Part L2 (2013)

Download Report

Transcript Part L2 (2013)

Modular and Portable Buildings Association

Current and Future Energy Efficiency (Building Regulations Part L2)

www.mpba.biz

Energy Compliance

Agenda

 Synopsis  Situation Analysis – ADL2A 2010  Next enforced steps – ADL2A 2013  Part L2 (2013) Awareness Sessions

www.mpba.biz

Synopsis

Route to zero carbon 2010 - 2019

www.mpba.biz

Current Situation

 ADL2A in force from

1 st October 2010

 25% aggregate

reduction

on emissions on 2006  Reclassification of temporary buildings 

Generic scheme for hire

 Requirement for as designed

and

as built compliance  Energy Performance Certificate required on completion

www.mpba.biz

New Building Modular

Must comply with new building regulations

As Design Carbon Calculation

As Constructed Carbon Calculation

EPC

Fabric and Services minimum standards

Sale, Rental > 2 years or > 1000m2 individual building compliance required

Rental < 2 years and < 1000m2 generic scheme applies www.mpba.biz

Existing (Relocation) Building Modular

Must comply with new building regulations

As Design Carbon Calculation

As Constructed Carbon Calculation

EPC

Target adjustment factors to allow re-use of older modules

Any new fabric or services must meet minimum standards

Sale, Rental > 2 years or > 1000m2 individual building compliance required

Rental < 2 years and < 1000m2 generic scheme applies www.mpba.biz

Hire Fleet – Temporary Buildings

 Challenges  Temporary building = less than 28 days  Hire fleet requires

either

 Compliance as new/relocate build

or

 Provision of generic calculation  Generic scheme enables retention of majority of services  Electric Heating and Lighting as original specification

www.mpba.biz

Recap

Route to zero carbon 2010 - 2019

www.mpba.biz

Requirements for 2013

Specific Guidance for Part L 2013 Development

 One in One out policy  Do not increase commercial pressure on construction sector  Align with European/Global targets for climate change  Implement smart regulation where possible

www.mpba.biz

Whats been done:

 Active participation in Buildings Regs Working Groups  Regular one to one sessions with CLG  Review meetings with BRE  Submission of full consultation response

Whats next:

 Further detailed discussions with BRE and AECOM  Review of Draft Part L2 (2013)  Impact analysis of new SBEM for 2013  Develop awareness sessions for members

www.mpba.biz

Requirements for 2013

Facts already known

no major structural changes

further 11 or 20% overall reduction

retention of generic scheme

retention of target adjustment factors www.mpba.biz

Requirements for 2013

Items highlighted for change

amendment to BRUKL to clarify modular specific compliance

issues with current implementation of consultation version of SBEM

simplify regulation in relation to heating for small hire buildings

revision to lighting calculation for smaller buildings

consideration of viability of PFC and aM&T for modular buildings www.mpba.biz

Part L2 (2013) Awareness

 Overview of new regulations  Impact of the changes  How to achieve compliance  Highlight any known issues (regulatory or technical) When: Planned for October 2013 (assuming CLG remain to schedule) Where: Central location – Arden Hotel, Birmingham Who Should Attend: Sales, Marketing & Technical Staff £125.00 per delegate Members. £195.00 per delegate Non Members Plus Vat

www.mpba.biz

Conclusion

Zero carbon is the ultimate and inevitable objective.

www.mpba.biz