Jangipur Bengal Mega Food Park
Download
Report
Transcript Jangipur Bengal Mega Food Park
India – 2nd largest producer of fruits and vegetables in the world.
Food Processing in India
- Negligible
India’s share in world business in Processed Foods. - 1.6 %
Food Processing industry constrained by :
• Inadequate infrastructure for post harvest handling, storage
• Fragmented supply chains.
Bountiful
availability of
high quality
raw material
in India
Present small
share in world
market
Tremendous
opportunity for
Food Processing in
India
Govt. of India’s Vision 2015
• Increase Food Processing to 20% and
• Share of world trade to 3%.
Ministry Of Food Processing Industries’ MEGA FOOD
PARKS SCHEME aims to
• Give a boost to Food Processing
• Create comprehensive infrastructure facilities
• Along the value chain from FARM to MARKET,
• In key select locations
I n c l u d i n g J A N G I P U R i n We s t B e n g a l
•
One stop solution for setting up food processing units
in eastern India.
• Ideally located in Murshidabad district - the nucleus of
Eastern India’s food production zone.
• Promoted by Govt of West Bengal - through the State
Horticulture Development Corporation - jointly
with private sector promoters.
• Designed by Mott MacDonald - international
engineering consultants.
Sector specific Industrial Park and an integrated Food
Processing Zone with:
• Comprehensive infrastructure on international standards
• Strong backward linkages to raw materials
• Forward linkages and connectivity to major markets
• Interdependencies of processing units in the Park to
reduce Capital and Operating costs and
increase competitiveness
Location
In the heart of fruit and vegetable producing region in
east India
In West Bengal :
2nd largest producer of fruits & vegetables in India –
annual production - 22 million tons
6 different climatic zones
Tremendous diversity of crops.
On NH 34- connecting Kolkata with NE states, 250 Km
north of Kolkata,
Ideally located to service markets in
East & North East, locally
Nepal, Bhutan and Bangladesh
Export markets through Kolkata
CONNECTIVITY
Road :
NH 34 – 4 Lane in progress
o To Kolkata in South
o To Siliguri in North
Rail :
on Kolkata–Siliguri line - 5 Km from site
on Kolkata–Azimganj line - 8 Km from site
on Kolkata–Lalgola line - 50 Km from site
Air :
Nearest Airport : Kolkata – 250 kms
Helipad : Fully equipped helipad at site
Size
CPC : 250 acres in 2 phases
Ample choice of size - Plots, Ready sheds, Small Scale units
Scope for expansion
Zoning
Dedicated zones for the processing of
Fruits and Vegetables
Milk & Dairy
Grains and derivatives
Education & Healthcare
Well developed facilities in the vicinity
of the project site
Fact File
• Ample Availability of Raw Materials
Production figures in Zone of Influence: 5 districts of PPCs
(Murshidabad, Burdwan, Birbhum, Nadia and Malda)
Vegetables
Fruits
Potatoes
Rice
:
:
:
:
4.5
1.0
2.1
4.1
Million
Million
Million
Million
MT
MT
MT
MT
• Labour
Easy availability of skilled and unskilled
workforce at competitive rates
Government Incentives
Govt. of India
• Grant @ 25% of cost of Machinery and Technical Civil Works,
with a ceiling of Rs. 50 lacs.
•
Expected Special subsidy to units within MEGA FOOD
PARKS
Increase of subsidy to a tune of 150 Lacs.
Loan @ 9.5 % from NABARD.
Government Incentives
Govt. of West Bengal
Grant @ 25% of Fixed Capital Investment (Plants &
Machinery purchase).
Interest Subsidy on Term Loan - Subvention of 7.5% for 5
years.
75% Waiver of Electricity Duty for first 5 years.
Reimbursement of
50% of the expenditure for obtaining ISI / BIS certification.
100% in 1st year and 75% for 7 years on contribution towards ESI &
PF.
50% of expenditure incurred for obtaining Patent Registration.
75% Subsidy on Stamp Duty and Registration Fee.
CST paid for 3 years.
80% VAT paid for 8 years.
Entry Tax for 3 years.
