I n s t i t u t e o f N u c l e a r P o w e r O p e r a t i o n s

INPO Engineering – Configuration Management Activities

Presentation to CMBG

Bob Gambrill

Department Manager, Engineering-CM June 20-22, 2011

Carl Faller

Assistant Department Manager, Engineering-CM © 2011 Institute of Nuclear Power Operations

Topics

• • • • • • • Consequences of Fukushima Industry Performance (EN & CM Evaluation Results) Margin Management Engineering Product Quality Digital Systems Technical Conscience Other Emerging Issues © 2011 Institute of Nuclear Power Operations

Consequences of Fukushima

© 2011 Institute of Nuclear Power Operations

IER Level 1 11-1 Overview

• • • • Issued March 15 (rev March 18) Focus is to provide near-term assurance of high state of readiness to respond to both design basis and beyond design basis events Frequently asked questions —clarified intent of recommended actions Walk down and inspection guidelines – Industry drafted, endorsed following INPO review and comment © 2011 Institute of Nuclear Power Operations

Gap Overview

IER 11-01 Gaps Identified by Recommendation 4 - Post Seismic Fire / Flooding Equiq Avail, 30% 1.a - Beyond DBA Equip Availability, 11% 1.b - Beyond DBA Procedures, 12% 3.a - Flooding Equip, 29% 1.c - Beyond DBA Staff Qualification, 3% 1.d - Beyond DBA Plan Agreement/Contract, 2% 2.a - SBO Material / Equip Staging, 4% 2.b - SBO Procedures Executable, 7%

© 2011 Institute of Nuclear Power Operations

IER 11-1 General Trends / Themes

• SAMG programs / processes have not been updated to reflect changes to plant configuration • • • • • • Required equipment no longer exists Procedure execution weaknesses Contract elapsed / no longer valid Required tools / equipment not staged Material not properly maintained Design vulnerabilities exist © 2011 Institute of Nuclear Power Operations

IER 11-2, Spent Fuel Pool Loss of

Cooling and Makeup

Issued April 26 Increase sensitivity to SFP storage event response 1.

2.

3.

4.

5.

Verify shutdown safety provisions applied to SFP during outage Apply increased protection for SFP during operating modes while heat load remains high Provide time to saturation conditions to control room and emergency response staff Abnormal operating procedures address loss of cooling and makeup Emergency procedures contain precaution for monitoring SFP level and temperature © 2011 Institute of Nuclear Power Operations

Fukushima - Next Steps

• Review and consider EAG Working Group recommendations • Detailed Fukushima event timeline and causes • • • Industry lessons learned working meetings New IERs to address other Fukushima lessons learned SBO / focus on AC power © 2011 Institute of Nuclear Power Operations

Industry Performance

(CM & EN Evaluation Results) Categories of AFIs (through end of 1 st Qtr 2011)

16 14 12 10 8 6 4 2 0 2008 2009 2010 2011 Performance Categories © 2011 Institute of Nuclear Power Operations

Margin Management

Ongoing department focus area • Most stations have performed gap analysis to INPO 09 003,

Excellence in the Management of Design and Operating Margins,

and addressed identified gaps.

• Examples of Performance Gaps: … issues that could adversely affect margin not consistently identified and prioritized as margin issues and integrated with the priority of other station issues ... … several margin issues not identified and adequately evaluated for resolution ... © 2011 Institute of Nuclear Power Operations 10

Margin Management

Contributors: …. lack of process / expectation guidance to review SSC deficiencies for potential impact on operating margin … insufficient management oversight to ensure margin issues are identified, tracked, and resolved; insufficient procedural guidance contributes ... … site personnel have insufficient understanding of program requirements / expectations © 2011 Institute of Nuclear Power Operations 11

Engineering Product Quality

• Focus is on the quality of the modification (produced in house or by engineering service provider) when released by Engineering • • Typically 10 AFIs / year (1/3 vendor, 2/3 in house) Examples of Performance Gaps: … key design inputs not sufficient to assess the affect the modification will have on plant equipment … … validation and testing of modifications not adequate to ensure the modifications performed intended functions .. … (vendor associated) undetected errors in engineering products provided by vendors … © 2011 Institute of Nuclear Power Operations 12

Engineering Product Quality

Contributors … not being thorough with assumptions (e.g. not recognizing an assumption was made, not verifying) … cross cutting weak human performance … … weak failure modes affects … … (for vendors) inadequate engineering oversight and review of vendor supplied products ..

