Sep-11
Oct-11
Nov 5
Nov-11
Dec-11
Plant Air Opportunities
Leaks
Operations
Compression Equipment
Set Points
Small Projects
Cabinet Cooling/Pressure
Venturi Vacuum
Low Pressure Uses
Condensate Drains
Pneumatic Valves and Equipment
Large Projects
Decentralization
Distribution Headers
Condensate
Return Benefits
Cost
Energy
Waste Treatment
Water Treatment
Where is it Going?
Sewer
Stack
Steam Leaks
Utilities – Where does the Electricity Go?
Resource Savings
Opportunities
Electricity
Culture
Electricity
Savings
Opportunities
No!
Lights
Office Equipment
Phantom Energy
Process Optimization/Team Work
Metering/Short Interval Control
CIP Times
Pump Control
Hard Shut-Downs
Operating Strategy
Water Usage
Quality/Efficiency
Projects
Lights
Pump VFD’s
Controls
Equipment Right-Sizing
Facilities
Yes!
Lights
HVAC
Insulation
Electricity Savings Opportunities
Malting Lights Results
Electricity Savings Opportunities
BOC HVAC Recommissioning Results
Electricity Savings Opportunities
Packaging Green Shut-Down
PKG1 Sub Power Usage - Spring 2011 Clean Break
PKG1 Sub
Bottle 3-1 Filler
Bottle 3-2 Filler
Can 1
Can 4
Can 5
1,600
1,400
Power Usage, kW
1,200
1,000
800
600
400
200
07-May
06-May
05-May
04-May
03-May
02-May
01-May
30-Apr
29-Apr
28-Apr
27-Apr
26-Apr
25-Apr
24-Apr
23-Apr
22-Apr
0
Utilities – Where Does the Water Go?
Resource Savings
Opportunities
Water and Wastewater
Savings Opportunities – Water and Wastewater
Save Water = Save Energy!
“Low Hanging Fruit”
Leaks
Controls
Nozzles
Team Work/Process Optimization
Problem Solving
Broom Not Hose
CIP Times
Cleaning Machines
Dry Lube
Seal Water
Quality/Efficiency
Projects
• Re-Use
Once-Through Cooling Water
Empty Can Rinse Water
Reject Can Conveyance
Waste to Landfill
Currently ReUse or Recycle >98% of Total Waste
•
•
•
•
•
•
•
Spent Grain
Yeast
Ethanol Still
Glass
Cans
Single Stream
Industrial (Paper, Cardboard, Stretch Wrap, Metal)
Still, 100 Ton/Month to Landfill (2010)
•
•
•
•
Goal – Zero Waste in 3 years (or pretty close)
Sort, Label, Color Code
Optimize Collection
Source Reduction
Co-Products Golden Brewery
Bill Coors: “Waste is Just a Resource Out of Place”
• Yeast – 12 MM LBS/year
• Fuel Grade Ethanol – 2.5 MM gal/year
• Spent Grain – 400 MM LBS/year
• All sold locally
• Grain Dust
• Malting
• Malt Storage
• Grain Load-Out
• Brew House
YOU’RE INVITED TO
HELP US MAKE AN IMPACT!
As a first step to make the Golden Brewery
“The Largest Zero-Waste-to-Landfill Brewery in the World”,
we need your help to:
• sort recyclables from the trash created at the brewery
• paint examples of our new standardized color-coding system of lugers/dumpsters
• draw up facts about trash and recycling at our brewery to create a great display
RSVP on the Volunteer Website (https://www.millercoorsvolunteers.com)
What: Operation Zero Waste
CARE & Volunteer Event
When: Thursday, Sept. 15th
Sorting: 7am – 8:30am
8:30 am – 10am
Visit and learn: 1pm – 4pm
Pavilion at
Investment Recovery
Employee Sales /
Beer Trailer
Where: Pavilion at
Investment Recovery
What to bring: Pants, long
sleeved shirt, PPE (bump-cap,
steel-toes, safety-vest, and
Kevlar gloves)
Culture and People
What is Culture?
Culture – What is Culture?
Definitions:
1. The quality in a person or society that arises from a
concern for what is regarded as excellent in arts,
letters, manners, scholarly pursuits, etc.
2. That which is excellent in the arts, manners, etc.
3. A particular form or stage of civilization, as that of a
certain nation or period: Greek culture.
4. Development or improvement of the mind by
education or training.
5. The behaviors and beliefs characteristic of a particular
social, ethnic, or age group: the youth culture; the
drug culture.
Culture
Elements for Success
Leadership
Green Teams
Education
Communication
Recognition
Projects
Score Cards
Culture – Green Teams
Golden Green Team – CARE
“Committed to Active Responsibility for the Environment”
•
•
•
•
•
•
Established 2006
Lunch and Learn Education
Recycling
Brown Bag Movies
Movie Library
Volunteer Opportunities
• Clear Creek Watershed
• Recycling Audit
• Holiday Meal – Zero Waste Bin Stewards
Steam
Projects
Electrical
Projects
Water
Projects
Impact
Effort
UM Prioritization by Area
Top Priorities & Assigned Leads
Brewery Priorities & Sustainability Team
Golden Brewery Energy
Consumption, Cost, Carbon
Lighting Projects
Frick #5 Evaporative Condenser
Plant Air System Projects
Heat Exchanger Condensate Return
Process
Packaging
TS
Logistics
Packaging Line “Zero
Energy” Pilot
Keg Line Air
A Water Overflow
Packaging Dry Lube
Conditioning Cold
Sanitization
Fuel Cost and Mix
Fixed Cost Elimination
Initiatives & Projects
Electrical and Steam
Meters
Metering Plan
Cooling Tower VFD’s
Metering
Strategy
Energy
Audit
Cost
Improvements
Focused Improvements
Loss & Waste Analysis
Projects
TS Initiatives
Sustainability Team
Golden Brewery
Sustainability Results - 2011
Golden Brewery 2011 Energy and Water
Reduction – Most Improved of All Breweries!!
• Reduced Total Energy by 11.9%
• Reduced Water by 4.5%
• Reduced Waste to landfill by 17%
MillerCoors Total Reductions – All 8 Breweries
• Reduced Total Energy by 3.4%
• Reduced Water by 0.9%
• Three Zero-Waste Breweries