Developed Plots
For large units - 2 acres and above @ Rs 210+ psft
Ready Sheds
For SMEs – 1800+ sq.mtr @ Rs 2,750+ psft
Standard Design Factories
For small enterprises with plug and play facility
of 300+ sq.mtr. @ Rs2,500 + psft
• ROADS
Wide, well paved, illuminated roads with built in drainage :
Arterial roads
:
21 mtr
Other internal roads
:
18 mtr
• POWER
Power sub-station at site : 33 KV, 15 MW (35 MW in Phase II)
• WATER
Ample availability of treated Water from the River Ganges.
Storage capacity - 1 million lit.
• Common ETP /STP
Centralised solid and liquid effluent collection system.
Common Treatment Plant & Solid Waste Disposal Facility.
Bio conversion of organic wastes.
• Transport Terminal :
Truck Terminal with drivers’ amenities.
Bus Terminal for Staff /Workers’ transport
• Backward Linkages
• Assured and consistent supply of raw material,
• in desired quality and quantity,
• for optimal period during the year
• Primary Processing Centers – 6
• Kandi
• Shaikhpara
• Barasat
• Siuri
• Malda Gour Road
• Katwa
• Collection Centers - 17
Other facilities
• Guest House and Dormitory for essential personnel
• Hospitality
• Training & Conferencing, Banking etc.
• Reefer Transport facility to Kolkata
• Assistance in obtaining govt approvals
• Forward linkages to markets
Processing facilities
Preparatory:
Production:
Packaging :
Cleaning, Grading, Sorting
IQF, Spiral Freezer, Pulping,
Bottling,
Canning,
Aseptic
Packing, etc
Testing, QC, Certification: Labs and Equipment
Storage
Cold Storage -Freezer
Minus 18o C :
3,000 MT
CA Storage
0 - 04o C
:
5,000 MT
4 - 10o C
:
10,000 MT
Pre-cooling and Ripening Chambers
Dry warehouse
PROCESSING
Potato based –
o Frozen French fries/wedges/cube
o Potato flakes /powder
o Potato chips
o Extruded snacks
Fruits and Vegetables
o Slice, dices
o Pulp
o Juice
Flour based
o Bakery products: bread, rusk, biscuit, cakes
Edible oils
o Oil extraction and refining
o Repackaging
Milk & dairy
o Ice cream
o Liquid Milk
o Cheese, Yogurt,
o Shrikhand, sweet meat
Snacks - RTS and RTE
PA C K A G I N G & P R I N T I N G
Bottling –
o
Bottle, jars and caps
Canning –
o
Cans
Cups Pouching –
o Multi-layer films
Wrapping Coating Films
Paper and Board –
o Inner and outer paper and board cartons
plain and corrugated
Multi color printing
Site off NH
Entrance Gate
Admin Building – 22700 sq. ft.
5 Factory Sheds – 1800 sq mtr each
12 Factory Units for SMEs – 300 sq mtr each
Ambient Ware House – 8,000 sq mtr
Cold Storage Complex
Potato Store
Deep Freezer
-10,000 MT
– 3,000 MT
F & V Cold Store
IQF
– 5,000 MT
– 1.5 TPH
Staff Quarter & Business Centre – 24,300 sq. ft.
Row Houses - 7 nos. – 1270 sq. ft. each
Helipad – 100 mtr dia
Water Reservoir
33/11 KV Sub-station
33/11 KV HT Substation – Control Room
3 LT Substations for internal power distribution
Arterial Road inside Mega Food Park
o The Friendliest Food Park !
o Assured Backward linkages for optimal use of
processing facilities
o Common Processing facilities and Production Zones to
encourage
Interdependencies of processing units
Lower Capital and Operating costs
Higher competitiveness
o Total Support from GoI and GoWB
• Mega Food Park Co-ordination Committee headed
by DM, Murshidabad for local issues / backward
linkages
• Committee of GoWB - Depts. of FPI&H, L & LR, C & I
and GoI - MOFPI for land matters
The Managing Director
JANGIPUR BENGAL MEGA FOOD PARK LIMITED
Corporate Office
DB-67, Sector – 1,
Salt lake City.
Kolkata – 700 064
Tele fax : +91 33 2334 8775
Site Office
Kulori, Jangipur, Murshidabad
Email: [email protected]
Website : www.jangipurmegafoodpark.com