JOB HAZARD ANALYSIS & RISK ASSESSMENT FORM

Nor Aini Burok

JOB HAZARD ANALYSIS & RISK ASSESSMENT FORM (until June 2013) JOB SAFETY ANALYSIS & RISK ASSESSMENT FORM (From Sept 2013) Nor Aini Burok

ACCIDENT IN LAB 1

• A fatal accident happened in an organic chemistry laboratory at the University of California, Los Angeles (UCLA) in late December, 2008. •

A research assistant was using a syringe to transfer about 50 mL of a pyrophoric chemical (a substance that catches fire spontaneously once exposed to air), tert-butyl lithium, dissolved in pentane, a flammable solvent.

The plunger suddenly came apart from the syringe barrel, causing the pyrophoric chemical to spew onto the hands and body of the researcher and catch fire. • Even though the fire was finally put out by other laboratory workers, the researcher suffered

second to third-degree burns

to over 43% of her body.

She died in January 2009 due to the burns

and the resulting complications, after 18 days in the hospital.

ACCIDENT IN LAB 2

• • One student, Preston Brown, 29, was seriously injured in the Jan. 7, 2010 accident and remains in critical condition, Brown received officials told compound.

severe burns and lacerations to his face and hands

in Texas Tech's chemistry building,

when a mixture of nickel hydrazine perchlorate exploded during the afternoon accident

according to a police report. University

CSB the accident involved the detonation of a high-energy metal

I F N I D N G S 1

Inadequacy

of hazard identification & risk assessment. 2

No or inadequacy

safety training .

In any case, there was no safety training record available. 3

Inadequate supervision and

unsatisfactory

safety management.

POLICY FOR FYP AT MICET

ALL FYP STUDENTS COMPLETE JOB SAFETY ANALYSIS & RISK ASSESSMENT TO ELIMINATE AND MINIMIZE RISK OF ACCIDENT IN LABORATORY

JOB SAFETY ANALYSIS PROCESS FLOW CHART.

Wk 1 - 4

• FINAL YEAR PROJECT Coordinator (from each section) will submit list of FYP student for respective semester to SAFETY AND HEALTH OFFICER.

• Student will attend Final year project briefing in Wk 2 (latest).

• Student will submit proposal for supervisor evaluation.

Wk 4

• Student will confirm the method & chemical used in their FYP.

• Student will prepare Job Safety Analysis[DO NOT FORGET TO DISCUSS WITH TECHNICIAN IN-CHARGE (TIC) & YOUR SUPERVISOR AND OBTAIN THEIR APPROVAL].

• Submission of JSA to receptionist and stamped with DATE RECEIVED>

Wk 5

• Student will submit completed Job Safety Analysis for approval to Safety and Health Officer (SHO).

JOB SAFETY ANALYSIS PROCESS FLOW CHART

cont….

Wk 6 • SHO will evaluate the completed Job Safety Analysis.

• Once approved, notification will be done by memo on the soft board/ SMS.

TO • Prior starting the experiment, student must submit the ORIGINAL Job Safety Analysis to theTIC of the main (mostly used) laboratory use. [NO JSA, TIC WILL DISALLOWED STUDENT TO USE OF THE LABORATORY]. Wk 8 • Student need to submit a copy of Job Safety Analysis to another TECHNICIAN in-charged in another laboratory [if more than one lab is going to be used].

TO JOB SAFETY ANALYSIS PROCESS FLOW CHART

cont….

• JOB SAFETY ANALYSIS MUST ALWAYS AVAILABLE IN THE LABORATORY FOR REFERENCE [specially IN EMERGENCY SITUATION].

END OF FYP DURATION

• AT ANY TIME, IF WORK AFTER OFFICE HOUR IS REQUIRED. YOU MUST OBTAIN THE APPROVAL FROM HEAD OF SECTION & SAFETY AND HEALTH OFFICER PRIOR STARTING THE WORK BY COMPLETED THE FORM IN SECTION 8a.

JSA & RA PREPARATION AND APPROVALFLOW CHART

1. Confirm title & supervisor 6.PUBLICATION ON NOTICE BOARD OR COMMUNICATED VIA SMS .

2. Prepare proposal & confirm method with supervisor 7. COLLECTION OF JSA & RA FORM 8. SUBMISSION OF ORIGINAL APPROVED FORM TO TECHNICIAN 3. Prepare JSA & RA With technician & supervisor review & approval 4. Submission of JSA & RA form to receptionist. Latest by Wk 5 /Sem 1 5. Approval of JSA & RA Form 9. ANY CHANGES (Like method or etc) 10. WORK AFTER OFFICE HOUR

JOB SAFETY ANALYSIS & RA FORM

1.

2.

3.

JSA & RA

Form.doc

Material Safety Data Sheet (MSDS)

FIRST SCHEDULE of ENVIRONMENTAL QUALITY (SCHEDULED WASTES) REGULATIONS 2005.

• 1.

Consist of 11 parts.

Title of procedure / experiment.

2. Name of author & contact number.

3. Name of supervisor { & co-supervisor}.

4. Method / Procedure.

5. Hazard Identification and Control measures

a. Substances used which have potential to cause harm; i.e potential hazards.

b. Equipment used in the procedure which may cause harm c. Laboratoy / laboratories required d. First Aid and Fire fighting equipment available

6. Disposal routes for waste materials

7. Risk assessment and precaution to be taken ( in statement) 8. Level of supervision and suitability for out-of-work a. Out-of work approval b. Emergency contact number 9. Evidence of Review and checked by laboratory technician and supervisor.

10. Details of other student involved in the project/procedure 11. Review Section [TO BE FILLED BY POSTGRADUATE ONLY].

Any Question ?