Transcript Sittwe

1
•Aizawl
•I
N
D
I A
•B A N G L A D E S H
N
D
• ROAD IN INDIA
•I
I A
•Lawngtlai
Myeikwa
(IM Border)
Paletwa
Ch. 158 Km
ROAD
IN
MYANMAR
Kaletwa
(Ch 225 km
•Myanmar
•Kyauktaw
DISTANCES
Sittwe
539 km
Sittwe
Paletwa
158 km
Paletwa
Kaletwa
67 km
Kaletwa
Myeikwa (IM Border)
62 km
Myeikwa
(IM Border)
Lawngtlai
Lawngtlai
100 km
Aizawl
334 km
IWT
Kolkata
•Bay of Bengal
Kaladan Multimodal Transit Transport Project
•Sittwe
Ch. 0.0 km
Project Components …post review
 Fairway development / Sea-dredging in Sittwe port area
 Construction of Port / IWT terminals at Sittwe
 Fairway development / Dredging on Sittwe – Paletwa
stretch of Kaladan river (158 Km)
 Construction of IWT Terminal at Paletwa
 Construction of 6 IWT vessels (300 ton each)
 Highway (129 kms) from Paletwa to Indo-Myanmar Border.
3
Existing Sittwe Port Office
4
Existing Port at Sittwe
5
Existing Loading / Unloading at Sittwe Port
6
Progress made
• MEA issued Letter of Acceptance(LoA) to
Essar Projects India Ltd. in April 2010 at a
cost of Rs. 342 Crores (Approx US $ 75
millions) for the Port & IWT works.
• Agreement between MEA and Contractor
signed in May 2010.
• Port & IWT works to be implemented in 36
months.
7
Progress made… contd.
Govt. of Myanmar has provided land for Construction
& Setting up of Contractor’s camp at Sittwe during
Sep 2010. Permissions for import of Construction
equipments & Opening of bank account in Oct 2010.
8
Progress made… contd.
Ground breaking ceremony attended by
Senior dignitaries from both countries held on
19th December 2010 at Sittwe.
9
Progress made… contd.
• Construction activity at Sittwe started in Dec 2010.
• Consequent to relocation of terminal to Paletwa,
preparation of DPR for New road section between
Paletwa and Kaletwa has become necessary.
• MEA has appointed M/s IRCON Infrastructure &
Services Ltd. New Delhi as the agency for
preparing the D.P.R. for the new road section.
• Design and model testing of 300 DWT Barges has
been completed. Selection of Yard is in final stage.
Barges are to be built in Myanmar.
10
Progress made… contd.
• Reclamation for backup facilities at Sittwe 96%
completed, Construction of Rubble mounted Dyke
70% Completed.
• Construction of Pile work at IWT & Port Approach
Jetty at Sittwe 98% completed. Main Jetty piling
work shall commence shortly.
• Pre-cast concrete works for IWT & Port Jetty at
Sittwe 50% completed.
• Excavation work at Paletwa 15% completed.
11
Reclamation for backup facilities (96%)
12
Dyke Construction work at Sittwe (70%)
13
PILING GANTRY 1
PILING GANTRY 2
14
Piling work at IWT Approach Jetty (98%)
15
Pre-Cast Yard at Sittwe (50%)
16
Excavation work at Paletwa (15%)
17
Progress made… contd.
• Hydrographic Survey at Sittwe Port and also in
between Sittwe – Paletwa stretch was completed
on 2.11.2009 and 20.2.2012 respectively by IWAI
with the assistance from the local Survey agency.
• 6 Nos of Shallow area for dredging in Kaladan river
was identified. 5 Nos of Shallow area was indicated
in DPR (2002).
• The Location of Navigational Aids, Positions of
submerged Rocks and Dredging alignment are to
be demarcated as per the new Survey charts.
18
Hydrographic Survey in Kaladan River
19
Plan of Approach & Harbour channel at Sittwe
20
Layout of Port &
IWT Jetty, Sittwe
21
Layout of
IWT Jetty at Paletwa
22
Important Points / issues
• Approval of General layout drawings for backup
facilities was submitted to Working Committee,
Govt. of Myanmar : on 3.11.2011 for Sittwe.
 on 9.11.2011 for Paletwa
Approvals are yet to be received.
23
Important Points / issues
•
M/s. Essar Projects has already expressed that
they can complete the work within the
scheduled time by mobilising additional
resources subject to the receipt of above
approvals without further delay.
•
Otherwise project may get delayed by another
6 more working months.
24
Thank you