Transcript IPC III
PELINDO III INDONESIA PRESENTATION ON 36th ASEAN PORTS ASSOCIATION MEETING CAMBODIA, 8 - 11 DECEMBER 2010 INDONESIA PORT CORPORATIONS IPC I Medan IPC II Jakarta Surabaya Makassar IPC IV IPC III Indonesia Port Corporation I Indonesia’s state-owned port companies: Indonesia Port Corporation II Indonesia Port Corporation III Indonesia Port Corporation IV PROFILE OF INDONESIA PORT CORPORATION III 43 Ports 2 Business Units 5 Subsidiary Companies 1. 2. 3. 4. 5. PT. TPS (Container Terminal) PT. BJTI (Logistics) PT. RSPS (Hospital) PT. Portek Indonesia (Equipment) PT. Ambapers (Channel Operator) Serve 88.641.069 people (40.50% of total population) IPC III Total area : 248.524 KM2 (13% of total area in Indonesia) Operations area : 7 provinces out of 33 provinces in Indonesia IPC III IN TRANFORMATION IPC III Terminal Operating Company Port Operating Company CORE BUSINESS SUPPORTING BUSINESS • Stevedoring • Terminal operation • Depo, warehouse, water supply, ship repair. IPC III MAJOR PROJECTS Surabaya Western Access Channel (SWAC) Teluk Lamong Multipurpose Terminal Benoa Cruise Terminal PELIND O III ANGKA SA PURA DENPAS AR SELATAN SANUR * Notes : Usulan Rute Tol Baru Land or Mangrove Edge NUSA DUA TOURIST RESORT SURABAYA WESTERN ACCESS CHANNEL APBS IMPROVEMENT THREATS SHIPPING LANES • Length • Width • Depth • Total SBN : 25 mil laut : 100 Meter : 9,50 M LWS : 18 buoys + 7 (NEW) LOCATION COORDINATE IN TANJUNG PERAK : 112° 43’ 22” BT 7° 11’ 54” LS Water area Land area 6 PORT OF TANJUNG PERAK : 1.547,3 Ha : 574,7 Ha DEVELOPMENT PLAN OF SWAC No.1 Current Width : 100 Meter Depth : - 9,50 M LWS Capacities: 27.000 Moves/Years 3 Area Anchorage CHANNEL WIDTH 100 m DEPTH -9,5 m 5 SWEBERCON QUEST 2 JAVA 7 PILOT STATION Kr. Jamuang 9 Pipa Gas Lama 4 Lebar 100 m LWS 9,5 m 11 Buoy MAFIA Lebar 150 m LWS 10 m - 11 m 6 13 MADURA 15 Future Width : 200 Meter Depth : - 14 M LWS Capacities : 58.000 Moves/Years Maspion 8 Area Anchorage Smelthing Petro Kimia Alpha DMB 88 Dermaga Gresik PLTU Area Anchorage 10 Rede Tg. Perak Surabaya PORT OF TANJUNG PERAK SURABAYA TELUK LAMONG MULTIPURPOSE TERMINAL (1) 1. Accommodate overflow of Tanjung Perak Port. 2. Increase Capacity. 3. Built on an artificial island in area of 50 hectare. 4. Structures Causeway : 1.280 M Berth : 51.200 m2 (1.280 x 40m) Container Yard : 364.800 m2 (9.600 ground slots) 5. CY Capacity : 1.708.200 Teus/Years 6. Support Facility : Causeway, Bridge, Gate in/out, office, road and workshop, parking area, CFS. TELUK LAMONG MULTIPURPOSE TERMINAL (2) Activities that have been done : - Feasibility study - Detailed Engineering Design - Bidding process for civil construction - Earth breaking to commence construction 9 BENOA AS CENTER OF CRUISE DESTINATION CRUISE SHIP TO INDONESIA (2010) 236 CALLS PROPOSED DEVELOPMENT OF BENOA DENPASAR SELATAN SANUR PELINDO III ANGKASA PURA * Notes : Usulan Rute Tol Baru Land or Mangrove Edge New Island (marina &Fishery) Cruise Ships Rute Tol Awal NUSA DUA TOURIST RESORT INTERNATIONAL CONVENTION HALL BENOA DEVELOPMENT PLAN (1) SHORT TERM PROGRAM BENOA DEVELOPMENT PLAN (2) SHORT TERM PROGRAM - Deepening and widening port basin - Straightening acces channel I BENOA DEVELOPMENT PLAN (3) MASTERPLAN