SC A3 (High Voltage Equipment)

Download Report

Transcript SC A3 (High Voltage Equipment)

A3-14 (AG01) 018 IWD
SCA3 meeting, Delft (Neetherlands), March 12, 2014
A. Mercier (Convener)
WG: A3.35 report
Guidelines and Best Practices for the Commissioning of Controlled
Switching Projects based on Knowledge and Worldwide Experience
1. Members
2. Kick-off meeting
3. Homework status (WEB tool, guides, logo, …)
–
Question about the PDF files in our WEB site …
4. Next meeting
SC-A3 (High Voltage Equipment)
SCA3 meeting, Delft (Netherlands), March 12, 2014
1) Members
Total number: 26 (17 regular, 9 corresponding)
SC-A3 (High Voltage Equipment)
SCA3 meeting, Delft (Netherlands), March 12, 2014
1) … Member list for approval by SC A3
A3.35 Regular members
André Mercier
(Convener)
Farid AIT
ABDELMALEK
Hans-Georg
Richter
Stephan Schoft
Michael Stanek
Haruhiko Koyama
Bjorn Lofgren
Jön Rogers
Trond Magne
Ohnstad
Dr. Li Zhibing
Lucas VIOLLEAU
Nan Zhenle
Xu Lei
HAN Bin
Zaixing Peng
Mr. Kwak, Joosik
Wasin Albitar
Hydro Québec (IREQ)
Canada
Alstom Grid
France
Siemens
Germany
ABB
ABB
Mitsubishi
Siemens
Siemens
Germany
Switzerland
Japan
USA
USA
Statnett
China EPRI (on behalf of SGCC)
RTE
Xi’an XD Switchgear Electric co., LTD
NR ELECTRIC CO., LTD
China Electric Power Research Institute
Electric Power Research Institute,
China Southern Power Grid
Korea Electric Power Corporation,
Research Institute/ Power Transmission
Laboratory
Brown-Boveri-Str. 30, 63457 HanauGrossauheim, Germany
Norway
China
France
China
China
China
China
A3.35 Corresponding members
Hiroki Ito
Vincent Marec
Angélica Rocha
Jorge Amon Filho
Yvon Filion
Pierre Taillefer
Jose Lopez-Roldan
Carlos Deligi
Helio Pessoa de
Oliveira Junior
Korea
Germany
SC-A3 (High Voltage Equipment)
Mitsubishi Electric
Corporation,
G&W Electric Co.
Companhia Energética de
Minas Gerais, CEMIG
Electrobras FURNAS
Hydro Québec (TransÉnergie)
VIZIMAX
Powerlink Queensland
Qualitrol
ONS
Japan
USA
Brazil
Brazil
Canada
Canada
Australia
USA
Brazil
SCA3 meeting, Delft (Netherlands), March 12, 2014
2) Kick-off meeting
1) Rio de Janeiro, Brazil (January 22-24, 2014)
2) 14 members attended, and 3 guests
3) Problems getting a VISA in a short period of time prevented China
members to attend
4) Proposed agenda was accepted (slight modification):
• Review of SC A3 activities, WG TOR, member guidelines,
working methodology, objectives, deliverables, …
• Member presentations
• Discussions on the first 3 main tasks: Questionnaire, literature
survey, technical brochure
• Technical visit to Adrianópolis substation
SC-A3 (High Voltage Equipment)
SCA3 meeting, Delft (Netherlands), March 12, 2014
2) … Kick-off meeting
5) Decisions:
•
CIGRE WEB tool will be mainly used for
documentation/communication exchange
•
file naming convention: A3-14(WG35)IWD_###_tttt_Rrr-xxxxxx
(where “14” is the year of document creation, “###” is the document
serial number within the year (or incremental?), “tttt” is the document
type, “rr” is the revision number, “xxxxxx” is a brief description)
•
2-3 meetings per year (as needed), for 1.5-2 days
•
4 task leaders were nominated:
•
•
T. Ohnstad : questionnaires (1 for the manufacturers, 1 for utilities)
•
P. Taillefer : literature survey (assisted by André)
•
A. Mercier : technical brochure and the WEB site
•
C. Deligi (with P. Taillefer) : new logo (because of some copyright concerns)
Next meeting in Montréal (A. Mercier will make arrangements)
SC-A3 (High Voltage Equipment)
SCA3 meeting, Delft (Netherlands), March 12, 2014
3) Homework status
1) Position of secretary is still open
2) WG A3.35 WEB site has been set properly
3) Only 2 members do not have access yet to our site
4) Guidelines have been prepared and sent to members (how to
access the site, how to get documents, how to exchange)
5) Interactive database of our initial documentation is now acccessible
(abstract, authors, keywords, year, but not yet including the PDF
files)
6) A new Logo is being created and the best results will be proposed to
members at the next meeting
Question to SC A3: Are we allowed to put in our CIGRE WG WEB site the PDF
files (from IEEE, CIGRE, etc.) for our internal use?
SC-A3 (High Voltage Equipment)
SCA3 meeting, Delft (Netherlands), March 12, 2014
4) Next meeting
1) Next meeting in Montréal (A. Mercier will make arrangements)
2) A preliminary agenda has been sent
3) Homework progress will be followed closely before the meeting
4) Proposals for the third meeting should be received before the
second meeting (where it will be discussed)
(the use of the forum tool in our WEB site is recommended).
SC-A3 (High Voltage Equipment)