Transcript Implementation of River Information System on the Bulgarian Part of
OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013
Implementation of BulRIS Project
BULGARIAN PORTS INFRASTRUCTURE CO.
RIS Workshop Danube Commission
April 11, 2011 Budapest
Kuzman Genov
ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia
Agenda:
Project Overview System Components
Tracking & Tracing Voice VHF Communication System ERI Data Gateway Notices to Skippers Communication Infrastructure AIS and VHF Network Layout & Design Construction Works What next ? - Phase II and III
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
Project overview - General
Project duration 18 Months
Start: May 2010
End: November 2011
Contracting Authority: Bulgarian Ports Infrastructure Co.
Budget 5.6 Mil €
Project is co-funded by EFRD - Operational Program on Transport 2007 – 2013
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
Project Overview - Project Goals
To establish the required base infrastructure for RIS operation on the Bulgarian part of Danube
Communication infrastructure Tracking and tracing (AIS) infrastructure Voice VHF Communication System ERI Data Gateway
Notices to Skippers
To apply DIRECTIVE 2005/44/EC of the European Parliament and of the Council
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
Project Overview – Implementation Schedule
Task 1: Inception report and planing (completed) Task 2: System design (completed) Task 3: Construction (in progress) Task 3: Software development (completed) Task 4: System installation (in progress) Task 5: System integration (Q2-Q3’2011) Task 6: Testing and training (Q3-Q4’2011) Task 7: Migration to real life operation (Q4’2011)
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components - Tracking and Tracing
AIS based system
8 sites
Exchange of actual, safety related information between ships and shore
Client – Server architecture
Web interface
Functions:
Provision of a TTI/STI
Provision of traffic management or fairway information services
Web access for logistic users
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components - Tracking and Tracing
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Tracking and Tracing - Additional AIS functions dGPS trough AIS network
Improves the accuracy of the vessel positioning
Functions:
Correction of GPS positioning
Compliant with international recommendations
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System components - Voice VHF Communication Network
8 sites along Bulgarian Danube
Cohabitation with AIS base stations
Independant system
Integration and data exchange with AIS
Graphic presentation of the vessels position
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components - ERI
Allows simplification of cross border procedures Functions:
Data exchange between vessel and competent authorities Available via web application Access according to the user rights Users:
Vessel parties Competent authorities Compliant with European and international standards
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components - ERI
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components – Data Gateway
National and international exchange of RIS data Functions:
Provision of relevant RIS data Interface to T&T, ERI and Hull system Web based users interface Users:
Governmental users
Commercial users Different data access rights have to be defined
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components – Data Gateway
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components – Notices to Skippers
Used for fairway information, traffic information and management as well as voyage planning
Functions:
Users:
Available via web service
Automatic translation on 23 languages
Input information for voyage planning
Traffic/Fairway authorities
Harbour Master’s Offices/Port authority
Police
Shippers
Skippers/Captains
Inspection and customs authorities
Compliant with European standards
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components – Notices to Skippers
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components – Communication Network
Total of 16 sites
14 radio reley links
1 dedicated optical link
1 MAN link
Interlinked togeather to form a closed network
Network is invisble to outside world
Hack proof
Used for AIS and VHF communication
Real time data replication between Ruse and Varna backup centre
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
System Components – Communication Network
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
AIS and VHF Network - Locations
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
AIS and VHF Network – Radio Coverage
(c) Kongsberg Seatex AS
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI of the Client Application 1/2
(c) Periskal
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI of the Client Application 2/2
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI AIS WEB Application 1/2
(c) Periskal
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI AIS WEB Application 2/2
(c) Periskal
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
Construction Works
Scope of works
Design Evaluation of radiation influence Obtainig building permits
Site construction Exploatation permits
4 new sites
Other sites are existing sites owned by Bulgarian telecom
Implementation of River Information System on the Bulgarian Part of Danube - BulRIS
What next? – Phase II and III
Construction of the RIS Center building
Conceptual design finalized Technical project – start in May 2011
Construction works – start in fall 2011 In operation – end of 2012 Upgrade and development of the services (pre-project study)
Automatic water level measurement/modeling RIS portal
WLAN access to RIS services Calamity abatement services ………………………………………
THANK YOU FOR YOUR KIND ATTENTION Kuzman Genov [email protected]