Transcript Attachment M - 17N Task Group Status Report
Revision of API RP 17N
Subsea Production System Reliability, Technical Risk
& Integrity Management
Don Wells (Hess)
Agenda
• Introduction • Membership • General Plans / Progress • Detail Progress • Integration 17 Committee/ISO
Introduction
• Incorporate Integrity Management into current API 17N
…Subsea Reliability and Technical Risk Management
• Recognize and incorporate integration with other Industry initiatives • Incorporate updates based on feedback from using existing 17N document • Respond to recent industry experiences
Membership
• Organized into subcommittees 1. Design and Decommission 2. Manufacture, Assembly, SIT, Installation, Commissioning 3. Operations 4. Technology Qualification 5. Regulations • Room for additional membership • Opportunity to Make a Difference
Membership
• • • • • • • • • • • • • • •
Chairman 2012
Don Wells – Hess
Co-Chairman
John Allen - GE Mark Siegmund – BP
Champion
John Strutt - Astrimar
Record Keeper
Adriana Botto
Membership
– Wood Group I.M. Lars Buus - DNV David Valentine – NASA – United Space Alliance Denver Roopchand – Atkins Dane Tipton – National Coupling Fuad Ahmad – Petronas James Cencula – GE • • • • • • • • • • • • • • • • Graeme Davies – DNV John Fassero – ExxonMobil Karl Woods – Woodside Martha Viteri – DNV Michael Taylor – FMC Mzahid Mamot Paul Kefford – Petronas – Chevron Reza Mostofi – DNV Ronald Pechacek Space Alliance – NASA – United Stephen May – Cameron Mike Theobald – Maersk Oil Karina Vitale – Chevron Runar Østebø – Statoil Jason Strouse – National Coupling Anibal Dam – BP John Macneill – Stress Engineering
Mandate / Goals
• Add Integrity Management to Current Document – Incorporate into all existing KPs & Stages from Concept to Installation / Commissioning • Add an Operations Stage / Section • Change Tone from Production to Integrity – Current tine reflects maximizing production – Will add Broader Integrity • Environment, etc.
• Decide on Prescriptive vs. Safety Case • Ensure Tie-in with other API documents – i.e. API 17 V
General Progress
• 2010 – 2011 – Storming and forming -
Complete
– Gap Analysis –
Mostly Complete
– Added Runar Østebø – Statoil & convener of ISO/TC67 WG4 • 2012 -
Planned
– Define Tone (prescriptive / recommend) – Work the Gaps – Work the Interfaces – Industry Peer Assist Workshop (SURF IM Forum)
Detailed Progress
• Define Scope _ • Define Charter _ • Divide and Conquer…..Regular Subcommittee meetings
1. Design and Decommission
• New Key Process (KP) for Through Life under development • Does API want Risk Based or Safety Case Approach? (Hybrid?)
Detailed Progress
Divide and Conquer – cont.
2. Manufacture, Assembly, SIT, Installation, Commissioning
• Matrix Developed • Where & How to test being worked • Does Verification and Validation need new KP? (Rewrite KP06?) • MOC being worked
Detailed Progress
Divide and Conquer – cont.
3. Operations
• Reviewed and Raised issues with existing 12 KPs • Proposed 3 additional KPs – Field Modifications – Inspection and Monitoring – Remedial Intervention • Added 3 Processes to “Project Phase Guide to Processes ”
Detailed Progress
Divide and Conquer – cont.
4.
Technology Qualification
• New Risks Identified – commercial obsolescence • Keep integrated as a section in API 17N • Utilize DNV RP A-203 as much as possible • Completed Activities – Received industry feedback on main challenges with Qualifying Technologies – Strawman created for TQ section • Activities in Progress – Drafting started – Defining the proper use of TRLs • Path Forward – Consolidate and review individual sections
Detailed Progress
Divide and Conquer – cont.
5.
Regulations
• Managing Committees 1-4 Interfaces • Will lead Prescriptive vs. Recommend discussions • On hold until more definition / decisions from other committees
Path Forward
• Path Forward – Continue Subcommittee work – Outline of Process to use as QA tool – Common Matrix to combine / review completed work – Work the idea of using SURF IM Forum to discuss with industry and gather additional input • Write • Review • Ballot –
still aiming for year end 2012
Integration
• API 17A, API Q1 • ISO – 14224 - Collection and exchange of reliability and maintenance data for equipment – 20815 - Production assurance and reliability management – 15663 - Life Cycle Costing – TR 12489 - Reliability modeling and calculation of safety systems • Review committee draft document • Feedback 17N specific comments • DNV RP A203/API RP 17Q?