CBM Responsibilities Spirit AeroSystems Inc.

Download Report

Transcript CBM Responsibilities Spirit AeroSystems Inc.

Predictive Maintenance Technologies
Spirit AeroSystems Inc.
•
Ed Fenn–
–
–
–
–
•
Don Chrisman
–
–
–
–
•
Twenty-eight years with Spirit/Boeing
Electrical background
Twenty-four years facilities management
Responsibilities include machine tool retrofit, facilities network, industrial controls and reliabilitycentered maintenance
Retrofitted over 385 machines and responsible for one patent
Thirty-one years with Spirit/Boeing
Twenty-years experience maintenance mechanic
Twenty-years experience as a vibration technician
Level 2 vibration certification
Todd Shepherd
–
–
–
–
Twenty-nine years with Spirit/Boeing
Twenty-five years experience maintenance electrician
Four years experience thermography technician
Level 2 thermography certified
Predictive Maintenance Technician
Spirit AeroSystems Inc.
Oil Analysis
Vibration Analysis
Laser Alignment
Ultrasonic
Thermography
Mission Statement
• To communicate accurate information through the use of trend
analysis, pattern recognition, statistical process analysis and
device limit ranges to aid in increasing machine life cycle and
machine availability.
Oil Analysis
• Affects on Machine Devices
1.
2.
3.
4.
5.
6.
7.
8.
Pumps
Oil tank
Flow control value
Pressure relief valve
Cylinders (counter balance)
Directional control valves
Throttle valve
Heat exchangers
Oil Analysis (cont.)
What we measure
• Fluid Properties
– Viscosity analysis
– FTIR – Fourier transform infrared spectroscopy
– Element analysis
• Contamination
– Particle count
– Moisture analysis
– Patch Test
• Wear Debris
– Wear debris density
– Analytical ferrography
– Elemental analysis
Vibration Analysis
• Periodically collect and analyze vibration data on machine
tools and components
• Install remote collection boxes and permanent mount
accelerometers
• Field balancing on fans and blowers
• In Shop balancing (Balance Stand) on fans, blowers and
rotating components
Vibration Analysis (cont.)
• Laser shaft alignment on rotating equipment (except
process pumps)
• Laser sheave to sheave alignment
• Acceptance Testing on new equipment and components
• Assist shop personnel in troubleshooting suspect bearing
and alignment problems
• Ultrasonic testing
Thermography
• Periodically inspect electrical components and control cabinets
for heat related issues
• Assist shop personnel in troubleshooting suspect electrical
problems
• New equipment acceptance testing
Thermography (cont.)
• Aids in identifying bearing and coupling problems in rotating
equipment
• Identify heat exchanger problems
• Identify problems in heating and cooling coils
• Identify insulation problems with ovens and furnaces
• Identify problems with oven and furnace door seals
Effects of Vibration on Equipment
Vibration Issues - Loop Pump
• Definition of resonance and demo
• Base resonance - causing vibration limits to be exceeded
during New Equipment Acceptance Testing
Vibration Issues – Loop Pump
• First attempt to qualify new loop pump, concrete pad not
adhered to floor
• Second attempt, resonant condition in pump base identified &
eliminated by creating animation to identify flexing points
• Reasons for animation before adding gussets
Vibration Issues w/ Loop Pump
First Attempt – Concrete not adhered to floor, noticed
base moving during data collection. Contractors
corrected by bolting concrete pad to concrete floor.
Vibration Issues – Loop Pump
Vibration Issues w/ Sump Cover
• Resonance condition in sump cover causing premature
failure of pump bearings
Laser Alignment
Shaft to Shaft
Laser Alignment
Sheave to Sheave
Balance Stand
Balance rotating components
Thermography
LIEBERT UPS
MILL
Fuse
STRECH PRESS
Pump
COLD BOX
Questions