… (for vendors) insufficient specification, missed verification of design requirements during owner acceptance reviews, compressed project schedules, lack of intrusive oversight of vendor activities … © 2011 Institute of Nuclear Power Operations 13

Product Quality – Industry Aggregate

Engineering Fundamentals Knowledge Worker Process Performance

(Product Quality)

Challenge Boards, Design Review Boards Technical Risk Assessment Tools

Tools & Techniques

Observations HU Tools

Training

(to Improve Performance)

Employee Development Performance Indicators Quality Review Teams

Monitoring Performance

(Product Quality)

Post Product Critique © 2011 Institute of Nuclear Power Operations 14

Digital Systems

• Digital system issues continue to result in consequential events, some resulting in plant scrams (six scrams in past two years linked with digital).

• Evaluation findings (2009 and 2010) – 6 AFIs and 3 PDs – causes / contributors: • missed design attributes and failure modes • • • • insufficient review / validation of vendor-supplied firmware weaknesses in control of vendor software and testing modifications not adequately specified on drawings specifications not adequately reviewed and tested © 2011 Institute of Nuclear Power Operations

Digital Systems

– 3 Strengths • Project Management • Thoroughness of pre-installation testing • Debbie Williams Process controls & guidance, early procurement of hardware, and diversified testing methods • INPO actions – – – – Annual digital upgrade working meetings Improve reporting of industry OE Involvement with EPRI and ISA working groups Good Practice:

Improving Engineering Quality in Digital System Projects

– Issued October 2010 to identify lessons learned and recommended practices in key areas © 2011 Institute of Nuclear Power Operations

Digital Systems

• INPO actions Related to Cyber Security – EPIX trend codes developed to collect digital issues; includes codes for cyber .

– Developing training modules for cyber assessment teams and general awareness (June /July 2011) and technical training (November 2011). – Developing a web page on INPO member site to share information related to cyber security.

– Reviewing INPO documents and evaluation process for inclusion of cyber security attributes. (1 st quarter 2012).

© 2011 Institute of Nuclear Power Operations

Technical Conscience

Frequently Asked Questions

© 2011 Institute of Nuclear Power Operations 18

What are INPO’s expectations for use of the preliminary document ?

• • • • Incorporate the principles into ongoing organizational activities used to reinforce and anchor nuclear safety culture and professionalism of nuclear personnel.

INPO evaluation teams will use the principles documents to help identify and communicate causes and contributors to weak performance.

Sites are expected to provide feedback to INPO based on experiences with use of the preliminary documents.

We do not expect anyone to create an indicator to monitor TC or OF performance.

© 2011 Institute of Nuclear Power Operations

What is the relationship between the TC principles document and other INPO documents ?

• Other principles documents • Performance Objectives and Criteria • SOER 10 02, “Engaged, Thinking Organizations” © 2011 Institute of Nuclear Power Operations

How is the industry using the TC principles document to enhance performance?

• • • Performing a gap analysis of performance in comparison to the principles documents Reinforcing the principles during department and station meetings Training – Familiarization/Reinforcement – Case Studies – reviewing the principles to discuss how they were (or should have been) applied during plant activities © 2011 Institute of Nuclear Power Operations

Technical Conscience

• • • • INPO Engr-CM perspective: Overall, well received Helping to frame staff’s thinking and communications Based on feedback, do not anticipate any major changes to the finalized document Many sites in the process of training (approach varies) Basic Power Point Overview Increasing Effectiveness Detailed Training w/ DLA & • • • modules tailored to: Sr Leadership (all) Engr Leadership Individual Contributors © 2011 Institute of Nuclear Power Operations 22

Emerging Industry Issues

• • • Refocus on fundamentals and thinking vs. high reliance on process Time critical operator actions Consequences from Fukushima (to unfold over several years) © 2011 Institute of Nuclear Power Operations Next Presentation 23